Laserfiche WebLink
1 1 2 1 3 1 4 18 81 7 1 8 1 9 1 10 1 fl 1 12 1 13 14 15 16 1 17 1 18 <br /> E UIPNIENTLIST 7122/99 SPECIFICATIONS SPECIFICATIONS <br /> ITEM QTY NIANP. DESCRIPTION stns INS'r <br /> _ BY -__ _- -__ _- ----- <br /> I <br /> -_ __ <br /> 2.1 PRODUCT, VENT & VAPOR RECOVERY PIPING --- _"--- -- <br /> 1 ! %ER.XES TANK GA LEON DOUBLE IVALI.UG 0 O A. PIPING: 1.3 EXCAVATION AND BACKFILL <br /> TANK W/FITTINGSPERDRAWINO 1. Steel e: Galvanized Or Black Iron <br /> 2 1 XERXES 15,00 GALLON DOUBLE WALL UG pipe: ( ) A. EXCAVATION: It unexpected water condition or rock is encountered, immediately contact the 2. Secondary e <br /> M Schedule 40 (ASTM A-120) Steel Pipe Owner for instructions before roceedin with the excavation. y ( xternol) Tank Test: M <br /> TANK\HFI ITINGS PER DILL\VINO _ proceeding Maintain the r g <br /> 250# Railroad Unions S. TANK HOLE SIZE W STABLE tall: Size and end c perimeter to allow 36" minimum between tonka pressure in the primary tank. Free the hose from the service fitting by cutting Vic <br /> 3 I %F.RXES 1.500 GALLON DOUBLE\VALE UG P <br /> 15IN Malleable Iran Fittings and 24" minimum between tank sides and end caps and the wall of the took hole. nylon Ue. Insert the hose Into the Quick Disconnect check valve (found k. the top at the service <br /> _ TANK\V/FII-IINGSPERD ids Recti p lifting). Ti will allow air to transfer from the primer to secondary t <br /> B. HANDLING OF PIPE & FITTINGS: G. TANK HOLE SIZE IN UNSTABLE SOIL y y one. Pressurize to 5 PSIG, <br /> 4 7 XER%ES 4H"xSTSumv"'t Friaion Elt Lid�Rcducu Add or ramous air via the supply valve as needed and allow the pressure to stabilize. Close <br /> All piping installations shall conform to ping manufacturers specifications and installation guidelines. 1. Unstable soil is compression <br /> as haven less than 750 lbs./sq.e ft. cohesion, as calculated from,5 an P <br /> 5 7 XF.R.XES 72"a5J"Sum w;R9duc9r Rin g the valve on the test manifold. Disconnect the air supply I' <br /> 6 20 ENVIRON Flexible en boot-SIS"FEB-3075 1. Fiberglass pipe: Protect against abrasion from sharp or hard objects; impact damage from unconfined compression test, or sails with an ultimata hearing capacity of less than 3,500 cPY me. Monitor the pressure for one hour. <br /> improper storage, transporting, laying or backfilling: Inspect all pipe for damage prior to using lbs./sq.ft Loose sand, muck, bog, peat, swam or landfill where sail is soft ore generallyScop the entire exterior of the tank and watch for air bubbles which indicate leak. <br /> _ 7 I ENVIRON Flexible cm boot-I"GE B-3100 p valve, the air supply line already should have been disconnected. When the air tow from <br /> m the supply <br /> 8 3 ENVIRON Flexibis cos boA2""FEB-6200 it the piping system. considered excavation <br /> unstable sotto. valve stops, remove the test manifold. <br /> 9 n ENVIRON Fic.x,blc am bort!"FEt3-6300 2. Steel pipe and fittings: Protect against damage to the protective coafmg/wrapping. 2. Size excavation perimeter to allow 36' minimum between tanks and a minimum of holt the tank p y pressure from the tank h opening�_ When the teat Is complete, careful) release the air <br /> 10 3 ENVIRON Flcuble cot bcot)" FEB-72' 2.2 INSTALLATION REQUIREMENTS; diameter between the tank sidesaend caps and the wall of the tank hole. y p g the supply <br /> 3. Filter fabric will be used to line tank hole for FRP tanks in unstable soil. H. POST-INSTALLATION PRESSURE TEST, AIR: <br /> F14 <br /> 6 WEAVER Reducer boa./av valve l"x2"AR3x2-,\ A. LAYING OF PIPE: 1. Primary (Inner) Tank Test: Perform this test with all tank risers and fittings attached. Tighten all <br /> I WEAVER RNueer Was"n2_ARl.2 1. Interior surface of all a and fittin s must be free from dirt, stole, metol, fiber lase articles, 4, Permanent shoring may be used to stabilize the walla , f the tank htlle, at thesiz d riteri on of thep.p 9 9 P Rateroto " and/or Q lack li permanent shoring Is used, follow "Stable Sail" size criteria. tank fillings. ter) f a pressure gauged one of the annular space monitor