MATERIAL AND WORKMANSHIP 11. SAFETY PLAN: CONTRACTOR SHALL DEVELOP AND MAINTAIN, FOR THE B: VENT/VAPOR PIPING: RED THREAD IIA AND RED THREAD II WITH UNDERGROUND TANK CLOSURE PLAN <br /> I DURATION OF THE CONTRACT, A SITE HEALTH 1 SAFETY PLAN THAT WILL FITTINGS AND 1000 AND 8000 SERIF$ ADHESIVE, OR AMERN DUALOY x <br /> I. UNLESS OTHERWISE SPECIFICALLY PROVIDED IN THESE DOCUMENTS, ALL EFFECTIVELY INCORPORATE AND IMPLEMENT REQUIRED SAFETY PROVISIONS, 30001- WITH ALCOHOL FITTINGS AND RP48 ADHESIVE. DO NOT MIX 1.0 GENERAL INFORMATION U <br /> EQUIPMENT, MATERIAL, AND ARTICLES INCORPORATED IN THE WORK AND: MANUFACTURER'& MATERIALS. I.1 LOCATION OF TAN"- F" u. <br /> 4 <br /> COVERED BY THESE DOCUMENTS ARE TO BE NEW AND OF THE MOST SUITABLE QWK STOP 39 <br /> GRADE FOR THE PROCESS INTENDED. A: APPOINT AN EMPLOYEE AS THE SAFETY OFFICER WHO 18 QUALIFIED C: PER$N8 INSTALLING PIPING MUST BE CERTIFIED AS HAVING BEEN 22$6 E. FREMONT STREET w C� <br /> AND AUTHORIZED TO $UPERVISE AND ENFORCE COMPLIANCE WITH THE TRAINED BY MANUFACTURER STOCKTN, CA 95205 W ((� <br /> 2. THE CONTRACTOR $HALL FURNISH TO THE OWNER'S AGENT FOR HIS HEALTH AND SAFETY PLAN. SUBMIT THE NAME AND QUALIFICATIONS OF (209) 464-1038q�°` It <br /> APPROVAL THE NAME OF THE MANUFACTURER THE MODEL NUMBER, AND THE SAFETY OFFICER TO THE OWNERS AGENT PRIOR TO COMMENCING WORK P: STEEL PIPE: ALL METAL PIPING SHALL BE BLACK IRON SCHEDULE v!/ '� 1 Lo <br /> OTHER IDENTIFYING DATA AND INFORMATION RESPECTING THE N THE BITE. 40, OR EXTRA STRONG. GALVANIZED PIPE 18 NOT ALLOWED. FITTINGS 12 OWNER: QUIK STOP MARKET$, INC. I- co *' <br /> PERFORMANCE, CAPABILITY, NATURE, AND RATING OF THE MACHINERY AND $HALL BE 300 PBI MALLEABLE IRON. P.O. BOX 5145 <br /> MECHANICAL AND OTHER EQUIPMENT WHICH THE CONTRACTOR CONTEMPLATES B: THE PLAN SHALL CONTAIN THE NAMES, ADDRESSES AND TELEPHONEFREMNi, CA 94531 IN � 10 <br /> INCORPORATING IN THE WORK WHEN REQUIRED BY THE OWNER'S AGENT, NUMBERS OF THE SUPERVISORY PERSONNEL, THE W08FITAL FACILITIES E: ALL STEEL PIPE BELOW GRADE 1S TO BE DOUBLE WRAPPED WITH 20 (810) 651-8500 2S ,�} <br /> NEAREST THE SITE, AND A MAP TO THE HOSPITAL. PROCEDURES SHALL BE MIL. PVC PIPE WRAP, OVER A PIPE WRAP PRIMER FOR USE WITH VINYL N S <br /> 3. WHEN REQUIRED BY THESE DOCUMENT$ OR WHEN CALLED FOR BY THE WRITTEN IN THE PLAN FOR ACTIONS TO BE TAKEN SHOULD STRANGE ODORS TAPES, AND SHALL BE BY THE SAME MANUFACTURER AS THE WRAP. 1.3 PROJECTED CLOSURE DATE: 01 SEPT 98 ^ W O <br /> I OWNER'S AGENT, THE CONTRACTOR SHALL FURNISH THE AGENT FOR OR HAZARDOUS SUBSTANCES BE UNCOVERED. �. a a N <br /> j APPROVAL FULL INFORMATION CONCERNING THE MATERIAL