Laserfiche WebLink
TESTING: NOTES: <br /> 100 OHMS MAXIMUM CAUTION: AVOID CONNECTING ANY ELECTRICAL TEST ALL STAGE I FILL AND VAPOR RISER ADAPTERS <br /> 2 POINT GROUND-EARTH LEAD TO THE FILL OR VAPOR RISER IN A MANNER SHALL BE ELECTRICALLY GROUNDED TO PROMOTE <br /> RESISTANCE THAT WOULD POTENTIALLY PRODUCE STATIC THE RELAXATION OF STATIC CHARGE. <br /> UNDERGROUND COMPOSITE DISCHARGE OR SPARKS OF ANY KIND, <br /> STORAGE TANK ASSEMBLY METAL HIGH RESISTANCE OR NON--CONDUCTIVE FLUID <br /> ASSEMBLY THE FILL AND VAPOR RISERS SHALL BE TESTED FLOWING THOUGH PIPING CAN GENERATE STATIC <br /> O AFTER INSTALLATION AND PERIODICALLY TO VERIFY CHARGES CAPABLE OF IGNITING FUEL VAPORS. <br /> BONDING AND GROUNDING COMPETENCY. PROPER BONDING AND GROUNDING OF THE FILL <br /> � GROUND 'i" AND VAPOR RISER ASSEMBLIES ARE NECESSARY 't0 <br /> BONDING CONNECTOR INDEPENDENT THE MAXIMUM RESISTANCE FROM ANY FILL OR ASSURE SAFE FILLING OPERATIONS. <br /> JUMPER -- GROUND VAPOR ADAPTER TO THE BODY OF THE GROUND <br /> ROD SHALL NOT EXCEED 10 OHMS FOR A THE BONDING AND GROUNDING FOR STATIC <br /> 100K OHMS METALLIC RISER PIPE, SPILL CONTAINMENT AND ELECTRICITY PROTECTION SHALL BE IN COMPLIANCE <br /> SUMP MAX. ADAPTER ASSEMBLIES. PER ALL APPLICABLE FEDERAL, STATE AND LOCAL <br /> CODES INCLUDING NFPA 30, FLAMMABLE AND <br /> THE RESISTANCE THROUGH ANY COMPOSITE OR COMBUSTIBLE LIQUIDS CODE, NFPA 77, <br /> NONMETALLIC STAGE 1 CONTAINMENT FITTING SHALL RECOMMENDED PRACTICE ON STA11C ELECTRICITY, <br /> BE MEASURED WITH A OHMMETER CAPABLE OF NFPA 70, NATIONAL ELECTRIC CODE, AND THE <br /> READING UP TO 10 MEGAOHMS. PER THE SHELL CALIFORNIA CODE OF REGULATIONS, SUBCHAPTER <br /> STANDARD, THE SUM COLLECTIVE RESISTANCE OF 15, PETROLEUM SAFETY ORDERS-REFINING, <br /> THESE SEMI-CONDUCTIVE ELEMENTS SHALL NOT TRANSPORTATION AND HANDLING, ARTICLE 5, FIRE <br /> EXCEED 100,000 OHMS. FOR THESE SYSTEMS, AND EXPLOSIONS. <br /> THE GROUND RESISTANCE TESTER MUST BE <br /> UNDERGROUND <br /> CONNECTED TO THE GROUND CONDUCTOR PER SECTION 6.4.1.3 OF NEPA 77, THE MEASURED <br /> CONNECTION ON THE COMPOSITE CONTAINMENT TOTAL RESISTANCE IN THE GROUND PATH TO EARTH <br /> STORAGE TANK TESTING BURIED GROUND ROD SYSTEM SYSTEM OR RISER PIPE. SHALL BE LESS THAN 1 MEGAOHM WHICH IS <br /> CONSIDERED ADEQUATE FOR RELAXATION OF STATIC <br /> (EXISTING ING SIZES FOR INSTALLATIONS WITHOUT AN EXPOSED GROUND CHARGE. THE MAXIMUM ALLOWABLE GROUND PATH <br /> 1 L ROD CONNECTION, TOTAL SYSTEM RESISTANCE TO EARTH RESISTANCE FOR STATIC ELECTRICITY <br /> GROUND SHALL BE MEASURED WITH A GROUND RESISTANCE GROUNDING APPLICATIONS FOR SHELL OIL <br /> BONDING CONNECTOR TESTER BY A QUALIFIED ELECTRICIAN FAMILIAR WITH PRODUCTS US STATION SITES SHALL NOT EXCEED <br /> JUMPER GROUND TESTING. THE TWO POINT METHOD MAY 