re regi in the <br /> 6 WEAVER RNucerboaw/air val.c4"x]"ARix3-A _ etc., before connecting. Refer to Alternate Backfill Moterlol9', below. secondary (outer) tank. Locate o second Pressure gauge with a s psi pressure relief, to one sof <br /> uL 6 IVEAVER Rcduar bout+"x3" ,\Rix3 2. Do not support piping with foreign objects, such as snaps of wood, pipe, etc. Use Owner approved 0. DEPTH OF TANK HOLE: the primpry inner tank fillings and connect the air pressure hose to this same tittnq. Pressurize L <br /> 2 HOSESTASTER FicxcourcourY,30".M,M FSN1M-7-30 piping support the primary iinneq tank to a minimum of 4 psi maximum 52 HOSEN1ASTER Flexcamactorl" Femzieumonx 1. Contractor ie responsible far establishing lha tank hole depth, conssloping the length of piping ( psh Soap all tank sure in and <br /> B. C. CNG OF PIPE: runs, to the pump blocks and vent risers, pipe burial depth, yard slope and the foliowinq criteria: monitor the pressure gouge for a minimum of 1/2 hour. Thera should hip nv pressure increase in <br /> Female union FSUU-I-IH 1. Cut pip& to ensure o squpre cu! end. Cut pipe end must be within 1/8' of square. ' the secondary( u (outer) tank. <br /> 7 TITEFLEX Fkx cotmtttor 2"x l2"F.aM seivet (Measure he the Remove Pump opening). <br /> 111!30-32-0120 C. TAPERING & REAMING: a. FRP: The minimum depth of ewer is 3'-0' and the maximum is T-0". 2. Secondary (outer) Tank Test: Disconnect the air supplyle but maintain the pressure ne the primary <br /> i. Fiberglass da all cut ends mugt be s tapered per pipe mo smooth, <br /> clean, Protect pipe during tapering 2. Minimum 5' depth of cover is required for buoyancy. tank. Pressurize the secondary (outer) took using a Flexible air hose manifold. Connect a pressure <br /> 18 6 TITEFLEX flea connector I-i/2"Q+"FxN1 snsivel P C <br /> _ _I W30.2J-02+0 de prevent damage to pipe. The finish taper shelf be smooth, dean, and Gee from Outface hose from the primary y to to the annular space monitor fitting. <br /> defects. The length o! toper for 2' diameter pipe is 1 5/B" and for 3" diameter pipe I. I J/4". For E. SAFETY REQUIREMENT: Pressurize the secondary tank by opening the manifold valve between the <br /> i9 I VETOER-0.007 tL5-350 Monitor w/ anter 347 90-022 other size pipe, consult pipe manufacturers Instructions. No person shall enter a tank hole excavation below the 5 ft. deep level unless the walls are shored primary and secondary tank. If necessary, bring pressure of both tanks to a minimum of 4 psi <br /> 20 1 VEEDER-R00"r 4lnputproteinterfacema]ulc329356. 2. Steel pipe ends are to be reamed per industry standards. Or side sloped as prescribed by current OSHA regulations. No exceptions. Stale or local requirements (maximum 5 psi) by reconnecting the air supply to the primary tank. <br /> 002 D. BONDING & ADHESIVE SYSTEMS (Fiberglass Pipe): that are more restrictive than Company specifications ore to be adhered to as though specified In Monitor the pressure for 1/2 hour and soap all tank fittings, risers and p <br /> 21 2 VEEDER-ROOT BInput interst iaVligmid interface module Company / 9 pipe connections. Upon <br /> 329358-WI 1. All fiberglass pipe surfaces to be bonded shall be cleaned with solvent a9 supplied by pipe p Y specifications, The sloping <br /> a hole is responsible for any desllgn, materials, equipment, permits, completion of the test, release the air pressure from the secondary tank prior to releasing <br /> 22 21 VEEDER�ROOT 4Rela out minrarface module ?129359- manufacturer. Apply pressure until mechanical lock is achieved. Back axial pressure should be etc., for shoring or aide sloping v hole, pressure from the primary tank. Damage to the primary tank may result if the pressure it not <br /> Y p maintained on all previously assembled joints to reduce the chance of separation. F. FILL AND BACKFILL: relived from the secondary tank first. <br /> K 001 2. Inspect all fittings for proper alignment and ossible 'back out" at the joints, All fill material shall be of granular nature. free from vegetation and extraneous material. Owner Caution: Relieve all tank pressure prior to removing any fittings. K <br /> 13 I VEEDER-ROOT Sitcfarmodule, 330149_1002 g p p <br /> .