OR ARTICLES 1 F: ALL THREADED CONNECTIONS SHALL BE THREADED WITH SEALANT 1.4 TANK DATA: <br /> WHICH HE CONTEMPLATES INCORPORATING IN THE WORK WHEN SO G: IF, DURING THE COURSE OF THE WORK, UNSAFE CONDITIONS DEVELOP WHICH SHALL BE CURRENTLY WARRANTED BY MANUFACTURER FOR FULL <br /> DIRECTED, SAMPLES MAY BE SUBMITTED FOR APPROVAL AT THE OR ARE ENCOUNTERED, TAKE IMMEDIATE MEASURES TO CORRECT THE COMPATIBILITY WITH THE PIPING MATERIAL USED. AND FOR USE WITH NUMBER GALLONS MATERIAL PRODUCT �* O <br /> CONTRACTOR'S EXPENSE, WITH ALL SHIPPING CHARGES PREPAID. CONDITION. IF THE CORRECTIVE ACTION IS INSUFFICIENT IN THE PETROLEUM SOLVENTS, FUELS, OILS, DIESEL, AND 100% METHANOL, WHICH a W <br /> OPINION OF THE OWANER'5 AGENT, CONSTRUCTION WORK SHALL CEASE UNTIL SHALL BE VERIFIED BY CURRENT MANUFACTURERS PRODUCT DATA SHEET. 39-1 10000 STEEL UNLEADED GASOLINE F- ^ <br /> 4. MACHINERY, EQUIPMENT MATERIAL, AND ARTICLES INSTALLED OR USED CORRECTIVE ACTION CAN BE IMPLEMENTED. 39-2 10,000 STEEL UNLEADED GASOLINE Oo Zr F- O <br /> WITHOUT REQUIRED APPROVAL SHALL BE AT THE RISK OF SUBSEQUENT G: G.C. SHALL DEMONSTRATE TO OWNER'S REPRESENTATIVE THAT ALL W T� 4. <br /> REJECTION. D: PROVIDE A MINIMUM OF TWO FIRE EXTINGUISHER'S WITH A MINIMUM MATERIALS ARE NEW AND CONFORM TO ABOVE SPECIFICATIONS. 1.5 HISTORY: INSTALLED 1912 qq�� a 00 <br /> GLASS RATING OF 2•A,20-B,G WITHIN 50 FEET OF THE OPERATION. I <br /> 5. ALL WORK TO BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND 20. DO NOT PLACE PRODUCT PIPING UNDER BUILDINGS. PIPING RUNS OVER Ib CONTRACTORS: ~ rG h' <br /> REGULATIONS. 18. UNDERGROUND SERVICE ALERT (USA.) - THE CONTRACTOR SHALL NOTIFY TANKS $HALL BE MINIMIZED. MAINTAIN MINIMUM CLEARANCE AS SHOWN ON W <br /> to W <br /> MEMBERS OF U.S.A. 2 FULL WORKING DAYS IN ADVANCE OF PERFORMING DRAWINGS. MINIMIZE CROSSING OTHER LINES AND CONDUIT. IF PIPING GENERAL: TO BE DETERMINED IACC (Q <br /> 6. ALL MATERIALS SHALL BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS ANY EXCAVATION WORK BY GALLING THE TOLL-FREE NE-GALL PROGRAM IS NOT SHOWN N SITE PLAN, G.G. SHALL RUN LINES THE MOST DIRECT t' LL <br /> AND THESE DOCUMENTS. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION NUMBER (800) 221-2600. ROUTE SUBJECT TO APPROVAL BY OWNER'S REPRESENTATIVE. PRODUCT REMOVAL: QUIK STOP MARKETS, INC. " 0 <br /> OF THE OWNER'S ENGINEER 21. EXISTING VENT R18ERO ARE SHOWN N SITE PLAN. INSTALL NEW OWING BOTTOMS REMOVAL: O BE DETERMINED W <br /> 1. IF ANY OF THESE DOCUMENTS INDICATE A CONFLICT WITH THE STATE OR PETROLEUM WORK SCOPE JOINTS AT BOTTOM OF VENT RISERS. <br /> LOCAL REQUIREMENTS AS ARE CURRENTLY IN