My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1995 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2420
>
2300 - Underground Storage Tank Program
>
PR0231580
>
COMPLIANCE INFO 1995 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2021 1:12:30 PM
Creation date
11/5/2018 9:02:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995 - 2008
RECORD_ID
PR0231580
PE
2361
FACILITY_ID
FA0003963
FACILITY_NAME
TRACY 76
STREET_NUMBER
2420
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
Tracy
Zip
95377
APN
23802006
CURRENT_STATUS
01
SITE_LOCATION
2420 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\2420\PR0231580\COMPLIANCE INFO 1995 - 2008.PDF
QuestysFileName
COMPLIANCE INFO 1995 - 2008
QuestysRecordDate
8/10/2018 6:20:10 PM
QuestysRecordID
3960413
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AdSL <br /> I <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- PAGE 2 <br /> VI. DISPENSER MONITORING <br /> MONITORING OF AREAS BENEATH DISPENSER(S)IS PERFORMED%AWUSING THE FOLLOWING METHOD(S)(Check all that apply) MSG. <br /> Ak 1.CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT(UDC) <br /> PANEL MANUFACTURER: c44 Msi. <br /> MODEL#: <br /> LEAK SENSOR MANUFACTURER: Msa. MODEL#(S): M54. <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? ❑ a.YES b.NO M55. <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES �`b.NO M56. <br /> WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ;9:-b.NO M57. <br /> Ik <br /> 2.MECHANICAL ASSEMBLY(e.g.,FLOAT AND CHAIN ASS BLY)IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br /> bt USs <br /> ASSEMBLY MANUFACTURER: �A� 0}p M . <br /> MODEL#(S): M59- <br /> 3.VISUAL MONITORING DONE: �a.DAILY ❑ b.WEEKLY(Requires agency approval) Mso. <br /> ❑ 4.NO DISPENSERS <br /> ❑ 99.OTHER(Specify) <br /> M1161 <br /> VII. ENHANCED LEAK DETECTION <br /> ❑ I.WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK :rvo. <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN,PER 23 CCR§2644.1,ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> VIII. TRAINING <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) Mgo <br /> I. THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2. OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) <br /> 3. THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as of 1/01/2005) <br /> 4. CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5 ML CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6- STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> 7. ❑ SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS_" <br /> 99. El OTHER(Specify): Mal. <br /> Personnel with UST monitoring responsibilities are familiar with ali of the above documents relevant to their job duties and can access those documents when needed. <br /> By January I,2005 this facility will have a`Designated UST Operator"who has passed the operator exam administered by the Intemational Code Council(ICC). By <br /> January I,2005,and annually thereafter, the "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems. <br /> This training will include,but is not limited to,the following: <br /> > Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> > The facility employee's role with regard to the leak detection equipment. <br /> > The facility employee's role with regard to spills and overfills. <br /> > Whom to contact for emergencies and leak detection alarms. <br /> For facility employees hired on or after January 1,2005,the initial training will be conducted within 30 days of the date of hire. <br /> IX. COMMENTS/ADDITIONAL INFORMATION <br /> Please use this section to include any additional UST system monitoring-related information(e.g.,additional information required by your local agency): Mas. <br /> X. PERSONNEL. RESPONSIBILITIES <br /> AS OF 111105, THE "DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT APPLICATION — <br /> FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br /> EQUIPMENT COVERED BY THIS PLAN,AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br /> UST SYSTEMS IN ACCORDANCE WITH 23 CCR§2715(b). <br /> XI. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION: 1 certify that the information provided herein is true and accurate to the best of my knowledge. <br /> OWNER/OPERATOR SIGNATURE REPRESENTING DATE: M9i. <br /> , t� ❑Owner Mao, t,,�'^ t�.►l^ CL J ❑Operator ) I _S_ d 1 <br /> OWNER/OPERATOR NAMEriM9' M93 <br /> (Pnt): OWNER/OPERATOR TITLE: <br /> JSHk�AN N1 I t-� H r-AS <br /> (Agency Use Only) This plan has been reviewed and: N21pproved ❑Approved With Conditions ❑Disapproved <br /> Local Agency Signature: Date: _14I2 91�* <br /> Comments/Special Condi ' s: <br /> SJCEHD-d(07/03)-314 07/73/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.