� j- 3. Follow pipe manufacturers recommendations on cure time before disturbing joint. or testing. Rep. shall inspect and approve the material before it is spread. Spread material In lifts not to exceed I. POST-INSTALLATION PRESSURE TEST, HYDROSTATIC: No lank that shows any evidence of a leak <br /> 27 1 VEEUER_R00T 6 ria eg iustnco.eprobc HJ .90-II o4 If it is anticipated that the temperature will drop below 70' F. (16' C) at any time during the 12 inches and tamp thoroughly. When required by local code, Contractor shall provide a compaction he to be kept in the system. Any damage incurred to the tank during the installation will be <br /> 25 1 VF.FDER_ROOr l0' M im n t m�,.be 84739Q409 test for certification of fill. contractor's responsibility. The Owner is la be notified of as damage and will determine the <br /> 16 1 VEEUE&ROOT +"Installa0ank[for as 8+9600.1010 curing process, heat shall be applied to the jointer Only Chemical or electrical devices P Y Y 9 <br /> - ° recommended by pipe manufacturer are acceptable for this purpose. No open flame or sparking 1.4 BALLAST course of action to be followed. <br /> 27 I VEEDE RRUOT 4'FULJlaaon kit for diesel 87960,0-011 devices are to be used. - If a hydrostatic lest Is required by a local agency, the contractor is to isolate the tank for testing and <br /> 28 2 VEEDRRROOT Ntcluoial 11.10, 797390-409 E. THREADED JOINTS: A. MATERIALS reconnect when testing is complete. <br /> 29 1 VEEDE&ROOT Inmrootial sensor 797390.404 Threaded joints must be reamed and have clean cut, perfect threads and be made u with non- Water is to be used as a ballast under all conditions where ballost is required. J. INTERNAL MEASUREMENTS: Take internal diameter measurements at the fill and the remote pump <br /> 30 6 VEEDER 0.00T Pyingpunpxnsor 1943SO-208 hardening p petroleum products approved by Owner. 00 NOT USE B. DRY HOLE CONDITION: openings, on both single and double wall FRP tanks. The Contractor, witnessed by the Owner <br /> 31 1 VEEDERROOT 4"Instailatiutkaforuscdod%496(10014 g joint tom Dual insoluble in Tanks, with backfill to to d} tanks, must be ballasted if there 19 an thence that surface or Re <br /> 32 2 VEEUERROOT L'mnrsal xnsor muunnn krt?30020-012 ADHESIVE FOR THREADED CONNECTIONS. P y p., is responsible for making and recording, the required measurements. Take the first set of <br /> 8 - Approved 'pint compound: subsurface water will enter the tank hole to a depth of 23" or greater above the bottom of the measurements prior to placing any backfill around the fork. The second set of measurements <br /> 33 1 VEEDER-ROOT O.erfillalimm 79U09I-001 Hi-pro thread sealant; refer to A.O. Smith bulletin no. 04510, tanks. is to be taken when the backfill has reached subgrade (prior to pouring to concrete slob). <br /> 37 1 Alanmi acknowledgement switch 790(195- Rettorseai <br /> 001 Permatex 51-D C. WET HOLE COND111ON: If the difference between two sets of readings is greater than 1 1/2" stop the job. The Owner <br /> J 35 3 MORRISON EROS 4"Tankmomtodngcap/adapter 305XPA. Attempt to pump water from the tank hole to maintain a "Dry Hole Condition If unable to obtain is to be notified and will determine the course of action. Contact the fork manufacturer for further J <br /> 130OAK or approved equal a "Dry Hole Condition', Owner is to be notified and will determine the course of action to be guidance. <br /> 36 2 MORRISON BROS 3"Hen ed check valve t.