Laserfiche WebLink
Giottonini <br /> Page 2 ' <br /> 1740 Houston Avenue <br /> A revised work pian and permit application will be submitted next week. ' <br /> q <br /> Fire Stations <br /> Work plans dated May 29, 1996 were submitted to PHS/EHD�on July 17, 1996. PHS/EHD stated that <br /> review of the plans was not completed, but that permit applications should be submitted. PHS/EHD <br /> indicated that some of the sites would not require the scope of,investigation which were proposed and <br />! that PHS/EHD would prepare specific comments for each site and include any comments with drilling <br />!� permits. <br /> 134 Sutter ! <br /> ii <br /> PHSIEHD stated that one soil boring, sampled appropriately, should provide sufficient information to <br /> evaluate the residual soil contamination which was observed by,the PHS/EHD inspector on site at the <br /> time of the limited over-excavation. It was discussed that a slant bortn or.probing robin could be done <br /> .,g p g <br /> instead of drilling in the Parking District's office. PHS/EHD further indicated that if a permit <br /> application and revised work plan was submitted the work could be scheduled in conjunction with the <br /> work associated with the COS Fire Stations. '� <br /> i <br /> Ip The next meeting is scheduled for Tuesday, February 4, 1997 at 1:30 p.m. and will be held at the PHS/EHD <br /> office. <br /> Should you have any questions or disagree with this summary, please contact either Margaret Lagorio at (209) <br /> 468-3449 or Mary Meays at (209) 468-0337. <br /> Donna Heran, REHS, Director <br /> Environmental Health Division <br /> P <br /> f Mary Meays, Senior REHS Margaret OA gorio; REHS <br /> Site Mitigation Unit Supervisor, <br /> MMICOS <br /> cc: Elizabeth Thayer, CVRWQCB <br /> cc: Jim Escobar, COS Public Works <br /> cc: Bob Murdoch, COS Public Works �# <br /> I4 <br /> i <br /> 3i <br /> II' P <br /> 1 <br /> 1 <br />