100;000 OHMS, <br /> BE USED WITH THE SITE ELECTRICAL GROUNDING <br /> SUMP 10 OHMS AS THE SECOND TEST POINT. PER SECTION 6.4.1.3 OF NFPA 77, THE <br /> MAX. RESISTANCE IN METALLIC BONDING AND OR <br /> THE NEC MAXIMUM GROUND PATH RESISTANCE FOR GROUNDING SYSTEMS SHALL BE LESS THAN 10 <br /> COMPOSITE TEST LEAD CONNECTED CURRENT CARRYING APPLICATIONS IS 25 OHMS. OHMS. RESISTANCE HIGHER THAN 10 OHMS <br /> ASSEMBLY METAL TO GROUND ROD, NOT HOWEVER, GROUND ROD TO EARTH RESISTANCE UP INDICATES INADEQUATE CONNECTIONS, <br /> LUG OR WIRING <br /> ASSEMBLY _— TO 100 OHMS SHALLBE ACCEPTABLE PER THE <br /> S <br /> SHELL STANDARD FOR STATIC ELECTRICITY A GROUNDING SYSTEM PER NEC CODE FOR <br /> PROTECTION OF THE FILL AND VAPOR RISERS, CURRENT CARRYING CONDUCTORS SHALL BE <br /> (� CONSIDERED MORE THAN ADEQUATE FOR A STATIC <br /> l ELECTRICITY GROUNDING SYSTEM, <br /> UNDERGROUND PER THE NFPA 30, SECTION 5-6.3.4 ALL PARTS <br /> STORAGE 'TANK TOOK OHMS OF THE FILL PIPE ASSEMBLY, INCLUDING THE DROP <br /> MAX. TUBE, SHALL FORM A CONTINUOUS ELECTRICALLY <br /> CONDUCTIVE PATH. <br /> GROUND SIZING OF THE GROUNDING AND BONDING WIRE <br /> BONDING CONNECTOR CONDUCTORS FOR STATIC PROTECTION SYSTEMS IS <br /> JUMPER TYPICALLY BASED ON MECHANICAL STRENGTH <br /> RATHER THAN CURRENT CARRYING CAPACITY. <br /> HOWEVER, PER THE CALIFORNIA CODE OF <br /> SUMP REGULATIONS, THE MINIMUM WIRE SIZE FOR <br /> BONDING AND GROUNDING SHALL BE COPPER AWG <br /> P. <br /> BACKFILL TESTING EXPOSED GROUND ROD SYSTEM A 5/8"6 BY 10' LONG COPPER CLAD STEEL <br /> NATIVE GROUND ROD SHALL BE DRIVEN INTO NATIVE SOIL <br /> SOILONLY. PLACING THE GROUND ROD INTO TANK PIT <br /> v EXTREME CAUTION MUST BE OBSERVED WHILE USING ANY NON INTRINSICALLY <br /> 8" d SAFE DEVICE IN CLASSIFIED AREAS. SUMP MUST BE TESTED POR VOLATILE PEA GRAVEL SHALL NOT BE PERMITTED UNDER ANY <br /> PLAN VIEW tDGROUND ROD ACCESS VAPORS PRIOR TO USE, ELECTRICAL CONNECT MUST BE MACE WITH JUMPER CONDITIONS. THE CONTRACTOR IS RESPONSIBLE <br /> COVER 0 ■ WIRE SO FINAL CONNECTION IS AWAY FROM CLASSIFIED AREAS. ■ FOR CLEARING ANY UNDERGROUND UTILITIES PRIOR <br /> TO INSTALLATION OF THE GROUND. <br /> THE GROUND ROD TO GROUND WIRE CONNECTION <br /> SHALL BE ACCESSIBLE THROUGH A H-20 RATED <br /> 8"0 MINIMUM ACCESS COVER TO ASSIST <br /> INSPECTION, MAINTENANCE AND TESTING, THE <br /> SCREW TYPE GROUND ROD CLAMP SHALL BE UL <br /> LISTED FOR DIRECT BURIAL, <br /> 2D GROUND ROD CLAMP 8" H-20 Q3 ONE STRANDED #8 THHN CONDUCTOR SHALL BE <br /> CORD GRIP© COMPOSITE METAL ACCESS COVER RUN TO EACH FILL AND VAPOR RISER CLUSTER <br /> CONTAINMENT CONTAINMENT CORD GRIP SLOPE CONCRETE FROM THE GROUND ROD. THE CONDUCTOR SHALL <br /> ASSEMBLY ASSEMBLY HAVE 18" MINIMUM COVER. THE CONDUCTOR <br /> ELBOW EX ELBOW -..q• ,,. SHALL PENETRATE THE SUMP USING A 3/4" PVC <br /> SHOWN ROTATED 90' COATED CONDUIT AND APPROVED PENETRATION <br /> '.