%SO psi relief F. FIBERGLASS TO STEEL PIPE CONNECTIONS: <br /> EJ6DRP-0300,VV p 9 pipe Or filling before bonding onto followed. Install filter fabric, Ile-down 'logs and bedding as specified elsewhere. Set tank in hole, K. BALLASTING: Only the primary (inner) tank shall be used when ballasting the tank. Never fill the <br /> Fiberglass threaded end adapters are to be threaded into the steel 9 g <br /> 77 I MORRISON DROS 2"Double Dula vent 135-2 the fiberglass pipe. Use mail end fiberglass fitting when connection to flexible connectors. All partially fill with water until it sinks firmly on the bed. Use only enough water to ballast lank until secondary (outer) tank with o evil. If the tanks are ballasted, conduct Hydrostatic Teat (instead of <br /> flexible connectors are male; swivel h temple. The female end connects to the fiberglass piping. backfill is to top of lank. After backfill to top of tank, fill tank with water until completion of the past-installation air test) on the tank and fittings. <br /> 38 2 MORRISON BROS 3"Doubleomlavcnt 153-3 Y 9 PP' 9' installation. L. BURIAL DEPTH: The burlal depth from the top of the tank to ground level shall be a minimum of 3 <br /> 39 1MORRISON BROS 4"Sheinerw/40mcshscrem 285FDI- DO NOT USE ADHESIVE FOR THREADED CONNECTIONS. CAUTION - BALLAST LEVEL MUST NEVER EXCEED WATER OR BACKIFILL LEVEL IN THE HOLE feet and a maximum of 7 feet. The fittings, if a manway is used, will be approximately 5 to 6 inches <br /> 22WA5 G. SPECIAL FITTINGS: DURING INSTALLATION. Do not remove tallest until tank slob has Ibeen poured. Oa not set remote off the top of the tank. This shall be considered for the slope of the piping and thus may affect the <br /> 30 3 YSNuclessskelwdl plug./fitwg Position the valva so that the line test port plug Is accessible. pump motor until ballast water has been removed from tank. tank burial depth. <br /> A55854.1 H. PIPE WRAPPING: M. VENTING: Vent the annular space between the <br /> 41 2 Gather Twohose,twin product dispenser Wrapping material shall be 2 layers of 20 milpolyethylene toe "Pot en 930' manufactured b the 1.5 DOUBLE WALL FRP TANK INSTALLATION: P primary and secondary tank only if required by loco) <br /> 9153AXTW2 CX da 9 O ve P Y Inch TRP pi. Venting of the ranular space is oatsrequirednc by the tank one <br /> vent <br /> 0 required, 2 <br /> Kendall Company (or equal approved by Owner.) Wrap overlap shall be.Dna-holt width of wrapping Inch FRP <br /> 42 2 cash" Va rre,meg kit 032020 Q A. MATERIALS: pipe shell be manifold between the tanks and connected to one vent riser. Do not use the <br /> Eo material, Wrap 1 1/2" and 2 fittings with Polyxen- 900 (12 mils) with 60% overlap. In difficult areae rimer (product) tank vent to vent the annular e <br /> J3 I Gasbov Flcetke reader 6 host C06306 Pol en 931 can be used before turn in with Pityken 900.. Primer enall be Pol en 927 above 1. Oou orf wall (fiberglass reinforced plastic tFRP) storage supe tanks are u be per. led by Contractor in primary (P ) space. <br /> I Gasbor Kev encoder CO6292 Nc ppP g * - Polyken accordance with the plans and specifications as supplied by manufacturer. N. INTERSTITIAL MONITOR: A Pull siring may bet the took. Install o new Dull string If sa string is <br /> H1 Exc 1pt or PDo n 919 (above 10' Fat inters lost or broken. The pull shin Is not a took manufacturer warrant item. Install the I"-I <br /> 45 I Gaslo Phone madam,bulls in C0939 Exceptions: Do not wrap the union at the remote pump and FRP pipe/flex connector connections. interstitial monitor at the botom cen9erline of the FRP took. Insert fish tape through the annular <br /> 46 1 GasW Phonemodcm Aandeio0c Co1533 Nominal Gallons Couple Wall P 9 <br /> 47 1 Gesbit COt654 L SETTING & REDOING PIPE: X space. Tag bath the pelt string to the probe signal cable be 12.5 ft. plus the burial depth. Attach the <br /> 4H 0 Oma 1. Piping shall be place/ on prepared bed in such a manner as t0 minimize Folnl9 at which one pipe Xerxes pull string to the probe and to the fish tape and pull probe into tank. When the togs on the signal <br /> 79 1 Cal illy Kay rete rade CO284N may cross over another pipe. At points where piping must crossover, a minimum of 4 inches 2.5510 13'-5 3/4' Long cable and the pull string match, the probe Is at the bottom centerline of the tank. The pull string is <br /> 50 200 Garbo Kayr,uBene s, rev C0162J must separate the pipes. 