My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1987
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
502
>
2300 - Underground Storage Tank Program
>
PR0503960
>
REMOVAL_1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 11:29:42 AM
Creation date
11/5/2018 9:31:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1987
RECORD_ID
PR0503960
PE
2381
FACILITY_ID
FA0006033
FACILITY_NAME
PG&E: Tracy Service Center
STREET_NUMBER
502
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
250-020-05
CURRENT_STATUS
02
SITE_LOCATION
502 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\502\PR0503960\REMOVAL 1987.PDF
QuestysFileName
REMOVAL 1987
QuestysRecordDate
5/7/2013 8:00:00 AM
QuestysRecordID
155936
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
oz <br /> UNDERGROUND STORAGE TANK CLOSURE PLAN <br /> FOR ENVFERM�BSER GESTH <br /> PACIFIC GAS AND ELECTRIC COMPANY ' S <br /> TRACY SERVICE CENTER <br /> 1 . Location : Tracy Service Center , 502 East Grantline Road , <br /> Tracy, California. <br /> 2 . Physical Description : One 2 , 000 gallon , single wall steel <br /> tank, with associated piping . 4 <br /> 3. Contents : None . Previously contained unleaded gasoline . <br /> 4. Contractor : <br /> 5. Soil Sampling : The soil sampling and testing will be <br /> performed by The Twining Laboratories , Inc . <br /> 6 . Notification : The San Joaquin Local Health District will be <br /> notified at least 48 hours prior to tank removal and soil <br /> sampling. <br /> 7 . Procedures : Before excavation begins , any residual sludge or <br /> free liquid will be removed from the tank . Clean excavated <br /> material will be stockpiled on-site for use in backfilling <br /> the excavation. The tank and piping will then be uncovered <br /> with a backhoe . The piping will be removed and stockpiled <br /> for off-site disposal . <br /> The Tank will be decontaminated by triple rinsing . All <br /> rinsate , remaining oil , product , sludge , etc . , will be hauled <br /> to a Class I Disposal Facility by a licensed hazardous waste <br /> hauler or recycled in accordance with PG &E and The San <br /> Joaquin Local Health District . <br /> Flammable vapors will be purged by introducing 1 . 5 pounds of <br /> dry ice into tank per 100 gallons of tank capacity and <br /> sealing all openings , except the vent port , at least one hour <br /> before tank removal . Following removal , the decontaminated <br /> tank will be cut up into several pieces and disposed of as <br /> scrap . <br /> Any obviously contaminated soil will be excavated and <br /> stockpiled for off-site disposal . Soil samples will then be <br />
The URL can be used to link to this page
Your browser does not support the video tag.