My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 3:29:25 PM
Creation date
11/5/2018 9:26:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0518288
PE
2361
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\3250\PR0518288\BILLING 2013-2015.PDF
QuestysFileName
BILLING 2013-2015
QuestysRecordDate
7/5/2017 11:33:39 PM
QuestysRecordID
3483654
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> IMPORTANT PAPERS ENCLOSED <br /> For All Underground Fiberglass Reinforced Plastic (FRP) Tanks <br /> For Field Services, Contact CONTAINMENT SOLUTIONS SERVICES <br /> 800-822-1997 <br /> WARRANTY INFORMATION <br /> Please contact Containment Solutions at (800) 537-4730 or visit our website at www.containmentsolutions.com for a <br /> copy of your warranty. <br /> INSTALLATION INSTRUCTIONS <br /> These must be given to your installation contractor to read before he starts digging the hole. Incorrect installation may <br /> result in tank failure and potential environmental harm. The owner should consult with and follow all local and federal <br /> regulations before work commences. <br /> INSTALLATION CHECKLIST <br /> This checklist should be filled out by the contractor and endorsed by the owner's representative. A completed copy of <br /> the checklist should be retained by the owner. A complete checklist will be required by CONTAINMENT SOLUTIONS <br /> for any future warranty claims. This must be given to your installation contractor to read before he starts digging the <br /> hole. Incorrect installation may result in tank failure and potential environmental harm. <br /> DEADMAN ANCHOR INSTALLATION INSTRUCTIONS AND LAYOUT <br /> Carefully follow off loading instructions when installing CSI pre-fabricated deadman anchors. Make sure proper lifting <br /> equipment is used and all safely procedures are followed. Insure all lifting points are properly secured prior to <br /> offloading. Properly position deadman in excavation hole and follow tank installation instructions. <br /> CALIBRATION CHART <br /> Accurate inventory control is required by law. If manual gauging is to be used as the inventory method, this chart will <br /> provide information on how to properly measure the level of the petroleum and how to convert that measurement to <br /> gallons. <br /> BILL OF LADING <br /> Note any damage or shortages on the Bill of Lading and keep your copy. Any transit damage or shortage claim must <br /> be reported within 48 hours of delivery. Call 800-537-4730 day or night. If the tank has been damaged after delivery, <br /> call Containment Solutions Services 800-822-1997. <br /> 1 <br /> j IMPORTANT WARNING <br /> Ernproper Installation May Result In Tank Failure <br /> i <br /> Tank Installation Information(For installation questions, call Tank Technical Support(800)5374730). <br /> 1 . Bed and Backfill Material: Use either clean naturally rounded aggregate with a mix of particle sizes not less than <br /> 1/8"or more than 3/4"diameter or washed crushed stone or crushed gravel with angular particle size not less than <br /> j 1/8" or more than 1/2" diameter. Backfill must also meet ASTM C-33. No more than 5% of the backfill shall pass <br /> through a#8 sieve.The dry gravel density must be a minimum of 95 pcf, <br /> Caution:Do Not Use Sand or Dirt for BackfiN. <br /> 2 Bed: Provide a minimum 12" level backfill bed over hole bottom or concrete slab Caution Do Not Place Fiberglass <br /> Tanks Directly on Concrete Slab or Grout Tanks in Wet Concrete. Do Not Place Tanks on Concrete Slab. Timbers, <br /> Beams, Cradles, or Large Stones. <br /> 3. Backfilling: Work backfill material completely beneath tank bottom, between ribs and under end caps to provide <br /> necessary support for tank. <br /> 4. Anchoring: Tanks must be anchored where high water tables exist, surface water flows through hole, or other <br /> water conditions may exist now or in the future. <br /> 5. Filling Tanks: Do not fill tanks until backfill is to top of tank <br />
The URL can be used to link to this page
Your browser does not support the video tag.