My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO 2002-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 3:50:10 PM
Creation date
11/5/2018 9:14:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2006
RECORD_ID
PR0518288
PE
2361
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\3250\PR0518288\COMPLIANCE INFO 2002-2006.PDF
QuestysFileName
COMPLIANCE INFO 2002-2006
QuestysRecordDate
7/5/2017 7:22:22 PM
QuestysRecordID
3481896
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Testing Procedures <br /> Secondary Containment Testing, Underground Storage Tank Systems <br /> Contractor: Fueling & Service Technologies, Inc. (FASTECH) <br /> Testing Technicians: <br /> Site Manager, Primary Tester: Alberto Rodriquez, (714) 325-9477 <br /> Jose Dethier, (714) 306-3075 <br /> Abe Reintord (714) 325-7495 <br /> Cesar Plascencia (714)404-8893 <br /> Jim Simeone (714) 926-3165 <br /> Steve Acosta (714) 809-6018 <br /> Site Safety Officer: Primary Tester <br /> Qualifications: <br /> • FASTECH currently holds business license number CA 794519_A, Haz, C21 <br /> • Information regarding Worker's Compensation and Employers' Liability (available upon request). <br /> • FASTECH provides HAZWOPR training for employees. FASTECH develops a site-specific Health and Safety <br /> Pian wl Confined Space Permit for each testing location (available on-site, day of testing). <br /> Test Equipment: <br /> • FASTECH utilizes third party certified hardware and software for all hydrostatic tests (attached). The primary <br /> tester is certified, by the manufacturer of the equipment used (Enhanced Leak Detection Systems, Inc.), to test <br /> containment sumps, under dispenser containment, and spill buckets. <br /> • Pressure Gauges, Ametek-U.S. Gauge, 0-15 psi pressure range, 4.5-inch diameter, glycerin filled, .5% span of <br /> scale, calibrated every six months. <br /> • Vacuum Gauges, Ametek-U.S. Gauge, 0-30 in-hg vacuum range, 4.5-inch diameter, glycerin filled, .5% span of <br /> scale, calibrated every six months. <br /> • Vacuum Pump, Gast Model 2Z866, 120 volt AC. Pump mounted greater than 18-inches (about 3.5-feet) above <br /> work surface (surface grade), with outlet tubing terminating outside the work zone. <br /> Test Procedures: <br /> • Local CUPA will be notified of testing schedule a minimum of 48-hours before the test is scheduled to begin. <br /> During testing, station's dispensing equipment may remain in operation providing no health and safety <br /> concerns arise for either the public or test crews. Testing will be performed within an exclusion zone. If, at any <br /> time, the site safety officer or local CUPA deems any situation unsafe, the site safety officer will shut the <br /> station's dispensing equipment down. Testing will only be conducted when all health and safety concerns are <br /> met. <br /> • Sump Cleaning and Preparation. <br /> FASTECH will steam clean all turbine sumps, dispenser pans, and spill buckets. The water and waste <br /> generated during the cleaning process will be temporarily stored on-site in a labeled drum (dated, Haz Waste <br /> Label). The client will classify the drum, and provide transportation for drum disposal in a timely manner. Once <br /> the site has been cleaned, it will be ready for testing. <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.