My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1995 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2420
>
2300 - Underground Storage Tank Program
>
PR0231580
>
COMPLIANCE INFO 1995 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2021 1:12:30 PM
Creation date
11/5/2018 9:02:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995 - 2008
RECORD_ID
PR0231580
PE
2361
FACILITY_ID
FA0003963
FACILITY_NAME
TRACY 76
STREET_NUMBER
2420
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
Tracy
Zip
95377
APN
23802006
CURRENT_STATUS
01
SITE_LOCATION
2420 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\2420\PR0231580\COMPLIANCE INFO 1995 - 2008.PDF
QuestysFileName
COMPLIANCE INFO 1995 - 2008
QuestysRecordDate
8/10/2018 6:20:10 PM
QuestysRecordID
3960413
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM „ ► i <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoringt <br /> program are conditions of the operating permit. The permit holder must notify San Joaquin County <br /> Environmental Health Division, phone (209) 468-3420 within ail days of any changes to the monitoring <br /> procedures, unless required to obtain approval before making the change. Jb <br /> Required by Sections 2632(d) and 2641(h) CCR. <br /> // AL HEALTH <br /> - _. flZ-- � ��.`ICES <br /> FacilityName6 ��f J�t1'ti' �" ��-, �S ��'�V � l�(_ L I <br /> �� �, <br /> Facility Address_�4 ,2 L' �`�������C' �� 6A . � � � -7/, <br /> A. Describe the frequency of performing the monitoring: <br /> Tank ('K,! 1-/ ) <br /> Piping <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring: _ <br /> Tank -F- I i~�rf't.kl� c, X4 )i_B) �_ L - 3 � U �,UNT-1 V u o u <br /> Piping - �FG W1 C �- t t)r O `^INU ''cif <br /> C. Describe the Iocation(s) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> Lc- aLT-Q9 <br /> D. List the name(s) and title(s) of the people responsible for performing the monitoring <br /> and/or maintaining the equipment: <br /> E. Reporting format for monitoring: <br /> Tank LELI-110011 �CLILEFT- E9WT- - 0Y : 1h;[ t?fW- 1150h[ AWM <br /> Piping i IlL�inks ISL YcM <br /> F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufacturers' maintenance schedule <br /> but not less than every 12 months: nj L U l i - !L��'&_-T-z t tj <br /> G. Describe the training necessary for the operation of UST system, including piping, <br /> and the monitoring equipment:_0 �-F1 ,i,9 PiT100 L C 97 r fj 61 <br /> o ' ,12 tS 1=C.0 '"?YT'1QN I <br /> I S C� t;- 4 Ltc �► <br />
The URL can be used to link to this page
Your browser does not support the video tag.