6'-J 1/2" O.D. to remain in place for future accessibility. <br /> 2. When piping is placed on the bed, proceed to "First Test" (below)prior to imckfilfing trenches. Weight: 1,800 Ibs. 0. INSTALLING THE CONTAINMENT SUMP: The containment sum must be watertight to prevent <br /> 51 0 Omit J. CLEANING SOLVENTS: Remove an accumulation or accidentals II of g p g <br /> 52 0 Omit y pi pipe cleaning solvents on liquid ingress or egress. Fiberglass inside and outside v( tank collar <br /> 53 4 OPW 1-IR"Fmmgcnc,r It"� A <br /> 86.5825 the tank immediately with a clean cloth. After the piping is complete; inspect the containment sump 15000 29'-5 314' Long P. INSTALLING THE SPILL CONTAINMENT FILLBOX: The spilt containment fill box must be liquid tight. <br /> 54 2 OPW I I/2"Vaporsmcr w/ t 60V SP-1001 and other collection points for piping cleaning solvents. Contractor will be responsible for any 10'-4 0.0. Test at fill boxes by tilling with water for a minimum of one hour. There should be no drop in the <br /> 55 2 Emco Wheaten Lcad reel noetic, 2000-142A damage to tank resulting from an accumulation of pipe cleaning solvent. Weight: 6,100 Ibs, water level during this test. bo not drain water into the tank. <br /> 56 2 OPW COaxialhoseadapmr0380 K. REPAIR OF PIPING: Any damaged piping must be replaced. Repair of piping using field cut half 1.8 APPROVED MATERIALS <br /> 57 2 OPW V,?)?or rmmc nozzl. F-Din section of pipe is not acceptable. If approved by Owner, repair using manufacturer supplied 35.000 64'-3J4" Long - <br /> C3 58 4 OPW F111Cu634IT-7085 pipe fittings and procedures is acceptable. Repaired pipe requires complete testing using procedures 10'-4" O.D. (NOTE: O.D. IS OVER THE RIBS) A. APPROVED BACKFlLL MATERIALS: Ci <br /> 59 4 OPW F,Ilca adapter 633TT-HOS below. Welghti 13,600 Ibs. 1. PEA GRAVEL: A clean, naturally rounded aggregate with a 1/8" minimum and a 3/4" maximum <br /> 60 3 OPW Overfill prmcnuonvahe 6150-4100 L. SECONDARY CONTAINMENT FITTINGS: Two piece fittings require more tchesive than normal bell 2. Other Contractor supplied equipment included vapor recovery (,when specified) Phase I diameter. Up to 5% of the particles may pass through a #8 sieve. <br /> 61 2 OPW 4"x3"Exuaaortecfittmg Fa3"VR 233- and spigot joints. Two 7116" wrenches or a variable torque impact,';;tench Is required to lighten the Assemblies: Adapters, dust cape and nameplate holders. Phase If Equipment: Anti-Recirculation 2. STONE OR GRAVEL CRUSHING$: Washed material with a particle size between 1/8" and 1/2". Up <br /> 7730 ffttings. Make sura adhesive fills all gaps between pipe ends and ii g sockets. valve, high hose retractor, nozzle swivels, flow limiter, anti-kink springs, swivel stops, camps, to 5% of the particles may pass through a #8 sieve. <br /> 62 I OP\ 4"d"xl"Exuaaor crossl3uin8 2??N4- M. FLEX CONNECTOR BOOTS: extension. NOTE: Approved materials must be dry, free of ice and snow, and meet ASTM C-33, Paragraph 7J <br /> 4433 Encase .I1 flex connectors in an isolation boot. When in contact ,wnred,il soil or backfilf material. Move for quality and soundness. The dry gavel density must be a minimum of 95 Pounds per cubic foot. <br /> 63 1 OPW I 2',,2"E,gacmre,O.Quin 233-4422 the isolation to inspect and test oil primary piptng pod flex coL 1.6 HANDLING OF FRP TANKS: B. TANK HOLE LINER: Contractor Is to provided as Filter Fabric Tank Hole Liner when: <br /> 64 1 OPW 3' Sw ingymnt,_ilon 3630-(qU21 1. Tank hole is unstable soil, or <br /> 65 I OPW _V�or«coo cpcap Ii 117.7085 2.3 TESTING OF PIPING: A. RESPONSIBILITY: The Contractor Is responsible for off-loading the tanks from the delivery vehicle. <br /> 66 1 OPW v,,pxrcco._ry al a i,, 16HAV 1620 A. Notify the Owner, who MUST observe all tests, at least 24 hours in J\dvonce of any tests. A crone or backhoe of sufficient lifting capacity must be used. Confirm weights with lank <br /> 67 1 OPW 3"Pre,,mc/,acumu ,cot 523LP-3203 _ Contractor to coordinate testing with local inspectors and Owner. monufocturer. <br /> _ __ 9 NOTE: Bedding material, tie-down "logs" and sample wells are to be placed on the top of the filter fabric. <br /> 68 I OPW 4'Wadjn n At-3? B. LIFPNG & MOVING: When lifting or moving an FRP tank, always use properly sized equipment and <br /> aur, rcump _ B. Rhe Con IBNTY: Excess fabric at top of the hole should be folded over the backfill material at subgrade level. <br /> 69 2 \vestern Fbgls Double stdN Aispcnxr sump The Contractor is responsible for all labor, material, and equipment to conduct pressure tests air lift by lifting lug(s). On large tanks, greater than 8' diameter, use a spreader bar to ensure a lift angle <br /> pi . p ( of at least 45' at each lifting lug. Never roll or use cables or chains around an FRP fork. Set on C. APPROVED FILTER FABRIC MATERIAL: <br /> UMich'.