Laserfiche WebLink
1 <br /> 19. �� Piping (cross-sectional diagram, including connections to tank and dispensers). <br /> (A) Vent and tank riser primary containment system equipped with overfill prevention system that: <br /> Restricts delivery of flow to tank [Section 2635 (b) (2) (B) or (C)], or <br /> Provide positive shut off of flow to the tank at no more than 95 % [Section 2635 (b)(2)(C)], or <br /> (8) ! Vapor recovery piping designed so it cannot contain liquid phase product, or <br /> (C) Suction piping (below grade piping operates at Less than atmospheric pressure) [Section 2636 (a) (3)] <br /> _ Sloped so contents of the pipe will drain back into the storage tank if the suction is <br /> released. <br /> No valves or pumps installed below grade. <br /> inspection method ;provided to demonstrate compliance with section 2636 (a) (3). <br /> (D) �- Corrodible underground piping protected against corrosion (Section 2636 (b)). <br /> (E) Underground primary piping will meet aLl of the following requirements <br /> _V/ Primary piping in contact with hazardous substance under normal apgration conditions shall be: <br /> installed inside a secondary contairment system in the form of: ✓✓secondary pipe—vault or <br /> / _lined trench to be sloped to a collection sump at the low point of the piping. <br /> tJ Primary piping and secondary containment systems will be instatled in accordance with industry <br /> code of practice and voluntary consensus standards.. <br /> Lined trench used as secondary containment <br /> Material compatible with the substance stored. <br /> Covered and capable of supporting any expected vehicular traffic. <br /> (F) Underground/piping with secondary containment will be equipped and monitored as follows: <br /> Secondary containment will be equipped with a continuous monitoring system connected to an audible <br /> and visual alarm system. <br /> Automatic line leak detectors will be installed on pressurized piping <br /> Manufacturer: '✓ L 5 Model: (P? Ii A�>) <br /> Annual monitoring will be conducted on the pressurized piping with sec" any containment. <br /> ✓ Annual Line tightness test will not be required if the continuous monitor shuts down the pump and <br /> activates the alarm system when a release is detected and when the continuous monitoring system <br /> fails or is disconnected_ <br /> 20. State Water Resources Control Board "FaciLity (A)" and "Tank Permit (B)" application forms submitted. <br /> 21. Plan review and operating permit fees paid. <br /> 22. What is the approximate depth to ground water: <br /> i <br /> (include source of infcrmation - borehole logs, monitoring well date, water <br /> studies, etc.) <br /> I <br /> 23. Total number of tanks on site after installation: 1 <br /> 24. County/city fire District and Buitding Department notified. <br /> i <br /> 25, in the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br /> responsibility [in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br /> Requirements] as an owner or operator to submit a workplan to PHS-EHD Site Mitigation Unit prior to initiating any <br /> assessment or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br /> T�e� nen or opera r mu ackn ledge this resp" <br /> sibility//for workpLan submittal by signature an/dd,,7date below <br /> Nam\ K�v`C I- De'27 Tit4R_-1 /r.�CSCC�?�(rJ'-� Date <br /> CONDITIONS OF APPROVAL: <br />