My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1995 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2420
>
2300 - Underground Storage Tank Program
>
PR0231580
>
COMPLIANCE INFO 1995 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2021 1:12:30 PM
Creation date
11/5/2018 9:02:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995 - 2008
RECORD_ID
PR0231580
PE
2361
FACILITY_ID
FA0003963
FACILITY_NAME
TRACY 76
STREET_NUMBER
2420
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
Tracy
Zip
95377
APN
23802006
CURRENT_STATUS
01
SITE_LOCATION
2420 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\2420\PR0231580\COMPLIANCE INFO 1995 - 2008.PDF
QuestysFileName
COMPLIANCE INFO 1995 - 2008
QuestysRecordDate
8/10/2018 6:20:10 PM
QuestysRecordID
3960413
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A Results of Testing/Servicing <br /> Software Version Installed_ <br /> Ocoiete the followin checklist: <br /> ❑ No* Is the audible alarm o erational? <br /> D No* is the visual alarm o erational?❑ No* Were all sensors visually ins eted,functional) tested,and confirmed o rational? <br /> ZEf D No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their pwTer operation? <br /> Q Yes ❑ o* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> fU NIA operational? <br /> Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ NIA monitoring system detects a leak, fails to ope,_ra�'or is electrically disconnected? if yes: which sensors initiate <br /> positive shut-down? (Check all that apply) E�Sump/Trench Sensors; ❑Dispenser Ccotinment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ffYYes; ❑No. <br /> Yes D No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> ❑ NIA mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? If so; at what percent of tank capacity does the alarm trigger? J % <br /> ❑ Yes* No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced <br /> and list the manufacturer time and model for all replacement 2arts in Section E,below. <br /> Yes* ❑ No Was liquid found inside any secondary containment systems designed as dry systems? (Cheek all that apply)D <br /> Product; ❑ Water. If yes,describe causes in Section E,below. <br /> JCes Cl No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> lr Yes 53—N-0 Is all monitorin mento erational er manufacturer's s cifications? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments.- 2` jjj iQ= Y' 16r 31 <br /> Page 2 of 3 03AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.