My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FILBERT
>
740
>
2300 - Underground Storage Tank Program
>
PR0505111
>
REMOVAL_1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2021 11:29:39 AM
Creation date
11/5/2018 9:41:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1994
RECORD_ID
PR0505111
PE
2381
FACILITY_ID
FA0006546
FACILITY_NAME
FILBERT PROPERTIES
STREET_NUMBER
740
Direction
N
STREET_NAME
FILBERT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
740 N FILBERT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FILBERT\740\PR0505111\REMOVAL 1994.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. a. Describe the method flint will be utilized to purge and/or Inert lite lank(s)1 <br /> Taldi is atnl Ilhi- Is) W lI Iincl Iva I .,i 1A a rinS�,.�l f parR� xkt Next Lbe <br /> appropriate "IDouwt of dry ice ( li lbs. per 1 000 gal cap. diesel and 30 lbs. <br /> gasoline) will be added to Lite Lank(s) and then monitored with an LGL mleLer. <br /> Is. Terik/Plping Haulers <br /> Name Jim 'Thorpe Oil , Inc. <br /> Address 351 N. Beclanan Rd./ P.O. [lox 35/Clty Lodi, CA Zip 95241-0357 <br /> Phone No.( 209 ) 462-4501 <br /> Hauler Registration # (If hauled as hazardous) 2667 <br /> C. Tonk/Plping Disposal Site: <br /> Name Schnitzer Steel Products <br /> Address 12000 Iolsom Blvd. CltyRancho Cordova Zlp 95742 <br /> Phone No.( 916 ) 985-48 10 <br /> EPA ID# (if transported to a permll(ed '1'SD facility) <br /> 9. Describe, In delall, how lite soil and/or water sample(s) beneath Ilse lank and piping will be obtabreds <br /> After tank removal we will excavate 2 to 3 feet under the former Lanit location <br /> Into naLive soil at Lite appropriaLe locations with Like backhoe at Lite direction <br /> of Lite EIID Rep• on siLe.Salnples will be Laken frau Lite backhoe buckeL. <br /> 10. Describe how the excavation will be backfilled with suitable material upon removals <br /> Backfill of Lite excavaLion will be compleLed at Lite appropriate time during this project <br /> A detetio1nation of Lite most cost effective method will be made and undertaken. Pill <br /> material will be what is Lite n:osL cost effective for Lite final desired corldilloil. <br /> IL Dandling of excavated soils <br /> a) What material will be used to Iliac the lank pit said cover Ilse stockpile? <br /> 6 Mil plastic sheeting. <br /> b) What will be the final destination of the excavoled slockplle? <br /> A deLel•nlineatiou will be made at Lite appropriaLe Lime. <br /> c) Contaminated Soil Ilarardous Waste Ilaulen <br /> Name Dillard Trucking hauler Registration # 1715 <br /> Address 3291 Beyers Rd./RL. 1 RX. 73 CI(? Byron, Ca Zip 94514 <br /> Phone No. ( 415 ) 634-6650 <br /> Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.