Laserfiche WebLink
Page I of /.3 <br /> SWRCB,January 2002 <br /> 7, UNDER DISPENSER CONTAINMENT C TESTING <br /> Test Method Developed By: I UDC Manufacturer X Industry Standard D Professional Engineer p <br /> D Other(Spec) <br /> ❑Pressure U Vacuum <br /> Test Method Used X Hydrostatic <br /> ❑Other(Specify) <br /> Equipment Resolution <br /> TestEquipment Used: See attached testing procedures. = <br /> UDC# IJDC# _ UDC# • - '' UDC# °7 �y <br /> UDC Manufacturer: to 5 <br /> UDC Material: L• *s <br /> UDC D the <br /> Height from UDC Bottom to Top 112L <br /> of Iii est Pi in Penetration: <br /> Height from UDC Bottom to y li <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to 4 s <br /> ��� <br /> testin : CI U hest hest Above highest <br /> Above hi Above hig <br /> Above highest <br /> Portion Of UDC Tested g netratlon netratlon enetratlon <br /> tion <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes ONO XNA o Yes ONO XNA ❑Yes ONO XNA ❑Yes ONO XNA <br /> roduct and water ? <br /> Turbine shutdown use time <br /> Is system pro grammedfor fail- Xyes ONO DNA XYes ONO DNA XYes 11No 7NA XI ONO DNA <br /> safe shutdown? <br /> Was fail-safe verified to be D Yes X_No DNA D Yes XNo INA D Yes X No DNA ❑Yes X No CTIA <br /> Operational <br /> Wait time between applying <br /> 30 minutes 30 minutes 30 minutes 30 minutes and <br /> starting test L <br /> Test Start Time: o? <br /> Initial Reading(Ril: <br /> Test End Time: ,7 J <br /> Final Reading(RF): -G a <br /> Test Duration: / V a <br /> U U Cl LEO <br /> ChaiReadine(R�Ril: U u c�Z/G G • c1 <br /> u G <br /> PassZ/Fan a i1 n Threshold or Criteria: 0.002 <br /> 0.002 0.002 0.002 <br /> Test Result: Pass 0 Fail Pass 0 Fail Pass ❑Fail ass ❑Fail <br /> Was sensor removed for testing? X Yes I No INA X Yes I No INA X Yes ONO INA X Yes D No DNA <br /> Was sensor properly replaced and X Yes D No DNA X Yes D No DNA X Yes o No DNA X Yes 0 No DNA <br /> verified functional after testing? — <br /> Comments (include information on repairs made prior to test nM and recommendedfollow-upfor failed tests) <br /> SB 989 3-Year Compliance Testing <br /> WO#060310-045 <br /> COSTCO#200737 <br /> 3250 W Grant Line I Hwy 205 <br /> Tracy,CA 95304 <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO" or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />