Laserfiche WebLink
City of Stockton A68104 02B <br /> August 28, 1996 Page 4 <br /> fid .3— <br /> Depth FBSG B T 13 X -rM-G <br /> mg/kg mg/kg mgfkg mg/k$ mg�g <br />' Sod Bonng B-1,Sampling Date June 22, 1995 <br /> 3 ND ND ND ND ND <br /> Sod Boring MW-1,Sampling Date June 22, 1945 <br /> 20 ND ND ND ND ND <br />' 25 ND ND ND ND ND <br /> Sod Boring$-2,Sampling Date June 22,1995 <br /> 10 ND ND ND ND ND <br />' 15 ND ND ND ND ND <br /> 20 ND NrD ND ND ND <br /> Soil Boring B-3,Sampling Date June 22, 1995 <br />' 15 ND ND ND ND ND <br /> 20 ND ND ND ND ND <br /> DLR 0 005 0 005 0 005 0 005 10 <br /> FBSG = feet below site grade <br /> mg/kg = milligrams per kilogram <br />' BTEX benzene,toluene,ethylbenzene,xylenes <br /> TPH-G total petroleum hydrocarbons-gasoline range <br /> ND = Not detected at or above detection limit for reporting purposes <br />' DLR = Detection limits for reporting purposes <br /> Soil cuttings and decontamination rinsate generated during the drilling operations were <br /> stored on site in Department of Transportation(DOT)-approved, sealed, 55-gallon drums <br />' On June 22 1995 monitoring well MW-1 was constructed at the project site to a depth of <br /> approxnnately 40 feet BSG at the approximate location shown on Drawing 4 A monitoring <br />' well construction schematic for monitoring well MW-1 is presented on Drawing 5 <br /> Momtoring well MW-1 was sampled on June 30, and on September 26, 1995. Analytical <br />' results for the groundwater sample analyses are summarized in Table 3 <br /> 1 <br />