Laserfiche WebLink
�NIF1ED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN P980201`2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD <br /> ® I.CONTINUOUS ELECTRONIC MONITORING ❑2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS ❑99.OTHER(Spcc )_ <br /> PANEL MANUFACTURER:V4eder Root(VR) 490.53 MODEL#:TLS-359R �fe. <br /> LEAK SENSOR MANUFACTURER:VR UDC Interior 49x31 MODEL O(S):794398.20! 4 0 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ® a.YES ❑b.NO 40'50 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ® a.YES ❑6.NO 140.60 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑It.NO 4oe1 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER ® a.YES ❑b.NO 4oe2 <br /> 2.UDCCONSMUCTIONIS ®LSINGLE-WALLED ❑2.DOUBLE-WALLED 40et <br /> IF DOUBLE WALLED: 49064. <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ L LIQUID ❑2.PRESSURE ❑3.VACUUM _ <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 49064h <br /> VII.PERIODIC SYSTEM TESTIJNG <br /> 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCE 49045. <br /> FAL DETPrTION( a n)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS!k (IJIRED.(23 CCR§2644.1) <br /> ®2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 40'66 <br /> 1.SPILL BUCKETS ARE TESTED ANNUALLY. aaoal <br /> Vim.RECORDKEEPING <br /> The following monitoring/maintenance records ate kept for this facility: <br /> ®Alum logs 4v0-69e ®Visual Inspection Records 49o-661, ❑Tank integrity testing results 4w-6m <br /> ❑SIR testing results(and supporting documentation records). 404ed ❑ Tank gauging results(and supporting documentation recardst. 4a6se <br /> ❑ <br /> ATG"resting results land supporting documentation records).4we6sn ❑ Corrosion Protection loot-Jay logs 4a6sa <br /> ®Equipment maintenance and calibration records. 490. h <br /> IX.TRAINING <br /> ®Penornel with UST monitoring responsibilities are familiar with all of the following documents relevant to dteirjob duties. 40694 <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all thin apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)4 % <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Requined14v0-ex <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 40a9d <br /> CALIFORNIA UNDERGROUND STORAGE TANK LAW 40-6% <br /> STATE WATER RESOURCES CONTROL BOARD (SWRCD) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION'4049r <br /> ❑ SWRCB PUBLICATION:-UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"4w.ra <br /> ❑ OTHER(SpecilYk w91 w9; <br /> Rg This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator'will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> mining will include,but is not limited to,the following: <br /> > Operation of the UST systems in a roomer conaistent with the fao:iliiy's beat management practices <br /> 'r The facility employee's role with regaN to the monitoring equipment as specified in this UST Monitoring Plan <br /> i The facility employee's mle with regard to spills and overfills as specified in the UST Res onvic Plan <br /> )o Names ofconuct personas)for emergencies and monitoring alarms.4valo <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments hem or indicate how many pages with additional information on specific monitoring procedures am smelted to this plan.40-71 <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner'Opcnator is responsible for en unng that: 1)the daily/murine UST monitoring activities and maintenance of UST loss detection equipment covered by <br /> this plan occurs'.2)all conditions that indicate a possible release an investigated.and 3)all monitoring records arc maintained properly. <br /> The following person(s)are respoasible for performing the monitoring and equipment maintenance <br /> NAME ~2 TITLE 44 73 <br /> NAME 49a14 TITLE 490-75 <br /> The Designated Operator shall perfinm a monthly visual inspection of the facility, provide a report to the owner/operator,and inform the ownteNoperatm of any <br /> conditions that need follow-up action. <br /> XII.OWNEWOPERATOR SIGNATURE <br /> CERTIFICATION:1 certify that the information provided herein is true and accurate to the best ofmy knowledge. <br /> APPLICANT SKiNATU wa76 DATE: 40-n <br /> Feb.5,2010 <br /> 4 <br /> APPLCANT NAME(prim): APPLICANT TITLE: <br /> s <br /> Bock Compliance Manager <br /> UPCF UST-D(1212007)3/4 <br />