My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
10
>
2300 - Underground Storage Tank Program
>
PR0504834
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2021 11:42:29 AM
Creation date
11/5/2018 8:52:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0504834
PE
2381
FACILITY_ID
FA0006359
FACILITY_NAME
TRACY, CITY OF
STREET_NUMBER
10
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
10 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\10\PR0504834\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
5/6/2013 8:00:00 AM
QuestysRecordID
154809
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESNA Industncs Inc. <br /> Quality Assurance/Quality Control Plan <br /> R"ised No�cmbcr 1992 <br /> 11.3 Sampling from Soil Piles or Shallow Soil Pits <br /> Soil samples will be collected and transported from excavated material in the manner <br /> described in the previous section, however, a backhoe will not be utilized. If composite <br /> samples are collected, four brass cylinders will be collected for every 50 cubic yards of <br /> material to be sampled unless otherwise specified by the lead regulatory agency. The <br /> samples will be composited by the state certified laboratory personnel prior to testing. <br /> 12.0 GROUNDWATER SAMPLING PROTOCOL <br /> Prior to arriving at the sampling site, all sampling equipment will be washed with laboratory <br /> grade detergent, and rinsed twice with tap water, once with acetone, and once with deionized <br /> water. this procedure will be carried out on-site before sampling of other monitoring wells, if <br /> more than one well is to be sampled with the sample sampling device. <br /> Immediately prior to sampling, the depth to water (DTW) in the well will be recorded. The <br /> thickness of product on top of the groundwater, if present, will be measured using an interface <br /> probe. The procedure for monitoring is presented in Section 9.0 (Groundwater Monitoring <br /> Protocol). <br /> If free product is detected, analysis of groundwater at the interface for dissolved product will <br /> not be conducted. A product sample will be collected for source identification. If all free <br /> product cannot be removed, an interval specific sampling device may be utilized to collect a <br /> sample from below the zone of free product. Before collecting groundwater samples from each <br /> well, the well will be purged until indicator parameters (temperature, conductivity, and pH) <br /> stabilize. This will entail the removal of at least four well casing volumes by bailing or <br /> pumping. The criteria for determining well casing volumes and temporary storage of purged <br /> water is outlined in Section 10.0 (Well Development Protocol). The indicator parameter <br /> QAQCI097.FTL 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.