Laserfiche WebLink
14. L s- 9 Co7 F-7 <br /> - ///6 f j'rsT St Sfe aEfe� c <br /> Na a of Sol Owner or V.I., Address No.and Snood s) Cary State Data of Test <br /> Z 15. TANK TO TEST 16. CAPACITY From <br /> Station Chart <br /> C, ca most accurate <br /> m O Nominal Capacity SU ca sett chart available 6 Tank Manufacturer's Chart <br /> rn IdentltY DY Position Gallons p y Gallons I <br /> Company Engineering Data <br /> �e-1 j 1- AL Is there doubt as to True Capacity? 11 <br /> _J <br /> J Chans supplied with PPfro T114a <br /> I� Brand and Grade See Section"DETERMINING TANK CAPACITY' i� Other <br /> 17. FILL-UP FOR TEST Stick Headings Total Gallons <br /> to K in. Gallons ea.Heading <br /> Stick Water Bottom ¢ <br /> before Fil6up _6 Inventory <br /> to%M. _-Gallons <br /> a— <br /> up.STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY J <br /> to <br /> Tn 0 Tank Diameter <br /> W o k y, Product in full tank(up to fill pipe) _ -S E+6 <br /> 0. <br /> o G)0 0 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK 3 3 • VAPOR RECOVERY SYSTEM <br /> A'I n I O <br /> 1 O 0 D See manual sections applicable.Check below and record procedure in log(26). 6s Stage I <br /> a.Zyo 33. 3 E] g <br /> 3 D 0 - ❑ Water in tank E] High water table in tank excavation E] Llne(s)being tested with LVLLT ElStage II <br /> � <br /> 0 <br /> m <br /> 0 21. TEMPERATURENOLUME FACTOR (a)TO TEST THIS TANK <br /> 19. TANK MEASUREMENTS FOR <br /> N IS Today Warmer?i 1 Colder?I I—°F Product in Tank—'F Fill-up Product on Truck_"F Expected Change( + or <br /> 1. TSTT ASSEMBLY ) <br /> Car Bottom of tank to Gradee 7 3 <br /> m .._................ , / 7 2 6A' <br /> 22. Thermal-Sensor reading after circulation <br /> Add 30"dor{"L ................. D ' <br /> — digits Nearest <br /> Add 24"for 3"L or air seal ....... 23. Digits per"F in range of expected Change <br /> Total tubing to assemble Approximate ........ digns <br /> 20. EXTENSION HOSE SETTING 24. 566 X o o o I/ <o 8.S — , z SS / S( // gallons <br /> �,/ total quantity in coefficient of expansion for volume change in this tank <br /> Tank top to grade'.....tube <br /> 6....more ............. � // " full tank(16 car 17) involved product per"F <br /> Extend hose on suction tube 6"or more '� [ <br /> below tank top _................................... �7" 25. e S S� rQ �� _ ) / 7 — n D D <br /> > 9 9%5< This is <br /> 'If Fill pipe extends above grade,use top of fill. volume charge per-F(24) Digits per'F in test Volume change par digit. test <br /> Range(23) Compute to 4 decimal places. factor(a) <br /> 26. 30. HYDROSTATIC 31. 34. 38.NET VOLUME 39. <br /> LOG OF TEST PROCEDURES PRESSURE11 VOLUME MEASUREMENTS(ID TEMPERATURE COMPENSATION CHANGES ACCUMULATED <br /> CONTROL RECORD TO.WI SAL. USE FACTOR(a) EACH READING CHANGE <br /> 27. 28. 29. Standpipe Levsl 32. Product in 35. 36. 37. Tdri,amtuu a High Lod record <br /> AIDE Record details of Setting UP Reain Inches Graduate Product Chane Com utation Adjustment <br /> Replaced I-) g P I To1N EM oaMCBm <br /> and running test(Use full Ne. Thermal Higher+ (c) (a)= ypWme Minus <br /> Be tonin to" to Lower- h <br /> NYE length of line if needed.) R R Sensor pension+ Expansion(+)or At Loa Level compute <br /> of wAid Brian pher boded Reading (<I Contndion - Contraction(-.) Charye per Naur <br /> (24 it.) Reading Resuwad Reding Reding Recovered(+) Sy e3RV)—P321T) (NFM usam) <br /> f) 00 < A I I PS , I <br />