My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1995 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2420
>
2300 - Underground Storage Tank Program
>
PR0231580
>
COMPLIANCE INFO 1995 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2021 1:12:30 PM
Creation date
11/5/2018 9:02:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995 - 2008
RECORD_ID
PR0231580
PE
2361
FACILITY_ID
FA0003963
FACILITY_NAME
TRACY 76
STREET_NUMBER
2420
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
Tracy
Zip
95377
APN
23802006
CURRENT_STATUS
01
SITE_LOCATION
2420 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\2420\PR0231580\COMPLIANCE INFO 1995 - 2008.PDF
QuestysFileName
COMPLIANCE INFO 1995 - 2008
QuestysRecordDate
8/10/2018 6:20:10 PM
QuestysRecordID
3960413
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mar , lb - 2LU5 2 :30PM ight Environmental E32-5152 4 No -7837 F . 2 <br /> vaiero Service Station - Proposal Rev. 1 (cant.) <br /> Page 2 <br /> • Any delay associated with encountering subsurface contamination in soil during the <br /> course of the UST repair work; (Additional labor, materials and equipment for standby <br /> will be charged for as per our Standard Rate Schedule) <br /> • Pea gravel that results in undermining of adjacent concrete or subsidence of any kind in <br /> tank excavation sidewalls; <br /> • Containers, labeling, transportation and/or disposal of any solid or liquid waste that is, or <br /> appears to be, contaminated by any regulated materials or waste; <br /> • Additional time associated with removal and replacement of spill buckets with separate <br /> drain lines; <br /> Stipulations: <br /> • The local Department of Environmental Health, Fire Department and Air Pollution <br /> Control District all may inspect the work that Wright completes; however, the owner <br /> should note that testing and inspection work is poorly defined within the regulations, and <br /> testing is left to interpretation of oversight agencies. All estimated costs are subject to <br /> change based upon any particular inspector on any particular site. Wright cannot control <br /> all variables or guarantee that there will not be unforeseen additional regulatory <br /> expenses, administrative expenses, and/or expenses for remobilization or labor <br /> downtime. The price quoted in this proposal is limited to only those items named in this <br /> proposal; <br /> • Any delays caused by the client, client's employees, client's vendors, client's customers, <br /> or regulatory agencies, will be charged at time and material rates as per the attached <br /> rate schedule; Downtime for these reasons, or waiting for an inspector, is chargeable <br /> time; <br /> • Client is responsible for identifying any buried utilities of any kind (conduits, conductors, <br /> plumbing, etc.) in the work area and indemnifies Wright from any responsibilities for <br /> damages for such utilities not located; <br /> • The basis of this proposal is that there are six buckets total —3 fill and— 3 vapor, all <br /> set separately in cement. <br /> • Client will allow Wright Environmental Services access to the worksite as well as <br /> electricity, water and sanitary facilities during the duration of this project; <br /> • No fuel deliveries allowed during EVR upgrade work (approximately 2-3 days); <br /> • Client must complete the requirements and conditions listed in the "Authority to <br /> Construct" (ATC)within the time periods therein specified. Satisfactory completion is <br /> necessary for the client to obtain a "Permit to Operate"and then he is in compliance. <br /> Client must contact an appropriate third party testing contractor and ensure completion <br /> of the listed tests within 45 days of Wright's completing the work described here. Wright <br /> will notify in writing the APCD upon completion. During the 45-day period and 3`d party <br /> testing any repairs required to pass would be provided by Wright on a time and materials <br /> basis. All testing and additional repairs must be completed within the specified 45-day <br /> period; <br /> • Modifications to the UST system, which are not specifically named and included in this <br /> contract, will be completed by separate contract or named and allowed by the client in a <br /> change order; <br /> • Any risers extending up from tank are spaced far enough apart to allow installation of <br /> retrofit buckets without modification; <br /> Shelly;teMPlaLcs;bids rev4TM <br /> MAR-16-2005 WED 02:31 TEL:2098323542 NAME:RANBIR P. 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.