Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54- <br /> e9-Sab <br /> ® <br /> I.CONTINUOUS ELECTRONIC MONITORING ❑2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS ❑99.OTHER(Specify): <br /> PANEL MANUFACTURER:VEEDER ROOT 49x55 MODEL#:TLS-350 49-36. <br /> LEAK SENSOR MANUFACTURER:VEEDER ROOT 49-57 MODEL#(s):794380-208 49-sa <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ® a.YES ❑b.NO 49-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ® a.YES ❑b.NO 49060. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑b.NO °90"bt <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ® a.YES ❑b.NO 49-62 <br /> 2.UDC CONSTRUCTION IS O L SINGLE-WALLED ❑2.DOUBLE-WALLED 49-63 <br /> IF DOUBLE WALLED: 49-6m <br /> UDC INTERSTITIAL SPACE S MONITORED BY: ❑1.LIQUID ❑2.PRESSURE ❑3 VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 49o-64b <br /> VII.PERIODIC SYSTEM TESTING <br /> Lj 1. ELD TESTING: THIS EACH= HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 49-65, <br /> LEAK DETECT[ N MUST BE PERFORMED. PERIODIC EL,D IS PERFORMED EVERY 36 MONTHS AS REQUIRED.(23 CCR_§2644.1) <br /> ®2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 49-66 <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. 89-67 <br /> VIIL RECORDKEEPING <br /> The following mormtoring/maintenmtce records are kept for this facility: <br /> ®Alarm logs 4s-sm ❑Visual Inspection Records 49-dsb ❑Tank integrity testing results 4WW <br /> ❑SIR testing results(and supporting documentation records). 49-68d ❑ Tank gauging results(and supporting documentation records). 49o-6ar <br /> ❑ATG Testing results(and supporting documentation records).49 mf ❑ Corrosion Protection 60-day logs 49-da1 <br /> ®Equipment maintenance and calibration records. 490-Uh <br /> IX.TRAINING <br /> ®Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties. 49 &a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)49 b <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)49-6x <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49-694 <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 4wo- <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION'49-d9r <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"49-691 <br /> ❑ OTHER(specify):moh.mms <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.49 7o <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.49-71 <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME DENNIS BOCK 490-72 TITLE COMPLIANCE MANAGER 49-73 <br /> NAME TIM IIURLOCKER TITLE DIRECTOR OF GASOLINE OPERATIONS <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE 49-76 DATE: 'J 49-77 <br /> P ENTIN [32.F clic Owner rami ® . <br /> APPLICANT NAME(print): 490-78 APPLICANT TITLE: 490-79 <br /> DENNIS BOCK COMPLIANCE MANAGER <br /> Belshire Environmental Services,Inc. <br />