Laserfiche WebLink
BOARD OF TRUSTEES <br /> Jamas Culbertson. Pros. SAN JOAQUIN LOCAL HEALTH DISTRICT <br /> Culbertson. <br /> E. Vannuccl, Secy, 1 <br /> SERVING <br /> Anthonette Van Spronsen 1601 East Hazelton Avenue, P. O. Box 2009 San Joaqulin COf <br /> ounty) <br /> Earl Plmentel <br /> Fern Buphee Stockton, California 95201 City of Escalon <br /> Daniel L. Flores 209/466-6781 City of Manteca <br /> John D. Most, M.D. City of Ripon <br /> WIIIIom J. Wade Clly of Stockton - <br /> Mary Anna Love Jopl Khanna, M.D., M.P.H., District Health Officer City of Tracy <br /> San Joaquin County <br /> San Joaquin County <br /> Facility Name i <br /> AddressO/ �� ) <br /> Date of InspectionrL/ <br /> Inspector <br /> MONITORING ALTERNATIVE 87 — ��00'r) iy po , `'�.S <br /> 77, <br /> Limited to undernround storage tanks which have infrequent inputs and withdrawals and <br /> where the liquil:' level in the tank can be measured to an accuracy of +5 gallons or less <br /> when the tank is half full . <br /> This monitoring alternative shall include: <br /> Annual precision test on tank and piping. <br /> Tank gauging performed as follows: <br /> cv Tank must be capable of being secured to prevent unauthorized inputs and <br /> withdrawals. <br /> Tank must have no inputs or withdrawals for at least a 48 hour period <br /> (2 days) at the end of consecutive periods lasting up to 7 days. <br /> (For example: tank in use Monday through Friday, then locked <br /> over weekend) . <br /> v Liquid level measurements are taken at the beginning and end of the <br /> monitoring period (lasting at least 48 hours) . <br /> (For example: level measured and recorded Friday night before <br /> locking and again on Monday morning before opening. ) <br /> t� If liquid level varies more than 1% of the tank volume or 5 gallons, which <br /> ever is less , between measurements, an unauthorized release shall be <br /> assumed to have occurred and shall be reported to the local agency within <br /> 24 hours, as per Article 5, Sect. 2652 of the regulations and further <br /> evaluations shall be performed to verify or disprove the variations. <br /> Implementation of the monitoring alternative requires that the following circled items be <br /> completed by the dates specified. <br /> i / Precision test(s) must be performed by <br /> office within 30 days of the test. and results submitted to this <br /> 2 Tank jauging must be started immediately. (See instructions above). <br /> If the above compliance dates cannot be met, contact this office prior to the specified <br /> date. <br /> 4/86 UGT 3 <br />