My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
10
>
2300 - Underground Storage Tank Program
>
PR0504834
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2021 11:42:29 AM
Creation date
11/5/2018 8:52:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0504834
PE
2381
FACILITY_ID
FA0006359
FACILITY_NAME
TRACY, CITY OF
STREET_NUMBER
10
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
10 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\10\PR0504834\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
5/6/2013 8:00:00 AM
QuestysRecordID
154809
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESNA Industnes Inc. <br /> Quality Assurance/Quatity Control Plan <br /> Revised November 199: <br /> Combustible Gas/Oxveen <br /> Combustible gas/oxygen meter. Calibration: factory calibrated, field calibrated monthly, <br /> zeroed daily according to manufacturers instructions. <br /> Miscellaneous Measuring Devices <br /> Calibration procedures for any other measuring device used will be documented at the <br /> request of the regulatory authority. <br /> All equipment will be checked daily and replaced as necessary. Instrument manuals and an <br /> instrument log book will accompany equipment into the field. Any calibration, repairs or related <br /> information will be recorded in the log book. <br /> 8.0 LABORATORY QA/QC PLAN <br /> Soil and groundwater samples will be submitted to a State Certified Hazardous Waste Laboratory <br /> for chemical analysis of hazardous constituents. Established QA/QC procedures for analytical <br /> operations will include sample custody procedures, standards of analytical accuracy, analysis of <br /> matrix spikes and method blanks, data reduction, verification of raw analytical data, and <br /> maintenance of control charts to monitor analytical performance. These QA/QC procedures are <br /> outlined in the laboratory QA/QC Plan which is available upon request. Organic chemical <br /> analyses will be performed in conformance with standard procedures established by the United <br /> States Environmental Protection Agency (EPA) in 'Guidelines Establishing Test Procedures for <br /> the Analvsis of Pollutants Under the Clean Water Act" (40 CFR, Part 136, October 1984). The <br /> laboratory is periodically evaluated through external performance audits conducted by EPA and <br /> DHS using QC labs. The specific analytical methods to be utilized for purgeable and <br /> semivolatile hydrocarbons analyses are shown on Table 2. <br /> Qn QCIM.FNL 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.