Laserfiche WebLink
...i <br /> 13. Handling of excavated soil: <br /> a) What material will be used to line and cover the tank 3c pi ing stockpile placed on the ground? <br /> 2I�STrC. !✓LG QE G�Y� 8m!✓y ¢ al.�G`Ll G <br /> b) What will be the disposition of the tank 8c piping stockpilo atter analysis'? <br /> IFG`L'P/LE /s GYE.giy �T Uig! <br /> LlYTO 7ZP�tDE�%d6' LFilEL �" 1'FLf�.r�T,ai'7l�itTEO,ST/✓i�. <br /> QF tiny To G./G/F!!�/l�lf� S rf T fIPP.PaUEO cS'1T4 <br /> 14. What is the depth to groundwater? ��� C6 <br /> Describe the source of information: <br /> Spy CJ �L C¢C1i� F�) G72sYT�'zlG Aitit7 �✓r27G./1� l�C�"r' <br /> Is. Are there any wells on this parcel or adjacent properties'? YES [ J N� <br /> TYPE OF WELLS DISTANCE TO TANKS(S) <br /> Public Well ft. <br /> Private Well <br /> Irrigation Well ft. <br /> Monitoring Well It. <br /> Other ft. <br /> 16. Will the tank(s) pending closure be replaced with an aboveground or underground storage tank(s) and has the <br /> responsible party submitted a "fetter of Commitment" to PHS/EHD? <br /> Page 6 <br /> cfosplan (Rev 4/8/91) wp <br />