My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
1201
>
3500 - Local Oversight Program
>
PR0543393
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2018 8:47:03 AM
Creation date
11/5/2018 8:27:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543393
PE
3528
FACILITY_ID
FA0006246
FACILITY_NAME
CITY OF STOCKTON/VICTORY PARK*
STREET_NUMBER
1201
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
APN
13515001
CURRENT_STATUS
02
SITE_LOCATION
1201 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L/ yl <br /> City of Stockton TL# 394-0192-01 <br /> September 16, 1994 Page 5 <br /> 4. 1.3 Well Development <br /> Monitoring wells will be developed by bailing, pumping, or another <br /> appropriate technique at least 48 hours after installation. <br /> Development water will be contained in DOT-approved 55-gallon <br /> drums. Development will continue until relatively clear water is <br /> discharged. It is estimated that no more than 55 gallons of <br /> development water will be produced at any one well. <br /> 4 .2 Soil and Groundwater Anal sis <br /> Soil and groundwater samples collected during this investigation <br /> will be submitted to Twining's California certified laboratory in <br /> Fresno, California. Samples will be analyzed for TPH-G and BTEX. <br /> Proposed preparation and analytical methods for the laboratory <br /> analyses are summarized in Table 1. A description of laboratory <br /> quality assurance/quality control procedures proposed for the <br /> analyses are described in the SOPS presented in Appendix A. <br /> TABLE 1 <br /> PREPARATION AND ANALYTICAL METHODS <br /> Type of Analysis Preparation Method Analytical Method <br /> Total Petroleum 5030 GC/FID' <br /> Hydrocarbons - <br /> Gasoline <br /> Benzene, Toluene, 5030 8020 - Soil <br /> Ethylbenzene, Total 602' - water <br /> Xylenes <br /> 5030 - Purge & Trap <br /> GC/FID = Gas Chromatography/Flame Ionization Detection <br /> 1 California State Water Resources Control Board, February 1988, Gas <br /> Chromatography/Flame Ionization Detection, Draft Method for Total <br /> Petroleum Hydrocarbons, Hazardous Material Laboratory, Department of <br /> Health Services, Reproduced from the Leaking Underground Fuel Tank (LUFT) <br /> Field Manual. <br /> 2 United States Environmental Protection Agency, March 1983, Methods for <br /> Chemical Analysis of water and Waste, Second Edition. <br /> 4 .3 Technical Report <br /> Upon completion of field and laboratory activities, a technical <br /> report will be prepared summarizing results and findings. A site <br /> location map, a site plan showing well locations, boring logs, well <br />
The URL can be used to link to this page
Your browser does not support the video tag.