My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
1201
>
3500 - Local Oversight Program
>
PR0543393
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2018 8:47:03 AM
Creation date
11/5/2018 8:27:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543393
PE
3528
FACILITY_ID
FA0006246
FACILITY_NAME
CITY OF STOCKTON/VICTORY PARK*
STREET_NUMBER
1201
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
APN
13515001
CURRENT_STATUS
02
SITE_LOCATION
1201 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 !'I <br /> City of Stockton 1{' <br /> TL# 394-0192-01 <br /> September 16, 1994 Page 18 <br /> 1 <br /># B-3 Cleanup/Decontamination Proceduresl� At the end of the <br /> workday, the following procedures will be used to allow for the <br /> safe removal and decontamination of personal protective equipment <br /> that may have been required. �{ <br /> Il <br /> • Boots and gloves will be washed withla Alconox® detergent and <br /> i tap water, then rinsed before removal. <br /> i' <br /> • Boot covers and coveralls will be removed and coveralls placed <br /> in a plastic bag for appropriate disposal. <br /> • Gloves will then be removed and placed in the plastic bag; <br /> hands will be washed with soap and water:' <br /> • Spent protective clothing will be stored on-site in 55-gallon <br /> drums and properly disposed of after receipt of laboratory <br /> analyses. �< <br /> r <br /> B-4 Person Res onsible for Health and Sa.fet at Site: Twining's <br /> project geologist will be the designated site safety officer. His <br /> responsibilities will include implementat-ion jof the site safety <br /> work plan for Twining personnel involved with the field operations. <br /> ij <br /> I <br /> I� <br /> it <br /> I <br /> ifY <br /> i II <br /> i <br /> it <br /> I� <br /> i� <br /> ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.