EFFECT AT THE TIME OF THIS TANK HAULER TO BE DETERMINED <br /> PROJECT, IT 15 EXPECTED THAT THE MOST RESTRICTIVE CONDITION(8) 1. PRIOR TO THE START OF WORK PROVIDE OWNER WITH WORK PLAN AND 22. PIPING. SYSTEMS SHALL BE TESTED PER CURRENT MANUFACTURER'S <br /> WOULD APPLY. SCHEDULE THAT ALLOWS THE SITE'$ STORE TO REMAIN OPEN TO THE INSTRUCTIONS SHALL BE FOLLOWED AT ALL TIMES, AND SHALL HAVE GEOLOGIST COMPLIANCE ENCLOSURE <br /> FULLEST EXTENT POSSIBLE. PRECEDENCE OVER OTHER INSTRUCTIONS, <br /> TANK DISR08AL PACILUTY, TO BE DETERMINED <br /> GENERAL CONDITIONS 2. OUT" SINCE GN$ ONFENCEEVERY 30 FEET.AREA WITH &' HIGH CHAIN <br /> AT THE END OF EACH WORK DAY TO LINE TESTING. OWNER 8 REPRESENTAY OLLNER'6 TITIVE VE SHWALLL��8S ALL NG LINE MOR 2.0 CLOSURE PROCEDURE-REMOVAL OF TANKS Q U 1 K STOP <br /> I. CONTRACTOR EMPLOYEES TO HAVE COMPLETED 40 HOURS OSHA TRAINING SECURE FENCING PANELS TOGETHER TESTING, MARK TEST PRESSURES N GAUGE WITH ELECTRICAL TAPE AT A <br /> COURSE PRIOR TO THE START OF WORK. CERTIFICATION OF THIS MUST BE BEGINNING OF TESTS. PRESSURE SHALL HOLD FOR AT LEAST ONE (1) SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DIVISION TANK 3 <br /> PROVIDED TO THE OUNER'5 ENGINEER PRIOR TO THE START OF WORK. 3. FLUSH, CUT, AND REMOVE PRODUCT LINE$ FROM EXISTING TANKS TO HOUR AND BE WITNESSED BY OWNER'S REPRESENTATIVE. DO NOT BACKFILL CLOSURE GUIDELINES AND BOIL AND GROUNDWATER SAMPLING <br /> DISPENSER ISLANDS TRENCHER UNTIL AUTHORIZED BY OWNER'S REPRESENTATIVE. GUIDELINES SHALL BE FOLLOWED, EXCEPT WHERE THE FOLLOWING <br /> 2. CONTRACTOR EMPLOYEES TO HAVE COMPLETED THE PIPING MANUFACTURER'S SPECIFICATIONS ARE MORE RESTRICTIVE. 2255 E. FREMONT ST. <br /> TRAINING REQUIREMENTS IN ACCORDANCE WITH 1994 CALIFORNIA U$T 4. REMOVE ALL EXISTING FUEL DISPENSERS, ISLANDS, BARRICADES, FUEL B: TEST PRESSURES SHALL BE: 6TOCKTON, GA 95205 <br /> REGULATING. CERTIFICATES 6HALL BE PROVIDED TO OWNER LINES, CANOPY, ASPHALT AND CONCRETE SURFACES AS REQUIRED, IN 2" - 60 PSI AND APPLY SOAP SOLUTION. REMOVE ALL PRODUCT FROM TANKS, <br /> CONTRACTOR SHALL COMPLETE THE PIPING INSTALLATION CHECKLIST PREPARATION FOR INSTALLATION OF NEW AS SHOWN ON DRAWINGS. ANY 3" - 40 P81 AND APPLY SOAP SOLUTION. (20W 404- 1035 <br /> SUPPLIED PIPING MANUFACTURER AND SHALL FURNISH THE CHECKLIST TO SALVAGEABLE EQUIPMENT TO BE REMOVED FROM SITE AS DIRECTED BY 3" - SECONDARY - 5 P51 AND APPLY SOAP SOLUTION REMOVE ALL RESIDUAL LIQUID, SOLIDS, OR SLUDGES. SAN JOAQUIN COUNTY <br /> OWNER OWNER REPRESENTATIVE. <br /> C. CAUTION: DISCONNECT FLEX CONNECTOR FROM STP AND CAP PRIOR PURGE ALL VAPORS FROM TANKS WITH A MINIMUM OF THIRTY (30) APN 141 -214-03 <br /> 1 3. CONTRACTOR TO HAVE BEEN TRAINED AND CERTIFIED BY THE TANK 5. PREPARE FOR REMOVAL AND REMOVE TWO 10,000 GALLON UNDERGROUND TO TESTING. APPLY 1 RELEASE PRESSURE SLOWLY. VENT/VAPOR SYSTEM POUNDS OF SOLID CARBON DIOXIDE (DRY ICE) FOR EACH 1000 GALLONS <br /> MANUFACTURER IN CORRECT TANK INSTALLATION IN ACCORDANCE WITH 1994 (GASOLINE) STORAGE TANKS (USTs) IN ACCORDANCE WITH THE SHALL BE TESTED FROM TOP OF VENT, THROUGH MANIFOLD(S), EXTRACTOR OF TANK CAPACITY AND PRESENT SALES SLIPS TO INSPECTOR <br /> CALIFORNIA UST REGULATIONS. CERTIFICATES SHALL BE PROVIDED TO UNDERGROUND TANK CLOSURE PLAN. OWNER WILL EMPTY TANKS OF BASE AND R16ER STAGE I CONTAINMENT MANHOLES, STAGE II VAPOR PELLETIZED DRY ICE 15 RECOMMENDED. CAP ALL OPENINGS EXCEPT <br /> OWNER CONTRACTOR SHALL COMPLETE THE TANK INSTALLATION CHECKLIST REUSABLE PRODUCT. GENERAL CONTRACTOR TO PROVIDE FOR DRY ICE TO LINES TO ISLANDS AND STAGE II FLEX CONNECTORS AT DI5PEN$ER(8). VENT PIPE AND ALLOW TWO HOUR MINIMUM AND SIX HOUR MAXIMUM FOR <br /> SUPPLIED TANK MANUFACTURER AND SHALL FURNISH THE CHECKLIST TO PURGE TANKS, BUT NO LESS THAN 10 LBB. PER 1,000 GALLONS CAPACITY. OXYGEN DISPLACEMENT AFTER PUTTING CARBON DIOXIDE INTO THE <br /> OWNER 6. CONTRACTOR SHALL PROVIDE FOR GLEANING AS NECESSARY, D. SLOWLY PRE86URIZE PRODUCT LINES AND VENT/VAPOR SYSTEM TO 50 TANKS. VENT PIPE OPENING TO BE CHECKED WITH A COMBUSTIBLE GAS <br /> TRANSPORTATION, DISPOSAL OF TANKS, AND RINSATE IN ACCORDANCE PER PSI. SOAP ENTIRE PIPE SURFACES INCLUDING JOINTS AND FITTINGS. DETECTOR TO DETERMINE IF TANK I$ VAPOR FREE OR IF ADDI NNAL ALTON <br /> 4, CONTRACTOR TO DEVELOP A SPECIFIC 511E SAFETY PLAN FOR TANK COUNTY REGULATIONS, BY APPROVED HAULER CUTTING TANKS ON SITE 15 CORRECT ANY LEAK5 AND RETEST. DRY ICE AND/OR TIME MAY BE REQUIRED. NGINEERING, INC. <br /> REMOVAL AND TANK IN8TALLATION PRIOR TO THE START OF WORK NOT ALLOWED. <br /> CONTRACTOR WILL CONDUCT WEEKLY JOB SITE SAFETY MEETINGS WITH IT'S E. SLOWLY RELIEVE PRESSURE FROM VAPOR/VENT SYSTEM AND REMOVE PLUG OR CAP ALL TANK OPENINGS LEAVING AN 116" - I/4" PRESSURE <br /> EMPLOYEES AND THE MEETING MINUTES WILL BE SUPPLIED TO OWNER 1. OWNER WILL CONTRACT WITH AND FURNISH CONSULTANTS TO PERFORM 601L PLUG FROM EACH EXTRACTOR AFTER TEST. REDUCE PRODUCT LINE RELIEF HOLE IN ONE CAP AT THE TOP OF THE TANK w <br /> AND/OR WATER TESTING UPON TANK t PIPING REMOVAL IN ACCORDANCE - _ PRESSURE TO 5 PSI. MONITOR DAILY UNTIL ALL YARD PAVING IS <br /> 5. CONTRACTOR SHALL HAVE THE FOLLOWING LICENSEE: WITH TANK CLOSURE PLAN AND LOCAL REGULATION8. (ALLOW TWENTY-FOUR '-COMPLETE. VISUALLY INSPECT