-D2 or hydrostatic) of all o not vent and the recovery piping. 9 9' Reemay Inc. -Corp. 3401 or Typar fabric <br /> smooth ground, free of rocks and foreign objects. F <br /> F 70 2 Western Tests Slash uazd Pvircho1 C. TESTING ❑oceduONS: Do not loured from the following testing procedures. Perform aerated. a Hoechst <br /> Fibers or . - "Supac 4Np" fabric <br /> EXCEPTION - Tank can be rolled up to 90' on a smooth clean surface when performing the °pre- <br /> 71 2 Weslcrn Fb Is ,\n<ssdwr dtbonJln kir DMDA30819 tasting procedures required by local Inspectors after tests are completed and documented. Installation" re Hoechst Celanese Corp. e ark nufac <br /> 72 2 Weston Full, Safdv r., a_he mount 9308 1. FIRST TEST (Prior To Back Filling Pipe Trenches): pressure test. or fabric approved by the tank manufacturer. <br /> D. CHOCKING: Tanks are to be chocked in accordance with manufaclwrers recommendation until <br /> 73 2 OPW +5.5075 I"MxF s.ivd Do not connect piping to tanks, remote pumps or dispensers. 09 not seal or install secondary <br /> 74 2 GOODYEAO Rri"z lM,m leader hose I"x l' ready for installation. If windy conditions exist or are expected, anchor tanks using minimum 1/2" <br /> containment fittings until primary piping Is tested. Test the entire piping system, i.e., product, n on or hem rope <br /> 75 2 I <br /> DYEAR Maeimum Premitt vapor«mam hose vent and vapor recovery (where applicable) in accordance with the following procedure. )" P pe over each tank and secure to slakes of adequate size to prevent movement of <br /> e P a. Step One: Install pressure application system that includes too pressure gauges (15 psi the tanks. <br /> 76 <br /> 7227- DYEAR MasimumPremiavapor«cm<t3+ham maximum . Apply 10 psi pressure to each 1n system. Soap all joints using approved soap D. OPENINGS: All tanks are shipped with dust covers or steel plugs in each opening. Dust covers are to GENERAL NOTES <br /> i.p ) pPY P P piping Ys P Jv 9 pP p remain in each opening until ready for the pre-tnstallatfon pressure test. All tanks must have either a <br /> solution. Carefully observe each joint for evidence of leaks: <br /> 77 2 DYEAR F"BrielLS'um crh0se %"st6" dust tap or steel plugs in plate or a 5 psi Pressure relief valve in place of all times. <br /> b. Step Two: Protect area around piping systems to be tested to prevent workman, passers-by, <br /> 78 2 KY "Dreakawaeusableble 227G r. DAMAGE: <br /> etc., from entry. Install pressure application system that includes two pressure gauges (150 <br /> I9 3 HUSKY B«ska.ay ,_usable 33G0-VR 1. Inspect all tanks carefully for signs of damage upon receipt. Nato any damage on the shipping <br /> psi maximums Apply iv psi pressure to each piping system, hail for Dna minute, relapse <br /> 80 2 hose rcua<tor 9911-t documents and notify the Owner Contact the lank manufacturer for additional i. SET TANK DEPTH TO ALLOW PRODUCT, VAPOR, AND VENT ONES <br /> pressure. Repeat for flue one. <br /> TO SLOPE 1/4' PER FOOT MIN. DOWN TO TANK. <br /> el 3 36"Ea lift RmanhOlc ]t1J5 information. <br /> C. Step Three: Repeat Step one. <br /> E 82 J 36"Snap-Fight fill-Spell comainnnea box 2. It the tank is damaged at any other time, do not attempt repairs. Notify Owner who will E <br /> 36.05-OSG Record all test results . Owner's approval is required. After determine the course of action. 