Laserfiche WebLink
720 Project Record Document <br /> 530 Barriers and Enclosures d. Remove utilities scheduled for abandonment. Burled utilities <br /> A. Safety Barricades A. Prior to filing of the Notice of completion and before the Issuance more than 3 feet from final plan grade to top of utility <br /> 1. Barricades, lights, and similar safety precautions that may be of a final certificate for payment In accordance with the provisions of pipe or conduit may be sealed with concrete at each end and <br /> required by institution or local authorities shall be Provided the General Conditions. file the following papers with the Owner through left in place where the utility does not Interfere with new <br /> and maintained by the Contractor until no longer required. the Architect: <br /> construction.- <br /> B. Tree and Plant Protection 1. Guarantee: The guarantee required by the General Conditions and any e. Remove all other utilities designated for abandonment. <br /> 1. All plant life on the site. except In the areas to be excavated, and other extended guarantees stated In the technical sections of the f. Obtain and maintain all necessary temporary utility services <br /> on adjacent Propoerty, shall be protected from all Injury, specification, required for construction at no cost to the Owner . <br /> C. Protection of Work and Property 2. Release or Waiver of Liens: As requ red by the General Conditions, g. Contractor is required to take precautionary measures to protect <br /> 1. The Contractor shall be held responsible, so far as his operations 3. Certificate of Encroachment, utility lines shown on these contract documents and any other <br /> are concerned, for the care and preservation of the adjacent 4. Project Record Documents (As-Bullis) : lines not of record or not Shown on these documents, that are <br /> premises, trees, landscaping, utilities, walks, streets, and a. As the work progresses keep a complete and accurate record of encountered during construction. j <br /> co-terminous property, Any Darts of them Injured, damaged or - changes or deviations from the pumps, tanks, electrical , piping, 5. The Contractor shall provide all bracing and shoring as required to , <br /> disturbed because of his work shall be repaired, replaced or cleaned etc. drawings, Indicating the work as actually installed, Changes protect existing adjacent structures from settlement. This shall <br /> at Contractor' s expense, shall be neatly and correctly shown on the respective portion of be maintained until excavations are backfilled. Comply with all <br /> 2. Any and all existing curbing, utility poles, underground utility the affected document, using reproducible Prints of the Drawings codes and regulations, <br /> 6. Adjacent improvements: Notify owners of all adjacent improvements <br /> lines, etc. , damaged by the Contractor In the execution of this affected, with appropriate supplementary notes. This record set <br /> contract shall be restored to former condition by the Contractor of Drawings shall be kept at the Job site for inspection by the Prior to excavation, filling or other work which may affect adjacent <br /> to the satisfaction of the Architect at no change in the contract Architect and the Owner , construction. Repair all damage to adjacent Improvements caused by <br /> price. construction activities. <br /> b. The records above shall be arranged in order, in accordance with 7. Public Improvements: Provide temporary curb ramp, barricades, signs, <br /> 540 Security the various sections of the specifications and properly indexed, or other devices required to protect public improvements and secure <br /> A. Protection of Work and Property At the completion of the work, certify by endorsement thereof <br /> at no cost to the Owner any permits or variances required to perform <br /> 1. Damage to Previously existing or newly placed facilities cadsed by that each of the revised Prints of the Drawings is complete and the work. Repair damage to Public improvements caused by construct- <br /> accurate. Prior to application for final payment, and as a <br /> movement of equipment or other operations, whether accidental or ion activities as required by the public Jurisdication at no cost <br /> made necessary by reason of Contract requirements, shall be restored condition to Its approval by the Architect and the Owner, to the Owner, <br /> deliver the record Drawings, arranged in proper order, Indexed. <br /> or replaced as specified or directed by Architect. 8. Ownership of Salvaged Materials: All existing Improvements <br /> and endorsed as here before specified. Provide suitable transfer designated for removal are the property of the Owner, unless other- <br /> 2. Restoration shall be equal to the structural qualities or perform- <br /> ante capacities of the original work, and finishes shall match the cases and deliver the records therein, indexed and marked for wise determined by the Owner. Remove all salvaged material not <br /> appearance of, as nearly as possible. like existing adjacent work. each division of the work. claimed by the Owner from the site. <br /> Restorations shall be subject to approval by Architect and shall be c. No review or receipt of such records by the Architect or the B. Available Site Information <br /> made as necessary at no added expense to Owner unless otherwise Owner shall be a waiver of any deviation from the Contract 1. The Information listed below, whether shown on the drawings or <br /> particularly Provided for under these Documents. Documents or the shop drawings or in any way relieve the otherwise. made available to the Contractor, 15 furnished for <br /> 3. Work not properly restored or where not capable of being restored Contractor from his responsibility to Perform the work in information only and is not part of the Contract. The Owner assumes <br /> as Intended under these Specifications shall be removed and replaced accordance with the Contract Documents. no responsibility for the accuracy or completeness of this Informa- <br /> as directed by Archit;ct, at no added expense to Owner. tion. <br /> 2. Where site soils reports have been prepared, copies are available <br /> for inspection by the Contractor at the office of the preparer of <br /> 5. Notice of Completion: After completion of the project and subject the report. The Contractor 1s encouraged to verify site