My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2002
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
INSTALL_2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2023 1:00:14 PM
Creation date
11/5/2018 9:19:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2002
RECORD_ID
PR0518288
PE
2361
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\3250\PR0518288\INSTALL 2002.PDF
QuestysFileName
INSTALL 2002
QuestysRecordDate
7/5/2017 9:39:11 PM
QuestysRecordID
3482255
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM DRAWING INFORMATION <br /> 1. Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br /> 2. !� Plans drawn to scale in non-erasable print. <br /> 3. Plot plan to show location of tanks and all associated piping. <br /> 4. Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. Vl' Tank cross-sectional diagram. <br /> 6. %/ Detail of tank, associated piping, excavation and cover. <br /> 7. ✓ Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Chapter 16, <br /> Article 3, Section 2631 (b) & 26351 <br /> 8. "� verification of product compatibility with the tank(s), piping, monitoring <br /> f device(s), epoxy or silicone glues, etc. <br /> 9. ✓ Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br /> 10. At the installation site, prior to installation, a tightness test shall be performed on both primary (T°) and <br /> secondary (2°) containment systems before covering. (Section 2635 (a) (3) & (4)) <br /> 11. v Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br /> submitted directly to PHS-EHD from the testing company or owner of facility. [Health & Safety Code, Division 20, <br /> chapter 6.7, Section 25291 (h)] <br /> 12. TANK COMPOSITION <br /> TANK N # 1 # 2 # 3 # <br /> i <br /> CAPACITY 20,000 20,000 20,000 <br /> MANUFACTURER Containment Solutions-------- <br /> COMPOSITION Fiberglass/ Plastic---------- <br /> { MODEL ,air-v 1*'C( Owe-&Tyjk-d OwT+a Tr IT <br /> PRODUCT 97 octane 87 octane 92 octane <br /> CORROSION PROTECTION Fiber lass Reinforced Plastic <br /> U.L. LISTED Yes Yes Yes <br /> COMPATIBILITY WITH 100X Yes Yes YES <br /> i <br /> METHANOL <br /> 13. TANK(s) TO BE INSTALLED <br /> A. Steel-clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br /> coatings or coverings. <br /> _ (1) Tested at the installation site using an electric resistance holiday detector. <br /> ___,_ (2) Vacuum applied to interstitial space. <br /> f <br /> B. Fiberglass <br /> (1) installation instructions require an air test and soap bubble test prior to installation. <br /> (2) vacuum applied to interstitial space. <br /> ✓ (3) Hydrostatic annular (primary tank pressure test). <br /> C. Non-clad steel tank [Section 2635 (a) (2) (A)] <br /> (1) Cathodic protection provided for entire tank, piping and comporents (nuts, bolts, washers, <br /> etc.). <br /> (2) Field installed cathodic protection systems designed and certified as adequate by a <br /> corrosion specialist. <br /> (3) Impressed current systems to be inspected no less than every 60 days. <br /> I <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.