Laserfiche WebLink
SWRCB,January 2002 AtUFLI v EE <br /> 5. SECONDARY PIPE TESTING 5 <br /> Test Method Developed By: X Piping Manufacturer Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) — to <br /> Test Method Used: XPressure Vacuum ❑Hydrostatic t;r_�.T�jnr•o�o er^h'1 <br /> ❑Other(Spec) <br /> Test Equipment Used:Pressure Gauges in PsiiV il,ogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run# I Piping Run#2 Piping Run#3 Piping Run#4 <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" 3" <br /> Length of Piping Run: Approx. 145' Approx. 145' Approx. 160' Approx.90' <br /> Product Stored: Regular 87 Plus 89 Super 91 Diesel <br /> Method and location of Test boot at STP Test boot at STP Test boot at STP Test boot at STP <br /> piping-run isolation: Piping Sump#1 Piping Sump#2 Pi niz Sump#3 Pi in Sum #4 <br /> Wait time between applying 10 Minutes 10 Minutes 10 Minutes 10 Minutes <br /> pressure and starting test: <br /> Test Start Time: 10:00 10:15 10:25 10:55 <br /> Initial Reading(R,): 3 Psi 3 Psi 3 Psi 3 Psi <br /> Test End Time: 11:00 11:15 11:25 11:55 <br /> Final Reading(RF): 3 Psi 3 Psi 3 Psi 3 Psi <br /> Test Duration: 1 Hour I Hour 1 Hour I Hour <br /> Change in Reading(RF-Rt): 0 Psi 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: Pass Pass Pass Pass <br /> Comments— (include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> Piping Run#4 Diesel Secondary Pipe Test Boot will not maintain proper seal for Test. <br /> Piping Run#4 Diesel Secondary Test Boot replaced to obtain proper seal for Test. <br />