My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009633
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
1201
>
3500 - Local Oversight Program
>
PR0543393
>
ARCHIVED REPORTS XR0009633
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2018 8:43:35 AM
Creation date
11/5/2018 8:29:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009633
RECORD_ID
PR0543393
PE
3528
FACILITY_ID
FA0006246
FACILITY_NAME
CITY OF STOCKTON/VICTORY PARK*
STREET_NUMBER
1201
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
APN
13515001
CURRENT_STATUS
02
SITE_LOCATION
1201 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Stockton A68104 02B <br /> August 28, 1996 Page 4 <br /> fid .3— <br /> Depth FBSG B T 13 X -rM-G <br /> mg/kg mg/kg mgfkg mg/k$ mg�g <br />' Sod Bonng B-1,Sampling Date June 22, 1995 <br /> 3 ND ND ND ND ND <br /> Sod Boring MW-1,Sampling Date June 22, 1945 <br /> 20 ND ND ND ND ND <br />' 25 ND ND ND ND ND <br /> Sod Boring$-2,Sampling Date June 22,1995 <br /> 10 ND ND ND ND ND <br />' 15 ND ND ND ND ND <br /> 20 ND NrD ND ND ND <br /> Soil Boring B-3,Sampling Date June 22, 1995 <br />' 15 ND ND ND ND ND <br /> 20 ND ND ND ND ND <br /> DLR 0 005 0 005 0 005 0 005 10 <br /> FBSG = feet below site grade <br /> mg/kg = milligrams per kilogram <br />' BTEX benzene,toluene,ethylbenzene,xylenes <br /> TPH-G total petroleum hydrocarbons-gasoline range <br /> ND = Not detected at or above detection limit for reporting purposes <br />' DLR = Detection limits for reporting purposes <br /> Soil cuttings and decontamination rinsate generated during the drilling operations were <br /> stored on site in Department of Transportation(DOT)-approved, sealed, 55-gallon drums <br />' On June 22 1995 monitoring well MW-1 was constructed at the project site to a depth of <br /> approxnnately 40 feet BSG at the approximate location shown on Drawing 4 A monitoring <br />' well construction schematic for monitoring well MW-1 is presented on Drawing 5 <br /> Momtoring well MW-1 was sampled on June 30, and on September 26, 1995. Analytical <br />' results for the groundwater sample analyses are summarized in Table 3 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.