conditions <br /> to the Owner's approval , Contractor shall initiate Owner's "Legal and may drill test borings on the site where possible by arrangement <br /> 560 Temporary Controls Notice of Completion', cause it to be published In a local news- with the Owner. <br /> A. Dust Control Paper and to be recorded at the County Clerk's office and Day the C. Layout of Work <br /> 1 . The Contractor shall take appropriate steps, such as watering, to fees for same. <br /> I . Employ a licensed surveyor or a civil engineer registered in the <br /> prevent airborne dust. No oil or chemical palliatives shall be used State of California to locate and stake site improvements. <br /> without permission of the Owner, B. Prior to filing of the Notice of Completion and before the issuance of <br /> B. Noise Control the final certificate for payment, in accordance with the provisions of 2. Notify the Owner promptly of any conflicts between new and existing <br /> 1. Noise from job equipment shall be kept to a minimum by adequate the General Conditions, file the following with the Owner through the improvements and do not proceed until directed by the Owner. Q <br /> mufflers and other means as approved by the Architect. Architect: FO O V��}} CJS LIQUOR 37 <br /> 3. Maintain survey monuments and stakes and replace any damaged or I <br /> 1. Operation and Maintenance Manuals . destroyed stakes at no cost to the Owner, --T--- - -- T-^- -~ <br /> 01650 STARTING OF SYSTEMS/COMMISSIONING <br /> a. Furnish three (3) complete sets of manuals containing the 4. Report all deviations from plan locations and elevation promptly 15 West G ra ntlin e <br /> manufacturers' instructions for maintenance and operation of to the Owner. <br /> each item of equipment and apparatus furnished under the Contract D. Environmental Controls Tracy, Ca <br /> 660 Testing, Adjusting and Balancing of Systems <br /> A. Notification for Tests and Inspections and any additional data specifically required under the various I . Noise Control : Use equipment and construction methods which will 1. Notify Architect or Inspecting authority not less than 48 hours in sections of the Specifications, not exceed the existing decibel level in the neighborhood. Consult <br /> advance of any required test or Inspection. Verify satisfactory <br /> b. Arrange the manuals in proper order, indexed and suitably bound. with the Owner so as to schedule all activities creating unusual <br /> Certify by endorsement thereon that each Of The manuals is <br /> results of tests and inspections before allowing subsequent work complete and accurate. Assemble these manuals for all divisions noises at times which are mutually agreeable. <br /> to proceed. The Customer Co <br /> 2, Dust Control : Water the site and exercise other dust control <br /> of the work, review them for completeness, and submit them to measures as necessary to eliminate dust resulting from construction PO. Box 886 Benicia , Ca <br /> B. Preliminary Operation the Architect. Provide suitable transfer cases and deliver <br /> 1 . Should the Owner request that any equipment be operated before final activity. <br /> the Manuals therein, indexed and marked for each division of the <br /> completion and acceptance of the work it shall be done without being work. 3. Water Borne Solids Control : Provide siltation ponds, sumps or <br /> construed as a separate acceptance of the equipment apart from the other facilities as required to prevent water-borne solids from <br /> contract as a whole. entering the Owner' s adjacent improved areas, public streets or <br /> Public storm drains. <br /> DIVISION 2 SI lT1�.+MYoI <br /> p,A, r k 4. Water Control : Construct temporary ditches, storm drains or SHEET TITLE <br /> 01700 CONTRACT CLOSEOUT utilize permanent on -site drains to keep the site and adjacent <br /> Public and Private areas free from excess water at all times. Keep SPECIFICATIONS <br /> 710 Final Cleaning 02005 GENERAL REQUIREMENTS excavated areas dry Iby pumping excess water in a manner approved <br /> A. Site Clean-up - A. Existing Conditions by the Architect and Public agencies having jurisdiction. <br /> 1, Upon acceptance of the work, the entire site area shall be thoroughly f` <br /> 1 . General : Verify existing site conditions. Site shall be accepted 5. Lim _ation of Off-Site Hauling: <br /> cleaned free from broken paving and concrete, rubbish, wood, rocks. <br /> by the Contractor as is. a. General : The earthwork shown on the drawings may require that REVISIONS DATE <br /> construction fencing and offices and any other loose materials, 2. Offs-Site Access: Verify all limitations Imposed by public jurls- excess excavation be hauled from the site and/or fill material <br /> 2. Pavement or concrete outside the limits of work broken or damaged dictions of off-site construction routes. - be imported to the site. In order to minimize traffic dis- <br /> by the work shall be replaced or repaired in a satisfactory 3. On-Site Access : Use on-site access routes designated by the Owner. ruption, noise, and spillage of debris, use the methods <br /> condition. Maintain this access route during construction and at completion of described below ''to limit the amount of material moved to and <br /> construction restore access route to original condition at no cost from the site. <br /> to owner. b. _SLheduling Work: Schedule the work to utilize approved site <br /> 4. Utilities: <br /> excavation for f:ill material wherever possible. Date Drawn By <br /> a, Verify location and elevation of all existing surface and buried C . Stockpiling: Where Physically Possible and economically <br /> ' utility services on-site and adjacent to the site before start- <br /> desirable, temporarily stockpile approved excess excavation lob No. Checked By <br /> Ing construction. Report promptly to the Owner all discrep- on the site for dater use as trench and structural backfill . <br /> ancies between field conditions and recorded Information. See Section 02200, Earthwork, for requirements. SHEET <br /> b. Reroute all existing active services Prior to removing Portions <br /> scheduled for abandonment to maintain existing utility services D <br /> designated for preservation at all times. PRINTEDc. ', Notify each utility service company Prior to removing utility, _ Q <br /> land proceed in accordance with utility company. SEP 16 1997 <br /> OF SHEETS <br />