Laserfiche WebLink
- .KXIED PROGRAM CONSOLIDATED FORM ,w <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Piga 2 of 2) <br /> VI.UNDER DWEIMI .00NTAIIY�ENT(UDC MUN'ITORING <br /> I. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 49014a <br /> a90•s4b <br /> 0 1.CONTINUOUS ELECTRONIC MONITORING 112.FLOAT AND CHAIN ASSEMBLY ❑ 3.F_LFC~IRONIC STAND-ALONE <br /> 4,NO DISPENSERS ❑99.OTHER(Spa:i£y). <br /> PANEL MANUFACTURER:Veeder Root(VR) a9ass MODEL#:171,43-359R_ <br /> LEAK SENSOR MANUFACTURER:VR UDC interior V— 490-s7 MODEL#(S):7l43M209 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ® a YES ❑b.NO 494-b9 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN a.YES ❑b.NO 490-d0. <br /> FAILURE I DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ©b.NO "o-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER <br /> ® a.YES ❑b.NO 490-62 <br /> 2.UDC CONSTRUCTION IS ®1.SINGLE-WALLED ❑2.DOUBLE-WALLED 4 r <br /> IF DOUBL19 WALLED: ago est: <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑1.LIQUID ❑2.PRESSURE ❑3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑L YES ❑b.NO moo a+a <br /> VII:PERIODIC SYSTEM TESTING <br /> l;ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCEp 490-65- <br /> --I"DEF ,IQN j910 MUST BE PERFORMED. PERIODIC EM IS PERFORMED EVERY 36 MONTHS AS RE UIRED.(23 CCR J2644.1 <br /> ®2,SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66 <br /> 9-SPILL BUCKETS ARE TESTED ANNUALLY. -- ----__.... ___ .__-------_-- 49"1 <br /> VIIL'"CO"KEEPING <br /> Tbe fbilowing a lonitotinQ/nsairdensinee records are kept for this facility; <br /> S Alarm logs 49D."a C9 Visual Inspection Records 4W63b ❑Tank integrity testing results 490=6& <br /> ❑SIR tasting results(and supporting documentation records). 44U&d ❑ Tank gauging results(and supporting documentation records). 44a69e <br /> ❑ATG Testing results(and supporting documentation records).49o-of ❑ Corrosion Protection W-day logs 49o•3sg <br /> Equipment maintenance and calibration records. 49o•68b <br /> UL TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the Following documents relevant to their job duties, 490-690 <br /> REFERENCE DOCUMENTS MAINTAINED AT FACIEITY(Check all that apply) <br /> THIS UNDERGROUND STORAGE TAMC MONMORINOr PLAN(Required)4910 agb <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-49c <br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 4wod <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69. <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-W <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-ft <br /> ❑ OTHER(Specify):w9n.w9i <br /> This facility has a"Designated UST Operator"who has passed the Califomis UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employem in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not luted to,the following: <br /> > Operation of the UST systems in a maturer consistent with the facility's bast management practices <br /> i The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> i The:facility eanployee's role with regard to spills and overfills as specified in the UST Response Plant <br /> Names of oou=t person(s)for emergencies and monitoring alarms,490-70 <br /> X COMMENTSADDIMONAL INFORMATION <br /> Provide additional commews here or indicate how marry pages with additional information on specille monitorin procedures aro attached to this plan.ago-ri <br /> XL PERSONNEL RESPONSIBILITIES <br /> The UST Owner./Operator is responsible for ensuring that:1)the daily/routine UST trronitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are invtstigated,and 3)all monitoring records aro maintained pTvperly. <br /> The following persou(s)are responsible for performing the monitoring and equipment a®interu mcc, <br /> NAME 490.72 TITLE 490-73 <br /> NAME 49a74 TITLE 440-71 <br /> The Designated Operator shall perfonm a monthly visual inspection of the facility,provide a report to the owner/operittor.and inform the owneriopenator of any <br /> conditions that need follow-up action. <br /> XII.O'WNERIOPERATOR SIGNATURE <br /> CERTIFICATION:I certify_ that the information provided herein is true and accurate to the best of my know]edge. <br /> APPLICANT SIGNA 490.76 DATE: / 496,77 <br /> ago 71 <br /> APPLICANT NAME(print): APPLICANT TITLE: 496-79 <br /> Dennis Bock Compliance Manager <br /> UPCF UST-D(12/2007)3/4 <br />