My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2003 PLAN
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2360
>
2300 - Underground Storage Tank Program
>
PR0507204
>
INSTALL_2003 PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 1:07:20 PM
Creation date
11/5/2018 8:56:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2003 PLAN
RECORD_ID
PR0507204
PE
2361
FACILITY_ID
FA0007735
FACILITY_NAME
7-ELEVEN INC #32262
STREET_NUMBER
2360
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23819001
CURRENT_STATUS
01
SITE_LOCATION
2360 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\2360\PR0507204\INSTALL PLAN 2003.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12" DIA. x 2'-0" CONC <br />BURIED BASE (TYP.) <br />2" U -BOL <br />(TYP.) - <br />2" DIA. - 90'_ <br />GALVANIZED ELL <br />2" GALVANIZED SCH 40 VENT <br />RISER AT 12' ABOVE GRADE <br />(P/V VENT PER LOCAL CODE) <br />2" DIA. x 8'-0" GALVANIZED <br />SCH 40 SUPPORTS <br />7'-0" ABOVE GRADE (TYP.) <br />1/8" x 4" x 18" <br />UNI -STRUTS <br />AT 3' AND 5' <br />ABOVE GRADE <br />- � 2" ERR GAS01_INE VENT <br />SLOPE VENTS DOWN 1/8 " PER FT. <br />TO TANKS (TYP. ALL LINES <br />2" DIA, MALE ADAPTER <br />VENT RISER DETAIL <br />NOT TO SCALE <br />2" GALV. STEEL VENT <br />- 2" <br />ELL <br />SIPHON TO BE <br />2" <br />PIPE & SUPPORT <br />TANKS AT LOCATIONS <br />4" x 2" DOUBLE <br />& <br />90' ELBOW <br />REGULAR) <br />TO BE PAINTED <br />"SOFT WHITE' <br />TITEFLEX PART <br />NO. <br />STEEL <br />PLATE <br />o <br />VENT RISERS <br />1 2. <br />2" FIBERGLASS <br />ENVIRON ISOLATION TUBE W/DONUT <br />ENVIRON PART <br />NO. <br />PIPE W/3" SECONDARY CONTAINMENT PIPE <br />7-11 <br />2" <br />2" GALV. 90 <br />DPW PART NO. <br />523V-2253 <br />, <br />Iz <br />N <br />O <br />GEODUCT FLEXIBLE CONDUIT <br />WITH <br />ALCOHOL BLEND FUELS. <br />SLAVE <br />7-11 <br />2" x 3/8" BUSHING FOR COPPER LINE <br />GEOFLEX-D SUPPLY PIPING <br />ENVIRON PART <br />NO. <br />e <br />n <br />TANK END <br />CLAMPS <br />2" NIPPLE <br />MiN 0 <br />i/8 T. <br />OR <br />AMERON <br />ELECTRICAL CONDUIT <br />(TYP.) <br />SEE NOTE <br />2" FIBERGLASS PIPE <br />�+ PRODUCT LINE <br />STEEL PIPE <br />tO WRAP EXPOSED VENT RISER <br />12" BELOW CONCRETE WITH <br />3M CATHODIC PROTECTION <br />7tNAPE <br />NOTE: <br />PRIOR TO PAINFING, <br />2 ALL GALVANIZED METAL <br />MUST BE PREPPED <br />FREE-STANDING VENT DETAIL <br />NOT DSCALE <br />NOTES <br />NOTE: <br />ALL DISPENSERS ARE TO BE POSITIONED WITH UNLEADED <br />ON THE LEFT OF THE "A" SIDE OF THE DISPENSER FACE. <br />SIDE "A" OF DISPENSERS ARE TO ALWAYS FACE CLOSEST <br />TO STORE FRONT. IF THE DISPENSERS ARE PERPENDICULAR <br />TO THE STOREFRONT, THE "A" SIDE WILL BE POSITIONED <br />TO THE RIGHT, LOOKING TOWARDS THE STORE. <br />6 MPD'S 1-10,000 & 1-15,000 GAL. (1) 2 H.P. STP 6 <br />FILL STAGE II "Y" FROM TANK TO FIRST BLENDER DISPENSER WITH 1 1/2" <br />VAPOR RECOVERY PRIMARY PRODUCT LINE, AND USE 1 1/2" PRIMARY PRODUCT UMP <br />TANK LINE TO THE REST OF THE BLENDER DISPENSERS. <br />NTERSTIC 1 2 <br />NOTE: FOR HIGH VOLUME