Laserfiche WebLink
09/26/2002 14:42 FAX 425 251 8782 BARGHAUSEN _ Z011 <br /> 0S/17/2002 16:55 523 — IPE INC PAGE 64 <br /> Sap-17-02 04: 10P stvoupe petroleum rnaint 707 577 0586 P.06 <br /> Monitorla`Syewm C@rr1LlCati0" <br /> F, in•Timi:Gauging/Slit Equipment: ❑ Check this box if umk gmji2S is us®d only for inventory control <br /> ❑ Check this box if no tank gavEing or SfR oquipment it,installed. <br /> Tt;ls section must tx completed if in•taak gauging equipment is used to perform leak detection monitoring. <br /> Comwele the following cheetma: <br /> Yes I 0 Now I Has all input wiring ban iospect4d Por proper entry and termination,including testngoo :aulLs'? <br /> Yes Cl No• era all tank pulling probes visually inspected for damago and residua buildup'! <br /> Ytu Cl No* Was accuracy of sy.ema lsoduct level readiupa riatndl <br /> _ Yes ❑ NCO Wu accuracy of system water Laval readings tested? <br /> Yee ❑ No'_ Were all probes relastalied properly? <br /> Yea Ll Ne• I 'Were all items an The rquipount Frimufacturen''a travmenan.Y checklist eomplemd? <br /> •In the Section Hr below,deacrtbe bow end when there defldinclea were or wM be corrected. <br /> G. Line UA Detectors (LLD): ❑ Check rhii box ifLLDa arc not Installed. <br /> c9molete the follow checkllft; <br /> O Yea ❑ No" For agwprneru dart-up or annual egt>Ipmcnt cut;fication, was a leak simulated to verify L1.D performance? <br /> Cl DUA (Cherk all that apply) Slmulaled leak rate: O 7 g.p.h.; ❑0.1 g.p.h, ❑0.2 g.p.h <br /> ❑ Yes 0 No' Waro ailLLlh confirmed aperadotral and vi rvw to within regulatory requirements? <br /> ❑ Yen l] Na• Was the!"ring Apparatus properly callbrated7 <br /> Q Yos I C3 No- For mfichanlcal L.LDa,does the LLD restrict product flow;f it detects a leak? <br /> ❑ NIA <br /> ❑ Yu ❑ No• Far elccironic Uses,does the turbine auturmlicilly shut off if the LLD de=ts a leak? <br /> ❑ QUA <br /> 0 Ya ❑ No• For electronic LLDs,does the turbine automndically shut off it any portiock of the monitoring system is disahlcd <br /> 0 NIA rr diacoturecpai7 <br /> O Yes ❑ NOW For elecanni.l-3 Ds,dose the turbine turramsurilly Out off If any portion of the monitoring system malfunctions <br /> 0 NPA ar hada a teat? <br /> * Yet O So- For ebreutdc L",ltrva fill LCOM bb winng connections been visually Wpected? <br /> C3 NIA <br /> ❑ Yet 4 No'i Were all items on the equipwrront Nene dleturer'a marntaaanee ohecklid completed? <br /> • to toe Senaoa IL.below,dwcslbe bow and wltea tb®deticlead"were or will be corrected. <br /> H. Conuncuts: Ap9-L4e=k-aR--- u¢T r�b4allt. A7 ZA 5 T1 +� <br /> U.4-0Ia-]le Pace 3 of 3 Rev.0erauoi <br /> .,...v.adoanra <br />