My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
18662
>
2300 - Underground Storage Tank Program
>
PR0505356
>
COMPLIANCE INFO_2010 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:32 AM
Creation date
11/4/2018 5:30:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2015
RECORD_ID
PR0505356
PE
2361
FACILITY_ID
FA0006733
FACILITY_NAME
GEORGES BP MINI MART
STREET_NUMBER
18662
Direction
N
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
01
SITE_LOCATION
18662 N HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\HWY 88\18662\PR0505356\COMPLIANCE INFO 2010 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2010 - 2015
QuestysRecordDate
2/1/2018 7:40:19 PM
QuestysRecordID
3779163
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 AtUFLI v EE <br /> 5. SECONDARY PIPE TESTING 5 <br /> Test Method Developed By: X Piping Manufacturer Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) — to <br /> Test Method Used: XPressure Vacuum ❑Hydrostatic t;r_�.T�jnr•o�o er^h'1 <br /> ❑Other(Spec) <br /> Test Equipment Used:Pressure Gauges in PsiiV il,ogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run# I Piping Run#2 Piping Run#3 Piping Run#4 <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" 3" <br /> Length of Piping Run: Approx. 145' Approx. 145' Approx. 160' Approx.90' <br /> Product Stored: Regular 87 Plus 89 Super 91 Diesel <br /> Method and location of Test boot at STP Test boot at STP Test boot at STP Test boot at STP <br /> piping-run isolation: Piping Sump#1 Piping Sump#2 Pi niz Sump#3 Pi in Sum #4 <br /> Wait time between applying 10 Minutes 10 Minutes 10 Minutes 10 Minutes <br /> pressure and starting test: <br /> Test Start Time: 10:00 10:15 10:25 10:55 <br /> Initial Reading(R,): 3 Psi 3 Psi 3 Psi 3 Psi <br /> Test End Time: 11:00 11:15 11:25 11:55 <br /> Final Reading(RF): 3 Psi 3 Psi 3 Psi 3 Psi <br /> Test Duration: 1 Hour I Hour 1 Hour I Hour <br /> Change in Reading(RF-Rt): 0 Psi 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: Pass Pass Pass Pass <br /> Comments— (include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> Piping Run#4 Diesel Secondary Pipe Test Boot will not maintain proper seal for Test. <br /> Piping Run#4 Diesel Secondary Test Boot replaced to obtain proper seal for Test. <br />
The URL can be used to link to this page
Your browser does not support the video tag.