LOCATIONS USE 2-15,000 GALLON TANKS 2 r.0 <br />OR AS AN ALTERNATIVE, USE 3- 15,000 GALLON TANKS. <br />FG <br />TANK MONITOR 1�ry <br />2."F 3,.F 1 �P <br />�'11N. SCOP MIN. g G SUB -PUMP <br />�/8 SFT F q COpE <br />1 1/2„ FG <br />i <br />UNLEADED 11ry 1 11 <br />`l. <br />SANK , Z •'P ,gam i <br />FLEX CONNECTOR Y <br />' 1/2" (TYP.) ti Z., FG <br />1 2 PREMIUM <br />TANK <br />8 TAfyks <br />NOTE: T� <br />OPPOSITE REVERSE SIDESIF OF ISLANDSLOCATED <br />ON TOWARD F�BE �CSCOpf <br />1. VENT RISER TO EXTEND A MINIMUM OF 12' ABOVE GRADE WHEN <br />LOCATED IN REMOTE AREA. <br />2. ALL STEEL PIPE & CLAMPS ABOVE GRADE PAINTED "SOFT WHITE". PIPING SCHEMATIC (SIX ISLAND 'MPD'S) <br />PAINT FURNISHED BY 7 -ELEVEN TO THE CONTRACTOR. <br />NOTE: SEE SITE PLAN FOR PUMP AND VENT LOCATIONS <br />6" THICK CONCRETE <br />PAVING W/ #3'S ® 18" O.C. <br />BOTH WAYS. APPLY CONCRETE <br />SEALANT PER SPECS,-, <br />VAPOR RECOVERY <br />LINE <br />FIBERGLASS PIPIN <br />SECONDARY <br />PIPING <br />SPECIFIED FILL <br />ELECTRICAL <br />CONDUITS <br />z_ <br />N <br />U1 <br />W <br />PRODUCT PIPING — <br />\ iO <br />PRIMARY <br />PRODUCT LINE <br />6"-3/8" <br />PEAGRAVEL BEDDING <br />SECTION THRU PIPING TRENCH <br />NOT TO SCALE <br />NOTE: IF CONDUIT OR WATER NEEDS TO CROSS TRENCH IT <br />SHOULD DO SO PERPENDICULAR TO PRODUCT PIPE. <br />OSE S0A STORP Sroe <br />S� <br />F <br />I <br />d� <br />NOTES: <br />1. ALL FITTINGS TO BE CONTAINED INSIDE RISER. <br />2. SLOPE TO TURBINE SIDE. <br />3. ENVIRON FLEXIBLE ENTRY BOOTS (PART NO. FEB -6300) AT SIPHON PENETRATIONS, <br />WITH 3 X 2 RUBBER REDUCER B00T (ENVIRON N0. RRB-3030) ON SIPHON SIDE <br />& A 3 X 2 RUBBER TEST REDUCER (ENVIRON NO. RTR-3020) ON THE STP SIDE, <br />SIPHON DETAIL <br />NOT TO SCALE <br />NOTE: <br />- 2" <br />ELL <br />SIPHON TO BE <br />2" <br />UNION THEN NIPPLE <br />TANKS AT LOCATIONS <br />4" x 2" DOUBLE <br />& <br />90' ELBOW <br />REGULAR) <br />TAP BUSHING <br />TITEFLEX PART <br />NO. <br />110165-242-0180 <br />7-11 <br />2" FIBERGLASS <br />ENVIRON ISOLATION TUBE W/DONUT <br />ENVIRON PART <br />NO. <br />PIPE W/3" SECONDARY CONTAINMENT PIPE <br />7-11 <br />2" <br />ENVIRON BALL VALVE #BSV-2020 <br />DPW PART NO. <br />523V-2253 <br />OR <br />EQUAL. MUST BE RATED FOR USE <br />O <br />GEODUCT FLEXIBLE CONDUIT <br />WITH <br />ALCOHOL BLEND FUELS. <br />SLAVE <br />7-11 <br />2" x 3/8" BUSHING FOR COPPER LINE <br />GEOFLEX-D SUPPLY PIPING <br />ENVIRON PART <br />NO. <br />GFP-2150 <br />TANK END <br />v <br />2" NIPPLE <br />RED THREAD II <br />OR <br />AMERON <br />ELECTRICAL CONDUIT <br />2" THREADED <br />SEE NOTE <br />2" FIBERGLASS PIPE <br />�+ PRODUCT LINE <br />STEEL PIPE <br />LI #3 BELOW <br />G.C. <br />/ \ <br />3/8 " COPPER TO <br />12" MANHOLE ASSEMBLY <br />DPW PART NO. <br />2" UNION THEN NIPPLE <br />FUNCTIONAL ELEMENT <br />OF <br />O8 <br />& 90' ELBOW <br />SUBMERSIBLE <br />NO, <br />VEF-4432 <br />2"x2"x2" TEE <br />2" NIPPLE <br />GEOTECH MATERIAL <br />SEE SPEC. SECT. III <br />4" x <br />2" DOUBLE <br />TAP <br />BUSHING <br />II <br />II I I <br />SUB PUMP END <br />II I I <br />2" THREADED <br />STEEL PIPE <br />d� <br />NOTES: <br />1. ALL FITTINGS TO BE CONTAINED INSIDE RISER. <br />2. SLOPE TO TURBINE SIDE. <br />3. ENVIRON FLEXIBLE ENTRY BOOTS (PART NO. FEB -6300) AT SIPHON PENETRATIONS, <br />WITH 3 X 2 RUBBER REDUCER B00T (ENVIRON N0. RRB-3030) ON SIPHON SIDE <br />& A 3 X 2 RUBBER TEST REDUCER (ENVIRON NO. RTR-3020) ON THE STP SIDE, <br />SIPHON DETAIL <br />NOT TO SCALE <br />NOTE: <br />EQUIPMENT <br />SCHEDULE <br />SIPHON TO BE <br />USED FOR MANIFOLDING OF TWO <br />REGULAR 10,000 GALLON <br />TANKS AT LOCATIONS <br />WHERE THREE <br />10,000 GALLON TANKS ARE USED <br />(1-10,000 PREMIUM & 2-10,000 <br />REGULAR) <br />NOTE: <br />ALL SUMPS TO BE WATER TESTED <br />NOTE: FOR VAPOR VAC INSTALLATION, <br />STAGE II VAPOR RECOVERY LINE <br />SHALL BE 2" FIBERGLASS PIPE WHEN <br />THERE ARE TWO DISPENSERS OR LESS, <br />AND 3" FIBERGLASS PIPE WHEN THERE <br />ARE THREE DISPENSERS OR MORE. <br />GENERAL NOTES <br />1. PIPING TO BE TESTED UNDER PRESSURE DURING BACKFILL PROCEDURE <br />TO ASSURE NO BREACH IN SYSTEM - CHECK OFTEN DURING BACKFILL <br />AND COMPACTION. <br />2. STAGE II VAPOR RECOVERY PIPING TO BE PRESSURE TESTED FOR DECAY <br />AND BLOCKAGE PRIOR TO BACKFILLING. <br />3. PIPING TO BE CHECKED FOR CONTINUOUS SLOPE BACK TO THE TANKS. <br />EQUIPMENT <br />SCHEDULE <br />ITEM <br />DESCRIPTION <br />MANUFACTURER, PART NO. <br />FURN. BY <br />OFLEX <br />GQNNECT, V <br />1-112 X 18 M X MS <br />TITEFLEX PART <br />NO. <br />110165-242-0180 <br />7-11 <br />O <br />ENVIRON ISOLATION TUBE W/DONUT <br />ENVIRON PART <br />NO. <br />FIT -3530, ITR -3020 <br />7-11 <br />O <br />2" VAPOR VENT CAP (VAPOR VAC) <br />DPW PART NO. <br />523V-2253 <br />7-11 <br />O <br />GEODUCT FLEXIBLE CONDUIT <br />ENVIRON PART <br />NO. <br />GDP -4500-1 <br />7-11 <br />4A <br />GEOFLEX-D SUPPLY PIPING <br />ENVIRON PART <br />NO. <br />GFP-2150 <br />7-11 <br />O <br />3" FIBERGLASS PIPE <br />RED THREAD II <br />OR <br />AMERON <br />G.C. <br />O <br />2" FIBERGLASS PIPE <br />RED THREAD II <br />OR <br />AMERON <br />G.C. <br />O7 <br />12" MANHOLE ASSEMBLY <br />DPW PART NO. <br />104FG-1200 <br />7-11 <br />O8 <br />4" X 4" X 3" X 2" EXTRACTOR <br />ENVIRON PART <br />NO, <br />VEF-4432 <br />7-11 <br />O9 <br />GEOTECH MATERIAL <br />SEE SPEC. SECT. III <br />2.2 <br />7-11 <br />NOTE: <br />ALL SUMPS TO BE WATER TESTED <br />NOTE: FOR VAPOR VAC INSTALLATION, <br />STAGE II VAPOR RECOVERY LINE <br />SHALL BE 2" FIBERGLASS PIPE WHEN <br />THERE ARE TWO DISPENSERS OR LESS, <br />AND 3" FIBERGLASS PIPE WHEN THERE <br />ARE THREE DISPENSERS OR MORE. <br />GENERAL NOTES <br />1. PIPING TO BE TESTED UNDER PRESSURE DURING BACKFILL PROCEDURE <br />TO ASSURE NO BREACH IN SYSTEM - CHECK OFTEN DURING BACKFILL <br />AND COMPACTION. <br />2. STAGE II VAPOR RECOVERY PIPING TO BE PRESSURE TESTED FOR DECAY <br />AND BLOCKAGE PRIOR TO BACKFILLING. <br />3. PIPING TO BE CHECKED FOR CONTINUOUS SLOPE BACK TO THE TANKS. <br />
The URL can be used to link to this page
Your browser does not support the video tag.