• hi, " -c< FITTING. THE CONDUIT SHALL BE BENT 90' TO <br /> •' THE VERTICAL AND TERMINATE WITH A CLASSI , DIV <br /> CONDUCTOR • II SEAL-OFF FITTING, THREADED ELBOW AND CORD <br /> CONDUIT GRIP FITTING. A BRONZE PIPE CLAMP SHALL BE <br /> II CORD GRIP CONNECTED TO THE RISER PIPE 1'0 THE BONDING <br /> MATERIAL LIST OR GROUND CONDUCTOR. TO ASSURE A <br /> CONDUIT COMPLETE CONNECTION, ANY PAINT OR COATING <br /> ON THE RISER SHALL BE REMOVED PRIOR TO <br /> CORD GRIP 6 INSTALLATION OF THE GROUND CLAMP, <br /> O '� 1 5/8"6 X 10' LONG COPPER CLAD STEEL GROUND ROD <br /> �- GROUND LINES O GLAVEN INDUSTRIES P/N 6260613 OR EQUIV. ELECTRICAL CONDUIT, FUELING SYSTEM HARDWARE <br /> TERMINATE 2" ABOVE #8 GROUND CONDUIT TO OTHER SUMPS OR THE STATION ELECTRICAL GROUNDING SYSTEM <br /> HIGHEST PENETRATION FITTING CONDUCTOR CONDUCTOR PENETRATION U2 GROUND ROD CLAMP, UL LISTED FOR DIRECT BURIAL, SHALL NOT BE USED FOR GROUNDING OR BONDING <br /> PIPE GROUND CLAMPU4 <br /> FITTING I THOMAS-BETTS P/N JAB58H OR EQUIV FILL. AND VAPOR RISERS. <br /> ( POMECO/OPW 5110-OBVA 8" H-20 RATED ACCESS <br /> CRIMPED GROUND COVER RISERS INSTALLED ON STEEL UST'S SHALL UTILIZE <br /> 3/4" PVC COATEDT-��/� LUG BOLTED TO ISOLATION BUSHINGS PER THE MANUFACTURES <br /> CONDUIT WITH SHORT HOUSING ® 4" NPT ADJUSTABLE BRONZE PIPE CLAMP, LIND INSTRUCTIONS TO PREVENT CATHODIC CORROSION. <br /> RADIUS SWEEP NOT TO SCALE TANK - EQUIPMENT P/N JR-150-30 (905) 475-5086 <br /> NOT TO SCAL� 0 3/4" CONDULET ELBOW, CLASS 1, DIV 1, GROUP D. <br /> 3/4" WEAVER CROUSE-HINDS P/N LBY25 OR EQUIVALENT <br /> PENETRATION PITTING <br /> SUMP WALL AGROUND ROD ® 3/4" NPT CORD GRIP, CROUSE-HINDS P/N CGB-292, <br /> RANGE :1254 TO .256, ZINC STEEL <br /> PENETRATION DETAIL ELEVATION ' VIEW DETAIL <br /> These drawings and specifications are the confidential and I APPROVALS CALIFORNIA U.S.T STANDARDS <br /> proprietary property of Shell Oil Products US and shoil not be 0 10 20' <br /> copied, reproduced, disclosed, or used without Shelf Oil - DISTRICT MANAGER <br /> Products US's written authorization. They are Intended as SHFaLl„ OIL PRODUCTS COMPANY, US STATIC ELECTRICITY PROTECTION <br /> contract documents for use on this specific project in -- AREA TECHNICAL MANAGER <br /> conjunction with its issue date and are not suitable for use on GRAPHIC SCALE FILL_ AND VAPOR ADAPTORS <br /> a different project or at o later dote. 12700 Northborough Drive TERMINAL MANAGER <br /> I 1 10 Houston TX 77067-2508 SCALE: SAP/WIC # DATE: DRAWN: REQUESTED BY; <br /> Q Shell Oil Products, US All Rights Reserved 2002 ENGINEER STATIC- 1 <br /> REV BATE DESCRIPTION OF REVISION BY APP NONE SAP 7-31 -02 WYPER HOVLAND <br />