THE TANKS UPON REMOVAL, ALL EXTERNAL TANK P.O. BOX 1025 <br /> HOURS FOUR RESULTS OF SOIL SAMPLES.) `S� / SURFACES AND FITTINGS SHALL BE INSPECTED FOR EVIDENCE OF HOLES 843 RI6KE LANE <br /> A GENERAL ENGINEERING "A.. F. SECONDARY PIPE MUST BE PROPERLY GUT. INSPECT ALL PRIMARY OR LEAKAGE. THIS RESULTS OF SUCH INSPECTION SHALL BE ,WEST SACRAMENTOGA 95691 <br /> B. HAZARDOUS MATERIAL SUBSTANCE HANDLING ("HAZ") 8. CONTRACTOR SHALL PLACE EXCAVATED SOIL ON AND SHALL COVER WITH 4 PIPE SURFACES. PRESSURIZE SECONDARY PIPE TO 5 PSI AND SOAP ALL DOCUMENTED IN WRITING, WITH PHOTOGRAPHS WHERE ApROPIRIATE. (916) 37NTO <br /> MIL. PLASTIC UNTIL SOIL 0 REMOVED. SOIL TO BE STOCKPILED ON PIPE 6454-ACE AND FITTINGS. PRE85URE ON THE PIPING SECONDARY PATCH ANY HOLES WITH APPROVED MATERIAL BEFORE TRANSPORTING <br /> 6. 2-1800 <br /> CONTRACTOR SHALL HAVE THE FOLLOWING INSURANCE. CONTRACTOR SHALL SITE FOR SAMPLING PRIOR TO OFF-HAUL BY OTHERS AS DIRECTED BY SPACE16HALL BE MAINTAINED UNTIL AFTER THE PAVING 16 IN PLACE OVER TANKS O D15P05AL SITE. FAX 313-1112 <br /> HAVE PROOF OF SUCH INSURANCE N FILE WITH OWNER BY NAMING OWNER OWNER TANK FiT'LD AND PIPING RUNS,.AND SHALL BE WITNESSEDBY THE OWNER'5 - - <br /> AS "ADDITIONAL INSURED". REPRE6ENTATIVE. TWO SOIL SAMPLES SHALL BE ANALYZED FROM BENEATH THE TANK. ONE THESEDRN.UIFX,SANpbPEOIPIcanCNB,AS <br /> 9. OWNER SHALL PROVIDE FOR TRANSPORTATION AND DISPOSAL OF ALL FROM DIRECTLY BENEATH THE FILL PIPE. THE OTHER FROM A SIMILAR M$TFPRAWiW56A RVIOERICATI",, <br /> IAN T149 <br /> A STATUTORY WORKMAN'$ COMPREHENSIVE LIABILITY EXCAVATED SOIL AFTER COMPLETION OF ANY NECESSARY REMEDIATION, G. AFTER BEING WITNESSED BY OWNER'S REPRESENTATIVE, REMOVE POSITION AT THE OPPOSITE END OF THE TANK IF OBVIOUOLY STAINED PROPERTY CP WALTCN e4NEERMG,INC. <br /> INCLUDING AERATION PRESSURE FROM PRODUCT LINE$ AND AIR FROM SECONDARY LINES AFTER OR CONTAMINATED AREAS EXIST IN LOCATIONS OTHER THAN THE ABOVE *0 $GALL NOT BE USED FOR ANY RRPO$E <br /> B. COMPREHENSIVE GENERAL LIABILITY, WITH A COMBINED SINGLE PAVING 1$ IN PLACE LOCATIONS, THEN ADDI'TIO'NAL SOIL SAMPLES $HALL BE ANALYZED FROM OTHER MHM THOSE FOR WHICH THEY HAVE <br /> BEEN SUPPLIED OR PREPARED.THESE DRA 46 <br /> LIMIT OF NOT LESS THAN 0000,000 PER OCCURRENCE FOR BODILY 10. IF REQUIRED, BACKFILL THE ABANDONED TANK HOLE ONCE ALL SAMPLING THESE OBVIOUSLY STAINED OR CONTAMINATED AREAE. SHALL NOT BE REPRODUCED,COPIED ORTR/�ED <br /> INJURY AND PROPERTY DAMAGE. SHALL BE COMPACTED A MINIMUM OF 90 15 COMPLETED, <br /> MODIFIED PROCTOR VALUE TOLL WIN 23 6 COMPLETE G.C. SHALL EAND PRIOR TO)FINALEST PROJ,ECTT AD CEPTANCE. PRECISIONUCT