My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
10
>
2300 - Underground Storage Tank Program
>
PR0504834
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2021 11:42:29 AM
Creation date
11/5/2018 8:52:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0504834
PE
2381
FACILITY_ID
FA0006359
FACILITY_NAME
TRACY, CITY OF
STREET_NUMBER
10
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
10 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\10\PR0504834\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
5/6/2013 8:00:00 AM
QuestysRecordID
154809
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESNA Industrics Inc. <br /> Quality Assunnce/Qwlity Control Plan <br /> Revised November 1992 <br /> ✓ inclusive dates and times of possession <br /> ✓ requested analysis for each sample <br /> 5.3 Delivery of Samples to Laboratory <br /> Samples will be delivered to the laboratory on a daily basis. Samples will be refrigerated <br /> to approximately 4°C for shipping. Shipping containers will be sealed with security tape <br /> to assure sample integrity during shipping. Delivered samples will be accompanied by <br /> a chain-of-custody record. The laboratory shall note on the chain-of-custody that samples <br /> were properly preserved and security tape was intact upon arrival. <br /> 6.0 SAMPLING ANT DRILLING EQUIPMENT DECONTAMINATION <br /> All equipment used for drilling and sampling will be decontaminated prior to use. All equipment <br /> used for collection of more than one sample, such as bailers and spoons, will be decontaminated <br /> between each use to prevent cross contamination between samples. Drilling equipment will be <br /> decontaminated prior to commencing drilling at each hole. Well construction materials will be <br /> cleaned as necessary, prior to installation. <br /> Equipment and well material decontamination will be conducted on an impermeable surface and <br /> all decontamination effluent will be contained. All surfaces of the equipment will be thoroughly <br /> decontaminated using a steam cleaner. The equipment will be placed on a drying rack for air <br /> drying. The decontamination water will be stored in containers certified for hazardous materials <br /> storage and disposed of in an approved manner. <br /> Sample equipment to be used for pesticides and organic analysis will be washed in a <br /> nonphosphate detergent (Alconox or equivalent) and rinsed with tap water, followed by deionized <br /> water and finally with acetone. If the equipment is for metals analysis, the initial rinse will be <br /> conducted with 0.1 N nitric acid followed by tap water and deionized water. <br /> QAQ=109..FNL 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.