2. CONTRACTOR SHALL VERIFY THAT THE TURBINE HEAD WILL BE 4" TO 6' <br /> °n H3 3 166-Utilir box wn2"skin 7020 obtaining such approval, the Contractor shall backfill trenches to siIbgridds, following the F. SETTING: Set tanks on prepared bed with a slope downward toward the fill end of the tank. A slope ABOVE THE TANK BOTTOM. DO NOT INSTALL TURBINE PUMP ASSEMBLY <br /> E re uirements of Division 13, Section I.J.34 1 12"Mumtonn .dl box 112MWCL °� of 3" difference between the two extreme openings of the tank is desired. The acceptable range of IF IT IS LESS THAN 4" FROM BOTTOM OF TANK, <br /> 2. SE ONO TEST (After sealing secondary piping): Apply 10 psi to the secondary containment <br /> 85 2 CNI Hoserub.,_, 99I5_U system, Soap all joints using a roved soap s slope is 4" maximum and ep minimum; with the fill end lower than remote pump end of the tank. <br /> ,a 86 2 REU JACKET SNP submersible pumpP500R4-2K-137- g pp p olu frons. Tanks that exceed the acceptable slope or that slope downward to the remote pump end are <br /> 3. REMOVE SHIPPING PADS FROM TANKS PRIOR TO INSTALLATION. <br /> "i 21 3. THIRD TEST (After connecting piping to tanks but prior to baekfillirg): Apply 45 pal pressure air improperly set and must be reset. <br /> `a 87 z REDIACKET M/2 HP submersible pump WQuickset (do not exceed 50 psi) to test system. Keep pressure on all lines Until backfilling Is completed. C. INSTALLATION WITH APPROVED MATERIALS: -- <br /> a X3PI50SI There should be no pressure fos during the remainder of construction. 1. Place a 12" Ilft of backfill evenly around the tanks. Push backfill completely underneath the tank <br /> u 88 2 REDIACKET 26'Roger 065-026-3 4. FOURTH TEST (After Backflling and Patch Paving): Applies to product lines after backfill and between the ribs and under the end taps. Procedure can be done from bank or adjacent tank top. -'-'-' ---" <br /> 69 2 10MAR 2"Ball vatic mMel fl(1(1 NII00408 patching of concrete islands, stabs, and rd avin has been completed.---- - P 9 yo paying P It a man he he in the hole to 'work' the backfill, hole must be shored or aide sloped as ,...__. <br /> 90 1 _E,%_WHEA fON AN oda ter 1451-0]i 0. TESTING EQUIPMENT: prescribed by current OSHA regulations. <br /> 91 1 EMCOWHEATON API unloadmILdapt`cr F456.001 Teat lines using Petra rite Hydrostatic Line Testi. equipment ora roved equal. 2. Place second 12' lift or backfill even) around the tanks. Again. re eat the or backfill <br /> 'v 9E Z NIBCO 3"htg style butt9rtly vatic wPonon LD- 9 Yd 9PP 9 Y 9 P 9 <br /> U 3222) Test fluid shall be assigned product, diesel fuel or water. Contractor to comply between the ribs and under the end cops. Add backfill evenly around the tanks up to the tope <br /> m 93 I Ca ilal Tubber 3"s 12'Va recap ay host w;cam luck fully with the Procedure Manual for the Operation of Line Tester. of the tanks. D <br /> E -"Y"� - Test ressure shall be 50 psi maximum 1.5 times Operating pressure.- 150% for a remote um 3. Backfill to sub rode after in and testing Is completed. <br /> 97 1 Omit P P ( 9 P ) pump 9 piping 9 9 <br /> 95 1 _ CONTREC OatchwnVob 430DIOA system with an allowable tolerance of 0.010 gol/hr. H. INSTALLATION WITH ALTERNATE MATERIALS: All alternate materials must receive written approval from <br /> E 96 1 Li and Control 3"Turbine metcra cam lifier E. VENT LINES (no phase It vapor recovery): the lank manufacturer and the Owner. 8/10/99 SENT TO CLIENT FOR PERMIT CAM <br /> °u 97 I SKULLY ST-35-120-ELK Opsit Curtrolln 07903 Unless required by local agency, no second test required. <br /> e <br /> 93 I SKULLY ST.47-120-ELK Groundhog L'mmolicr <br /> F. VENT LINES AND VAPOR RECOVERY PIPING (with phase II vapor recovery): 1.7 TANK TESTING 8/70/99 REVISED PER CLIENT FINAL COMMENTS CAM <br /> 08220 Contractor is responsible for vent and vapor recovery piping Systems passing any locally imposed MARK DATE REVISIONS INITIAL <br /> - 99 1 SKULLY SC-6W Plug,@cable un it 08159 test requirements. A. PRE-INSTALLATION TEST SET UP: Prior to the pre-installation testy, all shipping pods must be <br /> 100 I 6f ORRISON Rdicfsalse izlti removed from the tank and the vacuum ub the Domtar space must be released. SPECIFICATIONS AND <br /> e 101 I PTCOUPLING 2"Ada t rs N9ale NPT thread 24F A vacuum on the annular specs is not suhstitu to far the pre-ins.lallation test. All instdladon tests <br /> o. must be performed and recorded on company supplied forms. <br /> r 102 I PT COUPLING 2"Oustca 20V P P yBILL OF MATERIALS <br /> 103 1 DDRG Airk water reels!4''125' 30-L-S-R 0. NOTIFICATION: <br /> 0 104 I ROYSTON If d merle 2l island valamut T,e l The Owner, MUST observe all tests. Notify at least 24 hours in advance of any tests. <br /> m S <ial C. PRESSURE APPUCATION SYSTEM: <br /> m <br /> m O 105 1 V1004OP1502 pipe./.020 slots The pressure application system is to have two pressure gauges Grange 0 to 10 psi with 5 psi C <br /> � VIOOtOPISW pressure reliefs) in the system, both in good condition and having been tested and calibrated within <br /> a 106 1 4F' a three-month period prior to the tank test (copy of the test and calibration data to be furnished to 120 FRANK WEST CIRCLE <br /> 107 1 UNIVERSAL 4"Lakin cop-1300.40 the Owner upon request). <br /> ii 108 ALL F,bergsasspnmary anitseeondarypipe said RC USE EXTREME CARE AROUND AND NEAR THE PRESSURIZED TANK. (Relieve the pressure prior to STOCKTON, CALIFORNIA <br /> E _ _ litungs Smith Rod ihreod I A moving the tank or removing on X fittings. <br /> F 109 ALL ..SchA0,teelp,peandhum3sandl50H 0 Never pressurize the secondary (outer) tank without pressurizing the primary (inner) tank first. <br /> Ilan Besforabcvexinmedwdded Im . D. LEAKING TANKS: <br /> 110 ALL Bl and ui 'I ViD�g co-Wass asiauucd C DO NOT install a lank which shows any evidence of a leak. The Owner Rep is to be notified of any <br /> N j III 3 ACE TANK Crash Hoop 42'Wx72"Hx6"Sch AO 0 damage and will determine the course of action to be followed. <br /> a v ACGUARDPOST6 E. SCOPE OF WORK: <br /> 112 2 VAP RLESS Lina Leak Detector for Shp STP The Contractor is responsible for all Inbar, material and equipment necessary to conduct the TEICHERT <br /> NIFG. 99-LDaOW <br /> c's n following tests: <br /> a' <br /> X113 2 VAPORLESS Lina Lcak Defacer for LSE <br /> /a P STP Pre-Instollallon Pressure Test, Air <br /> a w MFQ O LD200p <br /> a�B 114 2 JOMAR 3"D4IIVsha,Ml00-]IO After-Installation Pressure Test, Air or Hydrostatic B <br /> n F. ACCEPTABLE "SOAPS": "Soaping' the tank and fittings during the test is to be done using a small <br /> j garden-type hand-pressurized spray unit. The test soap shall be a high foaming "soap" that bubbles <br /> p easily if in contact with an air leek in the tank but won't bubble due to dispensing from the pressure �j uT ARCHITECTURE • ENGINEERING a ENVIRONMENTAL SERVICES <br /> applicator. Acceptable soaps are: 1 r 1L <br /> 11 1137 N. McDOWELL BLVD. PETALUMA, CA 94954 (707) 765-1660 <br /> w o "Seam Test High Soap* To GROUP Me JOHN W. JOHNSON, ARCHITECT JAMES H. RAY, CIVIL ENGINEER <br /> w "Amway Loc High Soap" �- <br /> 'o '#7006 Southbend Leak Detector" <br /> lam RHL REVIEW INMALPDATIE DATE: 05AUG99 <br /> LI <br /> i or approved equal <br /> G. PRE-INSTALLATION PRESSURE TEST, AIR: Extreme care to to be used around and near the PRELIMINARY <br /> �� pressurized tank. Never pressurize the secondary outer tank without pressurizing the Amar OR, BY: CAM <br /> ¢ .. P P Y ( ) P 9 primary PLANNING <br /> j (inner) tank. STEEL BID <br /> W x 1. Primary (Inner) Tank Test: <br /> Tighten all tank fittings. Locate a pressure gauge in the vent/monitor fitting in the secondary BLDG PERMIT 1 APPR,e)( <br /> o A (outer) tank. Locate a second pressure gage at a fitting in the manAway and connect the air GENERAL BID l <br /> z pressure hose to this some fitting. Pressurize the primary (inner) tank to a minimum 4 psi, PHIL # 9244.40 <br /> maximum 5 psi. Monitor the pressure gages a minimum of 1/2 hour. There should be no pressure PERMIT REVS SHEET <br /> c0 increase in the secondary outer tank. Sop all tank fittings.z Y ( ) P 9 . cON51RUC nON <br /> 3 Do net use drawing A7 <br /> for construction <br /> o - unless initialed <br /> t 2 3 4 5 6 7 8 9 10 11 1 12 _ 13 14 1S 16 17 18 <br /> i <br /> l <br />