LINES AFTER SOIL SAMPLES SHALL BE COLLECTED FROM THE NATIVE 501L AT OR WrTHCUT THE 9)(PKII6 WALTON EMNEEH WRITTEN <br /> MCN$ENT d' <br /> C. AUTOMOBILE LIABILITY COVERING USE OF ALL OWNED HIRED 3 FT. OF FIN. GRADE AND 95% MIN FOR REMAINDER G.C. SHALL PROVIDE LINE TEST 641ALL BE IN ACCORDANCE WITH NFPA 329, LOCAL JUST BELOW THE INTERFACE OF THE BACKFILL WITH THE NATIVE SOIL. COPYRIGHT © 1996 <br /> VEHICLES WITH A COMBINED SINGLE LIMIT OF SINGLE UNIT OF LIABILITY BOILS ENGINEER WHO WILL SUPERVISE THE PROCESS AND CERTIFY THAT THE REQUIREMENTS, OR APPROVED EQUAL. TEST SHALL BE CONDUCTED BY A SAMPLE$ SHALL BE TAKEN USING A DRIVEN-TUBE TYPE SAMPLER, <br /> OF NOT LESS THAN 0,000000 PER OCCURRENCE FOR BODILY INJURY AND HOLE WAS COMPACTED PROPERLY, MINIMUM TESTS SHALL BE AT 5', 3', AND CERTIFIED TESTER G.G. SHALL PROVIDE WRITTEN REPORT OF PRECISION CAPPED AND SEALED WITH INERT MATERIALS. FORMAL, SIGNED CHAIN- <br /> PROPERTY DAMAGE. I' BELOW FIN. GRADE, FOR A MINIMUM TOTAL OF THREE COMPACTION TESTS. TEST TO OUNER'5 REPRESENTATIVE PRIOR TO OWNER'S ACCEPTANCE OF OF-CUSTODY RECORDS SHALL BE MAINTAINED FOR EACH SAMPLE AND <br /> PROVIDE 'RESULTS TO OIUJER'5 REPRESENTATIVE W/IN IS DAYS. PROJECT. SUBMITTED WITH THE RESULTS TO THE REGULATING AGENCY. DRAU,N BY MEL <br /> 1. GENERAL CONTRACTOR O FURNISH ALL LABOR MATERIAL, EQUIPMENT, AND <br /> i SERVICES NECESSARY FOR OR REASONABLY INCIDENTAL TO THE If. CONTRACTOR TO INSTALL NEW CANOPY FOOTINGS PER PLANS, 24. CONTRACTOR 6HALL PROVIDE DOCUMENTATION OF A DYNAMIC BACKPRE68URE TO EXPEDITE THE PROCESS OF TANK REMOVAL, THE FOLLOWING - - - -- -- - - <br /> SATISFACTORY COMPLETION OF ALL WORK 51401N ON, CALLED FOR, OR SPECIFICATIONS, AND SHOP DRAWINGS AND ARRANGE FOR ALL TEST OF ALL VAPOR RETURN LINES AS REQUIRED BY LOCAL REGULATIONS. ALTERNATIVE SAMPLING METHOD MAY BE USED: CHKD' BY MEL <br /> REQUIRED BY THE DRAWINGS. INSPECTIONS. PROVIDE CONDUITS FOR LIGHTING AND INTERCOM, AND -- -- - --- <br /> COORDINATE RAIN LEADERS AS NECESSARY. 25. CONTRACTOR SHALL DO ANY OTHER TESTING A$ REQUIRED BY LOCAL A IMMEDIATELY UPON REMOVAL OF THE TANK, A BACKHOE BUCKET OF DATE 30 JUL 98 <br /> 8. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE UNIFORM REGULATIONS. NATIVE SOIL SHALL BE TAKEN FROM THE NATIVE SOIL TWO (2) FEET <br /> BUILDING CODE, UNIFORM FIRE CODE, NATIONAL ELECTRICAL CODE, 12. CONTRACTOR SHALL PLACE SOIL FROM FOOTING EXCAVATION ON, AND SHALL BELOW THE SOIL/BAOKFILL INTERFACE. THIS SOIL SHALL BE RAPIDLY SCALE PLOT FULL <br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS, OSHA COVER WITH, 4 MIL. PLASTIC UNTIL 501L 18 REMOVED. SOIL TO BE 26. CONSTRUCT