My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FIFTH
>
201
>
2300 - Underground Storage Tank Program
>
PR0501231
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:34:57 AM
Creation date
11/5/2018 9:39:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0501231
PE
2381
FACILITY_ID
FA0005031
FACILITY_NAME
DE BOER TRUCK LINES INC
STREET_NUMBER
201
Direction
W
STREET_NAME
FIFTH
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
25935013
CURRENT_STATUS
02
SITE_LOCATION
201 W FIFTH ST
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FIFTH\201\PR0501231\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
4/29/2013 8:00:00 AM
QuestysRecordID
151323
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o . <br /> STATE OF CALIFORNIA ,. ` <br /> STATE WATER RESOURCES CONTROL BOARD S <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B �� :s <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM �""°" <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION ❑ 7 PER=CLSEDONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ e TAN <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: '(.._U \ + <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A, OWNER'S TANK I.D.# ?_1 I B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAYNEAR) G D. TANK CAPACITY IN GALLONS: Ll� <br /> IL TANK CO IFA-1 IS MARKED,COMPLETE ITEM C. G <br /> A. 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. O ❑ 1aUN EADED 3 DIESEL ❑ 6 AVIATIONGAS <br /> ❑ 4 GASAHOL <br /> ❑ 2 PETROLEUM ❑ 80 EMPTY / PRODUCT ❑ 1bUNLEAIDED ❑ 5 JET FUEL ❑ T METHANOL <br /> ❑ 3 CHEMICAL PRODUCT ❑ 85 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ 99 OTHER (DESCRIBE IN REM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.a: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B,AND C,AND ALL THAT APPLIES IN BOX O AND <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEMSINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTEDTANK) ❑ 99 OTHER <br /> B. TANK1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (PrimaryTank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ i RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR O 5 GLASS LINING ❑ 6 UNLINED UNKNOWN ❑ 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100%METHANOL? YES— NO— <br /> DE CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION 1 NONE ❑95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND.BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A(Q SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND AVSAFE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 9 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 3 INTERSTITIAL <br /> MONITORING ❑99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUNDWATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAY(YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH <br /> ( _ cl1 Z— SUBSTANCE REMAINING GALLONS INERTMATERIAL7 YES ❑ NO <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE HEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED 4 SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# oF��Zo <br /> STATE I.D.# (� 7It 14 1 b o -- <br /> PERMITNUMBER PERMIT APPROVEDBY/DATE PERMIT EXPIRATION DATE 3-GZ <br /> FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEENEN F <br /> FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.