Laserfiche WebLink
ji <br /> 1 2 J 3 4 5 6 7 <br /> FULL SYSTEMS PRECISION TA <br /> COLOR CODED PRODUCT COLLAR I. MC AND LINE TESTMG <br /> PAVEMENT PER 617E PLAN TO BE ARRANGED BY CONTRACTOR(NOTIFY <br /> 4' TOP DEAL ADAPTOR I I SLOPE CONCRETE DOWN 11/2' CONTRACTOR'S REPRESENTATIVE 2 WEEKS IN <br /> AND CAP , , FROM MANHOLES,TYP ADVANCE). <br /> -_ LIQUID SENSING PROBE P > > e <br /> § 2' VENT LINE W/ 3" -- - 4"NIPPLE I 2. DISPENSER SUMP 4 TURBINE °5,41 D ARE TO BE c �o <br /> SECONDARY PIPING WATER TESTED AS FOLLOWS: V U <br /> TTO <br /> FOR DEPTH SEE e2 PEA GRAVEL A. FILL WATER TO RIM. <br /> PENETRATION BOOT rVOR <br /> \ 2x PIPE 0 TYPAR—► t3 ������' INC* <br /> 3" SECONDARY CONTAINMENT NIR-S� �. / 8. SPRAY PAINT 70P OF WATER <br /> ° PEAGRAVEL6. r 3. THE CONTRACTOR SHALL REAPPLY VACUUM TO ENwRONMENTu DESIGN <br /> 2" F'RODUGt LINE MRK MM. _ _ - THE TANK ANNULAR SPACE PER MANUFACTURER'S PLANNING <br /> 6. <br /> SPECIFICATIONS AFTER RISER$HAVE BEEN INSTALLED.CONNECTOR \ z I III VACUUM 16 TO BE MAINTAINED AT ALL TIMES r <br /> A I I (OMIT ON DIESEL TANK) i�� ;6? 4° SCHEDULE 40 STEEL <br /> POSSIBLE. <br /> EXTRACTOR ASSEMBLY �_--MIN 6' PEAGRQVEL BED-�� j I III RISER A <br /> 3" FIBERGLASS VAPOR RECOVERY FOR VAPOR RETURN %/.�/// " I 4' ALUMINUM FILL TUBE 4. PIPING: AFTER PRESSURE TESTS ARE COMPLETED C <br /> LINE W/ 4" SECONDARY PIPING (OM IT ON DIESEL TANK) ON ALL THE LINES,PRESSURE MAY BE REDUCED <br /> SLOPE TO LOWEST GRADE TANK TO A MINIMUM OF 20 PDI AND MUST BE MAINTAINED <br /> (OMIT ON DIESEL TANK), REFER TO SUB PUMPSLOPESLOPE TRENCH BOTTOM EVENLY FROM DISPENSERS BACK TO TANK SUMPS ATA UNTIL ALL CONCRETE/ASPHALT SURFACES HAVE 950 FULTON AVENUE, SUITE 200 <br /> PIPING PLAN FOR ACTUAL MINIMUM SLOPE OF I/S In./Ft. I I BEEN COMPLETED- SACRAMENTO, CA. 95825-4503 <br /> CONFIGURATION 4 SIZE. 2. TRENCH BOTTOM MUST BE FREE OF HARD OR SHARP OBJECTS. - — — — — — — — - T�FITTING TELE (916) 979-7205 <br /> 5. TANKS SHALL BE INSTALLED PER THE MANUFACTURES FAX (916) 979-7210 <br /> NOTE: 3. GRADE TRENCH BOTTOM WITH AT LEAST &" OF SELECT BACKFILL TO PROVIDE , , SPECIFICATIONS <br /> FIRM, EVEN SUPPORT FOR THE PIPE. COMPACT THE SUMGRADE TO PREVENT <br /> * PIPES MUST EXIT PERPENDICULAR TO SUMP WALL DIFFERENTIAL SETTLING I OVERFILL PREVENTION VALVE 1S. ALL PIPING,COUPLINGS,SEALANTS,OR RELATED PIPNG <br /> 4. PROTECT THE PIPE FROM IMPACT AND ABRASION DURING BACKFILLING i I I SEAT AT 90% $HUT-OFF SHALL CT COMPATIBLE WITH EACH OTHER AND THE <br /> * NEVER COVER UNUSED BUNlGB W/ PIPE OR CONDUIT I I PRODUCT THAT THEY SHALL CONVEY <br /> Al SUMP PLAIN (GASOLINE OR DIESEL TANK) A3 TYPICAL PIPING TRENCH DETAIL A5 VAPOR e i:ILL DETAIL GENERAL NOTES <br /> TANK_SUMRdw 51303 110216 $GALE=�/y"=1'•0' PIPINIG_TRENCH,dw 4-22-03 4:4L43 pM PST NQ$GALE OPV_VENT.drg 51903 32456 SCALE, VjSI'-0' �� TGWT.tla 21902 13058 <br /> 36' DIA. <br /> MANHOLE <br /> r �- <br /> (3)-w4 BARS <br /> 6' LCNG,TYP RANDALL L. MOORE, ARCHITECT, along <br /> � <br /> with SUTTON & ASSOC., INC., jointly <br /> J. 4,TYP hereby expressly preserve their com- <br /> mon law copyright and other property <br /> B <br /> B ore not to be reproduced, copied or <br /> , I rights l <br /> changed these <br /> aany plans, plans <br /> form whatsoever,pp nor <br /> �y <br /> 61,Tyr are they to be assigned to a third <br /> party, <br /> t first btf the ex— <br /> presswritten consentoRANDALL L. <br /> MOORE and/or SUTTON & ASSOC., INC. <br /> i 'RUCK •. <br /> RER Ai DUB PUMP, NEE Bl - OMIT ON DIESEL) EGOYERT /--; � t SPIE_ ::ONTANMENi <br /> 2 MANHOLE <br /> / 1 <br /> f <br /> iLJPE :.ONI:RETE OUW.N ; <br /> FROM MANHOLES,TYP RANDALL L. MOORE, ARCHITECT <br /> -- 36" DIA MANHOLE W BARS <br /> DIAGONAL C 08723 <br /> I6' LONG, TYP @' DIA MANHOLE La <br /> FOR PRI IANC HOLE: 8' CONCRETE C' LIQUID SENSING FRO'3E <br /> TAW SLAB WITH 44 REBAR AT <br /> 27 EACH WAY SUB PUMP I I FILL GAP AND ADAPTERcil <br /> SUB PUMP RE®AR DETAIL .Q Z <br /> CONCRETE SHALL EMEND A G EXTRACTOR A66EMBLI «JK I awAmn4•a amt mxa SCALE-1/2"al'-0' <br /> MINIMUM OF 2'-0' BEYOND THE <br /> VAPOR RETURN AND 4' PIPE <br /> 11, aT <br /> ENDS AND SIDES OF THE TANGS CAP(OMIT ON DIESEL TANK) ASPHALT OR 6" _ z <br /> (SEE SITE PLAN FOR ACTUAL .-+r'Jr2 -1r' a,\u aJ�N'Nil +� 0 Z .+dE� r�- <br /> TANK SLAB SIZES) <br /> ' REBAR AT M.a\nthco � CONCRETE DRIVE BLAB <br /> -_... SEE = J .-i `I,w\nJ4c I ( W/ #3 REBAR a 24" O.C. � � � Q V X 3 <br /> B� 0 41x\u�aK i1`1 a1F <br /> ra MONITOR, SEE EA WAY w Q 10 <br /> 2' MIN. II'-0' T2 I ,„ � Z LL = _ <br /> z <br /> _ � .�{{•��, w w <br /> FIBEWYLA$$ PUMP I — --- - - - -i <br /> CONTAINMENT SUMP 4'b BLACK IRON RISERS TYP. W/ lY-9LYIL 'q <br /> AND LID,DEE zI I I _ 1 -I, ( V <br /> NIPPLES AND ADAPTOR AS REO'p I — <br /> C z _I <br /> 2'xI2 FLEX <br /> ® III I C .L H <br /> CONNECTOR VENT LINE I O <br /> v I I <br /> SEE DETAIL 72 .n <br /> i I ill <br /> 1 <br /> REVISION BY <br /> - <br /> TEST BOOT I I 3'x24'FLEX CONNECTOR III OVERFILL PREVENTION I I I' MIN <br /> l I VALVE <br /> LIQUID 6EN544i PROBE, <br /> TAMC LEVEL MONITOR <br /> 3' VAPOR RETURN PIPMCs , <br /> I I (OMIT ON DIESEU II DROP TUBE <br /> II p I II <br /> PEA GRAVEL BACKFILL <br /> EXISTING FUEL TANKS 'I ( III DATE: MAT I, 2003 <br /> REGULAR / PREMIUM UNLEADECI I I DRAWN 6Y: 53M <br /> I I 12,000 GAL. TANK, TYPICAL OF THREE (3) Ii I III o6 No-- - 0317 <br /> I I I I ;I <br /> uI-II III <br /> I I I N I I TANK STRIKER .EI I I I - <br /> DER ALL TANJKS TIP III i SHEET <br /> ILL <br /> (AN <br /> I ur II I <br /> T2 <br /> 9 LIQUID SENSING PROBE <br /> OF SHEETS <br /> � - <br /> � - III i ! L- ! ' <br /> - '�I � � �- I I I II I II I II I I I �� TANK ELEV�4tIt�N <br /> pi EXISTING TANK ELEVATION AND SECTION (AUTOGA50LINE) _ 4 TANK <br /> LEVATI N <br /> TAW_SEVEa 5-19-03 3VO m PSI $GALE=10'=I'-0' <br /> 1 2 3 4i 5 6 - 7 sut24x36,dwg 92500 21556 <br /> 117T2.dwg 51903 32837 <br />