NEW FUEL ISLANDS A8 SHOWN N DRAWINGS. BROUGHT TO THE SUWACR, <br /> CONSTRUCTION SAFETY ORDERS, AND ANY OTHER APPLICABLE STATE, CITY, STOCKPILED AND SEGREGATED ON BITE FOR SAMPLING PRIOR TO OFF-HAUL <br /> OR COUNTY ORDINANCES. BY OTHERS AS DIRECTED BY OWNER 21. BRAVO BOXES, TURBINE SUMPS, AND OVERFILL BOXES ARE TO BE B. APPROXIMATELY THREE INCHES SHALL BE RAPIDLY SCRAPED AWAY JOB NO. 43510 <br /> COMPLETELY SEALED AND WATER TESTED, A8 EVIDENCE BY OWNER'S FROM THE SURFACE OF THIS SOIL. THEN A CLEAN BRA66 TUBE (AT <br /> 9. PETROL PER11T8 TO BE SECURED BY OWNER AND SUPPLIED TO CONTRACTOR 13. CONTRACTOR TO SCHEDULE AND ARRANGE CANOPY WORK PER DRAWINGS AND REPRESENTATIVE A6 FOLLOWS: LEAST THREE INCHES LONG) SHALL BE DRIVEN INTO THE SOIL WITH A <br /> CONTRACTOR 16 RESPONSIBLE FOR COMPLYING WITH ALL PERMIT SPECIFICATIONS. CONTRACTOR SHOULD BE PRESENT TO COORDINATE SUITABLE INSTRUMENT (WOODEN MALLET, ETC.), REVISIONS <br /> CONDITIONS. ELECTRICAL. INTERCOM, DRAINAGE REQUIREMENTS. 1. FILL WITH WATER TO HIGHEST PENETRATION. <br /> 2. SPRAY PAINT TOP OF WATER C. THE EN08 OF BRASS TUBE SHALL BE COVERED WITH ALUMINUM FOIL, "-- - -"- ""- --""--- -- <br /> 10. GENERAL CONTRACTOR SHALL VISIT 51TE AND FAMILIARIZE HIMSELF OF 14. EXCAVATE AS NECESSARY FOR THE INSTALLATION OF REPLACEMENT TANKS. THEN PLASTIC END CAP5, AND FINALLY WRAPPED WITH A SUITABLE DATE REV DESCRIPTION BY <br /> ALL EXISTING CONDITIONS PRIOR TO SUBMITTING HIS BID. 28. PROVIDE AND INSTALL CONDUIT 1 WIRING FOR PETROLEUM SYSTEM(5) AND TAPE. <br /> 15. CONTRACTOR SHALL COVER EXCAVATED SOIL WITH 4 MIL. PLASTIC UNTIL CANOPY LIGHTING. PROVIDE CONDUIT FOR FUTURE CARDREADERS AND <br /> 11. GENERAL CONTRACTOR SHALL PROTECT ALL EXISTING FACILITIES TO SOIL IB REMOVED. BOIL TO BE STOCKPILED AND SEGREGATED N 817E OTHER SITE ELECTRICAL AS INDICATED ON THE DRAWINGS. D. THE SAMPLE SHALL BE IMMEDIATELY PLACED ON ICE, OR DRY ICE, -- <br /> REMAIN UNLESS NOTED OTHERWISE. CONTRACTOR SHALL REPAIR OR FOR SAMPLING PRIOR TO OFF-HAUL AS DIRECTED BY OWNER FOR TRANSPORT TO A LABORATORY. AGAIN, FORMAL CHAIN-OF-CUSTODY <br /> REPLACE TO THE 8AT18FACTION OF THE OWNER'S REPRESENTATIVE ANY 29. ALL CONDUIT IS TO BE 3/4" (MINIMUM) RIGID CONDUIT. RECORD$ SHALL BE MAINTAINED AND SUBMITTED FOR EACH SAMPLE. <br /> EXISTING FACILITIES THAT ARE DAMAGED BY THE CONTRACTOR'S 16. INSTALL "TYPAR" FILTER FABRIC LINER IN TANK HOLE AND TRENCHES PER IF THE-BOTTOM OF THE TANK 16 BELOW THE GROUNDWATER TABLE, THEN <br /> OPERATIONS. DRAWINGS, WHERE REQUIRED BY LUET-HOLE CONDITIONS, PROVIDE TANK 30. INSTALL MONITORING SYSTEM WITH HYDR06TATIC PROBES, TURBINE SUMP SOIL SAMPLES ARE NOT