My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FAIRMONT
>
1230
>
2300 - Underground Storage Tank Program
>
PR0502430
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:53:55 PM
Creation date
11/5/2018 9:36:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0502430
PE
2381
FACILITY_ID
FA0009764
FACILITY_NAME
ADM-DBA Golden Peanut & Tree Nuts Lodi
STREET_NUMBER
1230
Direction
S
STREET_NAME
FAIRMONT
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03107014
CURRENT_STATUS
02
SITE_LOCATION
1230 S FAIRMONT AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FAIRMONT\1230\PR0502430\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
4/29/2013 8:00:00 AM
QuestysRecordID
147874
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD <br /> FORM 'B': UNDERGROUND STORAGE TANK PROGRAM ° <br /> TANK TANK PERMIT APPLICATION INFORMATION <br /> ,,..ry �o <br /> COMPLETE A SEPARATE FORM WITH THE FOLLOWING INFORMATION FOR EACH TANK. Z <br /> MARK ONLY ❑ ❑ ❑5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED TANK I C' <br /> 1 NEW PERMIT 3 RENEWAL PERMIT <br /> ONE ITEM ❑2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE 8 TANK REMOVED <br /> FACILITY/SITE NAME WHERE TANK IS INSTALLED: Q � FARM TANK-YES❑ NO® ,� <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-IF UNKNOWN-SO SPECIFY <br /> A. OWNERS TANK ID A B. MANUFACTURED BY: k� <br /> O YEAR INSTALLED 'r!•/,c D. TANK CAPACITY IN GALLONS. ( 0 <br /> II. TANK CONTENTS IF(A.1),IS MARKED,COMPLETE ITEM C.IF(A.1),IS NOT MARKED,COMPLETE ITEM D. <br /> A_ MOTOR VEHICLE FUEL ❑ 2 PETROLEUM B. C. ❑ 1 UNLEADED ❑ 2 LEADED IESEL <br /> ❑ 3 CHEMICAL PRODUCT ❑ 4 OIL 1 PRODUCT ❑4 GASAHOL ❑ 5 JET FUEL ❑6 AVIATION GAS <br /> ❑5 HAZARDOUS ❑ 80 EMPTY ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 7 METHANOL ❑99 OTHER(DESCRIBE IN ITEM D,BELOW) <br /> D. IF NOT MOTOR VEHICLE FUEL,ENTER NAME OF <br /> HAZARDOUS SUBSTANCE STORED&C.A.S.R C.A.S.R: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOX A,B,C,A D <br /> A.TYPE OF ❑ I DOUBLEWALLED ❑ 3 SINGLE WALLED WITH EXTERIOR UNER UNKNOWN <br /> SYSTEM ❑2 BNGLEWALUD ❑4 SECONDARY CONTAINMENT M-99 OTHER <br /> b( I STEEUIRON ❑2 STAINLESS STEEL ❑ 3 FIBERGLASS E]4 STEEL CND W/RBERGLSS REINFORCED PLASTIC <br /> B.TANK ❑ <br /> MATERIAL 5 CONCRETE ❑6 POLYVINYLCHLORIDE ❑ 7 ALUMINUM ❑8100%METHANOL COMPATIBLE FRP <br /> ❑9 BRONZE ❑ 10 GALVANIZED STEEL ❑95 UNKNOWN ❑99 OTHER <br /> ❑ <br /> C. INTERIOR 1 RUBBER LINED 2 ALKYD LINING F-13 EPDXY LINING ❑ 4 PHENOLICUNING <br /> LINING ❑5 GLASS LINING NLINED Ui i UNKNOWN <br /> ❑ISUNING MATERIAL COMPAPBLEWfTH 100%METHANOL? ❑YES ❑NO �99 OTHER— VYVw <br /> D.CORROSION ❑ 1 POLYETHLENE WRAP (egoTAR OR ASPHALT ❑3VINYL WRAP ❑4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑91 NONE ❑ 95 UNKNOWN ❑99 OTHER <br /> IV. PIPING INFORMATION CIRCLE A IF ABOVE GROUND, U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A SYSTEM TYPE AD SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 91 NONE A5 UNKNOWN A U 99 OTHER <br /> B.CONSTRUCTION A U 1 SINGLE WALLED A U 2 DOUBLE WALLED A U 3 LINED TRENCH A U 91 NONE U UNKNOWN A U 98 OTHER <br /> A U 1 STEEL/IRON A U 2 STAINLESSSTEEL A U 3 POLYVINYL CHLORIDE(PVC) A U 4 FIBERGLASS PIPE A U 91 NONE <br /> C. MATERIAL A U 5 ALUMINUM A�6 CONCRETE A U 7 STEEL CLAD W/FRP A U 8 10096 METHANOL COMPATIBLE FRP <br /> A U 9 GALVANIZED STEEL A 95 UNKNOWN A U 99 OTHER <br /> V. LEAK DETECTION SYSTEM CIRCLE P FOR PRIMARY,OR S FOR SECONDARY,A PRIMARY LEAK DETECTION SYSTEM MUST BE CIRCLED. <br /> P 5 1 VISUAL CHECK P S 2 INVENTORY RECONCILIATION 8 3 VADOSE WELLS P S 4 ELECTRONIC MONITOR P 8 5 GROUND WATER MONITORING WELLS <br /> P 8 6 PRECISION TESTING P S 7 PRESSURE TESTING P 91 NONE P S 95 UNKNOWN P 8 99 OTHER <br /> VI. INFORMATION ON TANK PERMANENTLY CLOSED IN PLACE <br /> 1. ESTIMATED DATE LAST USED(MO/YR) 2. ESTIMATED QUANTITY OF 3. WAS TANK FILLED WITH <br /> SUBSTANCE REMAINING IN GALLONS INERT MATERIAL? ❑YES ❑ NO <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT. <br /> APPLICANT'S NAME(PRINTED&SIGNATURE) DATE <br /> LOCAL AGENCY USE ONLY <br /> COUNTY k JURISDICTION# AGENCY u FACILITY ID R TANK ID A <br /> ol 0 142d9l I l(01010111 <br /> CURRENT LOCAL EDBYNA E PHONE a WITH AREA CODE <br /> LO IGEAR <br /> 11 PERMIT NUMBER PERMIT APPROVAL DATE FIERMIt EXPIRATION DATE <br /> CHECKN PERMIT AMOUNT SURCHARGE AMT. FEE CODE RECEIPT BY: <br /> FORM 8(6-29-66) THIS FORM MUST BE ACCOMPANIED BY A FACILITY/SITE APPLICATION, FORM 'A',UNLES URRENT FORMA' HAS BEEN FILED / <br />
The URL can be used to link to this page
Your browser does not support the video tag.