Laserfiche WebLink
Giottonini <br /> Page 2 <br /> Section 4.1.2 of the workplan indicates that there will be no soil'sampling below static groundwater. In <br /> order to calculate the mass balance of contaminants in the soil plume the vertical extent of the soil <br /> contamination should be determined. A below groundwater soil•isampie'will be necessary to determine <br /> the vertical extent of soil contamination. This soil sample shouldbe obtained from SB-2 and should be <br /> s <br /> obtained from a minimum depth of 14 feet. ! <br /> A drilling permit issued by PHS/EHD is required prior to implementation of the workplan. <br /> Fire Stations <br /> Work plans to initiate the investigation of the contamination that was evidenced at the time of tank <br /> removal will be submitted for each of the sites by May 28, 1996: <br /> The next meeting is scheduled for Tuesday, August 6, 1996 at 1:30 p.m.'and will be Reid at the PHS/EHD <br /> f <br /> office. <br /> Should you have any questions or disagree with this summary, please contact eid er Mary Meays at (209) 468- <br /> 0337, Steve Sasson at (209) 468-3459, or Linda Turkatte at (209) 468-344' 1. <br /> ! <br /> Donna Heran, REHS, Director } <br /> Environmental Health Division i <br />! Mary Mlit 'i <br /> ea) Senior REHS Margaret Lagorio, REHS <br />! Site Mitigation Unit Lead Senior ;1 <br /> MMICOS <br /> !k <br /> C' Elizabeth Thayer, CVRWQCB ! <br /> c: Jim Escobar, COS Public Works i <br />` c: Stephen Chen, COS Public Works <br /> f c: Bob Murdoch <br /> �3 _t <br /> I4 <br /> �R <br /> p <br /> iF <br /> E <br /> �f r. <br /> j4 <br /> i` <br /> 'i <br /> �6 <br /> 'i <br /> i <br /> '1 <br />