Laserfiche WebLink
S'.V RC B. lannani ?Uo? <br /> Page of <br /> S. SECONDARY PIPE STING — -- <br /> Tcst :ble;ltod Developed By: G Piping Manufacturer fflrdusuyStauLwa O Professional Engineer - -- <br /> ❑ (Specify) <br /> Test Method Used: ressure — <br /> ❑Vacuum 0 Hydrostatic — <br /> ❑Other(Spew,& <br /> t Egttipment Resolution: <br /> .Piping Run ik I Piping RUB 9 -L Piping Run ># Pim Run <br /> PiPingr\laterial: v P g <br /> r <br /> Piping Vfantttacmrer. U '� { `- <br /> Piping Diameter: t <br /> Leugth of Piping Run: i <br /> Product Stared: <br /> Method and location of d <br /> i ins-nut isolation: <br /> Wait time between applying t •• <br /> pressure/Vanmtu/nater and <br /> startin"test: <br /> Test Start Time: ~ H <br /> i>ritial Reading(R,): <br /> Test End Time: <br /> Final Reading(RN): <br /> TeR Duration: _ _ i <br /> n • ly`; <br /> Change in Reading(RF-R0 � �__ <br /> Pass/F.til Threshold or <br /> Criteria: I <br /> Test Result: Pass Full <br /> �p:tss ❑Fail @'Pass ❑F•ril I7 Pass C Fail <br /> Comments—!inc!ude information on re airs made prior to testing, mrd recommended follow-up for%ailed tests) <br />