Laserfiche WebLink
SV,IRCB, January 2002 Page of -Z— <br /> S. <br /> S. SPILL/OVERFILL CONTAINMENT 14bXES <br /> Facility is Not E nipped With SpilYOverfll Containment Boxes [I <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested <br /> Test Method Developed By: :1 Spill Bucket Manufacturer ',industry Standard 01 Professional Engineer <br /> E Other(Specify) <br /> Test Method Used: Pressure ❑Vacuum ydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spin Box# ( Spill Box# Z SPHI Box# , Spill Boa# <br /> Bucket Diameter: 1 2 I Z`r, t'Z if <br /> Bucket Depth: 1 q t z`r <br /> Wait tune between applying <br /> pressure(vacuum/water and <br /> starting test. •cK <br /> Test Start Time: <br /> Initial Reading 034): �s <br /> Test End Time: <br /> Final Reading(RF):: i <br /> Test Duration: 1 A r f nr r l k r <br /> Change in Reading(R,,—R.j): 40 or <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Paste Fat3 ,' : 0i P=x-, 0.Fair ❑ Pass: ', Fag <br /> C0MMentS—(include information on repairs made prior to testing, and recommended follow-upfor failed tests) <br /> C' f7Lt CtC T p /%nr tx!45 !7 r 'l H Fl Cc_ j3 k_ <br /> tAjA-T 7wc!1 - cc 1!5'R,7 5 <br /> ,ef *k— Z C i J.4-` &1r Siru'a <br />