My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 3:29:25 PM
Creation date
11/5/2018 9:26:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0518288
PE
2361
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\3250\PR0518288\BILLING 2013-2015.PDF
QuestysFileName
BILLING 2013-2015
QuestysRecordDate
7/5/2017 11:33:39 PM
QuestysRecordID
3483654
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l..dFIED PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN - PAGE 1RE ty) <br /> TYPE OF ACTION El1.NEW PLAN ® 2.CHANGE OF INFORMATION APR 2 ; R01 <br /> I. FACILITY INFORMATION <br /> FACILITY ID It (Agency Use Only) <br /> FACILITY NAME COSTCO WHOLESALE GAS STATION#658 SfRV)OEm. <br /> FACILITY SITE ADDRESS 3259 W GRANT LINE ROAD R03, CITY TRACY RP. <br /> H. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shutoff,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that it is <br /> non-hazardous. Used absorbent material, reusable or waste, will be stored in a properly labeled and sealed container. Waste material shall be disposed <br /> appropriately. <br /> ➢ Facility personnel will determine whether or not any water removed from secondary containment systems,or from clean-up activity,has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste. If the water has a petroleum sheen (i.e., rainbow colors), it is <br /> contaminated. A thick floating petroleum layer may not necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc. <br /> will not be disposed to storm water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/was[e,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,and supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ONSITE,BUT AVAILABLE FOR USE IF NEEDED: (Complete nly if applicable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> R10. R20. R30. <br /> RII. 1121. R31. <br /> R12, R22. R32, <br /> R13. R23. R33. <br /> R14. R24. R34. <br /> R15. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)ISIARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THLS RESPONSE PLAN: <br /> NAME Rao. TIME RSR. <br /> DENNIS BOCK COMPLIANCE MANAGER <br /> NAME R41. TITLE <br /> TIMHURLOCKER DIRECTOR OF COSTCO GASOLINE OPERATIONS <br /> NAME R42. ITTLE R52. <br /> COSTCO WAREHOUSE MANGER COSTCO WAREHOUSE MANGER <br /> NAME R43. TITLE 03. <br /> COSTCO GASOLINE STATION SUPERVISOR COSTCO GASOLINE STATION SUPERVISOR <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ❑Additional system testing or data collection ®Inspection by qualified persons ❑Recalibration of equipment ®Other(specify): <br /> R60. <br /> Site operator will contact a certified, trained pump and tank technician will be dispatched to the site to evaluate and <br /> repair alarm condition. <br /> Belshii'e Environmental Services,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.