Laserfiche WebLink
09/26/2002 14:48 FAX 425 251 8782 BARGBAUSEN Z030 <br /> _ — — — IPE INC PAGE 04 <br /> 09!13!2002 10.52 523 L <br /> Date 2/22/2002 <br /> WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> ThiS monitorins program most be kept.at the UST location at all times. Thes�o stio�W on is monitsning progra 0 are <br /> of <br /> conditions of the operating permit. The permit holder must notify <br /> any Changes to the monitoring procedures,unless required to obtain approval before snaking the change. <br /> .Required by Sections 26=d)end 2641(h)CCR. <br /> Facility Name: Costco Gasoline Loc. No. 135 <br /> Facility Address: Trac Market lace on Grantline Road Trac CA <br /> A. Describe the frequency of performing the monitoring: <br /> Taak- Continuous monitoring-byVeeder Root. A Veeder Root 350R tank <br /> monitor re orts the li uid level by a Pash of a button. A hydrostatic monitorin <br /> s stem constant! monitors 100% of both the inner and outer tanks. <br /> Piping- In-line leak detectors for 21P159 monitorin apd li uid level sensors for <br /> secondary contain gent sumps are continuously monitored. <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring: <br /> Tank- Veeder Root 350R tank monitor with MAG 1 tank level probe for 2roduct <br /> monitoring and Veeder Roothydrostatic sensor VR 94980-301 for secondary <br /> containment monitoring. <br /> Piping- FE Petro Submersible turbine with VALD-2000 leak detector for in-line <br /> product pipe motzxtoring and Veeder Root sumo sensor VR 794390 for secondary <br /> containment monitor and VR . <br /> C. Describe the locations(s) where the monitoring will be performed. (facility plot <br /> plan should be attached):Veeder Root console is located in the controller <br /> enclosure; the tank monitor equipment is located below rade at the fill ends of <br /> the tanks, the Piping ,is monitored at the tank submerged turbine sums and <br /> dispenser island surtt2s. <br /> D. List the name(s) and title(s) of the people responsible for performing the <br /> monitoring and/or maintaining the equipment: Warehouse Manager for the <br /> Costco Wholesale facility No.453' Mr. Dennis Bock comrpliance Manager, <br /> Costco Wholesale, Inc. <br /> - <br /> E. Reporting format for monitoring: <br /> Tarek Inventory Paper Report/tank' roduct volume,ullave- height. water Vol.,_& <br /> temp <br /> Piping Tightness Patter Report/sensor: Interstitial/Sump Leak Status <br /> F_ Describe the preventive maintenance schedule for the monitoring equipment. <br /> Note: maintenance mast be in accordance with the manufacturers' <br /> maintenance schedule but not less than every 12 months. 1/year min or as <br /> required; MAG 1 probe, VR 94980-301 VR 350 VR 79340 <br /> G. Describe the training necessary for the operation of the UST system, including <br /> piping, and the monitoring equipment: Gasoline attendants are required to <br /> demonstrate knowledge of facility Policies and procedures rcizarding s ill <br /> cleanup and disposal emergence spill response and notification, monitoring <br /> equipment pump shutoffs and first aid. <br /> Solan County <br /> Deparunent of Envirotuaentat Management <br /> r:�osK7RONwm.o.+w. �s•am _a.;oee rw.a <br />