My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 3:29:25 PM
Creation date
11/5/2018 9:26:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0518288
PE
2361
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\3250\PR0518288\BILLING 2013-2015.PDF
QuestysFileName
BILLING 2013-2015
QuestysRecordDate
7/5/2017 11:33:39 PM
QuestysRecordID
3483654
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�SY <br /> UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN -PAGE 1 (Ore foto,per facility) <br /> TYPE OF ACTION Q 1.NEW PLAN ® 2.CHANGE OF INFORMATION PcL. <br /> I. FACILITY INFORMATION <br /> FACILITY ID a (Agency Use Onty) <br /> BUSINESS NAME(Same as FACILITY NAME) Rau. <br /> Costco Wholesale Gas Station#858 <br /> BUSINESS SITE ADDRESS Rm. CITY Rea. <br /> 3250 W.Grantline Road Tracy <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the ftcility's Hazardous Materials <br /> Business Plan. <br /> > If safe to do so,facility parem mel wi.l take immediate measures ro control or stop any release(e.g.,activate pump shut-of,ec,)and,if necessary,safely remove <br /> remaining hazardous m erlal from the UST system. <br /> > Any release to secondary containment will be pumped or otherwise removed within a time conaistlen with the ability of the secondary carrammett system to <br /> contain the hazardous material,but nor greater than 70 calendar days,or sooner if required by the Intal agency. Recovered hazardous materials,unless still suitable <br /> For their intended use,will be managed as hazardous waste. <br /> > Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which ham belnmet mo saturated to be <br /> effective or which is no longer intended for use will be managed ea hazardous waste unless a waste determination in accordance with 22 CCR 966262.11 finds that <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be armed in a property labeled and sealed contains. Waite material shall be disposed <br /> eppropnately. <br /> > Facility personnel will determine whether any water removed from secondary containment systemj6 or from clean-up activity,has Men in contact with any <br /> hazardous material.If the water is contaminated,it will be managed as hazardous waste unless a waste deterrrmation in eccoadahce with 22 CCR 966262.11 fiches <br /> that it is non-hszardoms. If the water has a peroleum shorn(i.o.,rainbow colors),it is ocnnminated. A thick Floating petroleum layer my ret necessarily display <br /> rainbow colors. Water(hazardous or non-hazardous)Gam sumps,spill containers,arc.will not be disposed to storm water systems. <br /> > We will review secondary contaimrart systema for possible deterioration if any of the following conditions occur: <br /> I. Hazardous material in mnmet with secondary containment is nor compatible with the material used for secondary commitment; <br /> 2. Secondary containment is prone to damage firm any equipment used to remove or clean up hazarlous material collected in secondary containment: <br /> 3. Hazardous materiel,other than the product/wa le stowed to the primary comaianent system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or teniting materiel from such a combination is not cornpuibie with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill cannot and clean-up equipment kept pennarently on-site is liseed In the fatality's Hazardous Materials Business Plan. Tina <br /> equipment is inspected me kart roughly,and after each use,supplies am replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE.BUT AVAILABLE FOR USE IF NEEDED: (Complete nly if applicable) <br /> EQUIPMLNT LOCATION AVAILABILITY <br /> Absorbents R10 Controller Enclosure R30. 50-lbs absorbent bag Rte. <br /> Ri 1. Rll. "I. <br /> RIS, R12. R31. <br /> RU, R13. R11. <br /> M4. Rel. Rha. <br /> 1111, Ria Rat. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME . TITLE as. <br /> Tlm Hurlocker Costco Wholesale Director of Gasoline Operation <br /> NAME Ral, TT'PLE RSI. <br /> Dwight Larsen Costco Wholesale Operations Manager <br /> NAME Ra. TITLE eft. <br /> Omnia Bock Costco Wholesale Compliance Manager <br /> NAME RU. TITLE PR <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ❑Additional ryatam aging or dao coilmtion ®Inspection by qualified peranns ❑Recalibration of equipment <br /> Other <br /> An authorized service technician w01 be dispatched to the location to verify the alarm condition.The technician wJ:i verify the Rha. <br /> monitoring system Is operating correctly,verify the alarm at the location noted by the monitoring system,and then supervise <br /> the correction of the condition. <br /> I <br /> UST Response Plan(3/2009)-IA BCE$10050 <br />
The URL can be used to link to this page
Your browser does not support the video tag.