Laserfiche WebLink
S. a. Describe the method that will be utilized to purge and/or inert the tank(s): <br /> b. Tank/Piping Hauler: <br /> Name N/A <br /> Address CityZip <br /> Phone No.( ) <br /> Hauler Registration # (if hauled as hazardous) <br /> C. Tank/Piping Disposal Site: <br /> Name N/A <br /> Address CityZip <br /> Phone No.( ) <br /> EPA ID# (if transported to a permitted TSD facility) <br /> 9. Describe, in detail, how the soil and/or water sample(s) beneath the tank and piping will be obtained: <br /> DIG SLIT TRENCH WHERE TANK WAS & SAMPLE @ REQUIRED DEPTH <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> SAME MATERIAL AS REMOVED <br /> 11. Handling of excavated soil: <br /> a) What material will be used to line the tank pit and cover the stockpile? <br /> EXISTING <br /> b) What will be the final destination of the excavated stockpile? <br /> RACK IN HOLE <br /> c) Contaminated Soil Hazardous Waste Hauler. <br /> Name N/A Hauler Registration # <br /> Address CityZip <br /> Phone No. ( ) "' <br /> EH 23 046 (Revised 9/11/96) Page 5 <br />