REQUIRED. N THI5 CASE, A WATER SAMPLE <br /> HOLD-DOUNS AS REQUIRED BY MANUFACTURER IN WET-HOLE CONDITIONS. PROBES, AND TANK GAUGE, AND MONITOR CONTROL PANEL IN BUILDING PER SHALL BE COLLECTED AS BOON AS 100661151-E FROM THE 5URFACE OF <br /> 12. ALL EXCAVATIN8 SHALL BE PERFORMED IN COMPLIANCE WITH OSHA AND DRAWINGS. THE GROUNDWATER IN THE EXCAVATION. A CHECK SHALL INITIALLY BE <br /> STATE REGULATIONS. THE CONTRACTOR 18 REFERRED TO THE 08HA 11. INSTALL 2 - 12000 GALLON TANKS PER DRAWINGS AND CURRENT MADE FOR ANY FREE FLOATING PRODUCT. IF NO FLOATING PRODUCT 18 <br /> BOOKLET, "EXCAVATING AND TRENCHING OPERATIONS", FOR A SAFE WORK MANUFACTURER'S INSTRUCTIONS, WHICH SHALL BE FOLLOWED AT ALL 31, INSTALL NEW GIL15ARCO MPp'S, SINGLE-HOSE DISPENSER$, AND CONSOLE DETECTED, THEN A WATER SAMPLE SHALL BE TAKEN WITH A DEVICE <br /> PRACTICES GUIDE FOR PERFORMING EXCAVATION WORK TIMES, AND SHALL HAVE PRECEDENCE OVER OTHER INSTRUCTIONS. AS INDICATED ON SITE PLAN AND DESCRIBED IN THE EQUIPMENT LIST. DESIGNED TO REDUCE THE LOSS OF VOLATILE COMPONENTS. A BAILER <br /> MANUFACTURER'S CHECKLISTS SHALL BE COMPLETED BY THE CONTRACTOR IS A SUITABLE SAMPLING DEVICE, THE WATER SAMPLE SHALL BE <br /> 13. UPON COMPLETION OF PROJECT, CONTRACTOR SHALL PROVIDE OWNER WITH A8 EACH STEP IS COMPLETED. 'TANK BEDDING AND BACKFILL TO BE PEA 32. INSTALL SITE LIGHTING, IF APPLICABLE, AND/OR ANY OTHER ITEMS AN SHOWN IMMEDIATELY POURED INTO A VOLATILE ORGANIC ANALYSIS (VOA) VIAL <br /> "AS BUILT" DRAWINGS OF ALL ITEMS INSTALLED BY SAME. "AS GUILTS" GRAVEL. TANK BURY 18 TO BE MINIMUM 4 FEET, TANK BEDDING 15 TO BE ON THE DRAWINGS. WITH AS LITTLE AGITATION AS POSSIBLE. A TEFLON SEPTUM SHALL BE <br /> SHALL BE COMPLETED ON-51TE WITH INFORMATION NOTED DIRECTLY N A MINIMUM 12", SPACING BETWEEN TANKS 18 TO BE A MINIMUM OF I8". USED TO SEAL THIS VIAL. A <br /> APPROVED JOB COPY. TANK INTEGRITY TESTING SHALL CONFORM TO MNFR'6. REQUIREMENTS. 33. INSTALL NEW CONCRETE TANK AND DRIVE BLABS AND OTHER CONCRETE A8 <br /> INDICATED ON SITE PLAN. CONCRETE SHALL HAVE A MINIMUM SOIL AND WATER SAMPLES $HALL BE ANALYZED FOR TOTAL C t <br /> 14. CONTRACTOR SHALL PROVIDE A LIST OF 6UB-CONTRACTOR8, IF ANY, WHO 18. INSTALL EQUIPMENT A5 LISTED IN EQUIPMENT L16T INCLUDING COMPRESSIVE STRENGTH AT 28 DAYS OF 2500 1-61. CONCRETE SHALL HYDROCAFOONS BY THE METHODS OUTLINED IN "GUIDELINES FOR SHEET TITLE <br /> i-f- <br /> LE <br /> WILL BE USED N THE PROJECT. SALVAGEABLE EQUIPMENT TO BE REINSTALLED, IF ANY, AND PROVIDE AND CONTAIN 1 POUNDS OF LAMPBLACK PER CUBIC YARD - USE DAVIS 8084. ADDRESSING FUEL LEAK$. CALIFORNIA REGIONAL WATER QUALITY <br /> INSTALL ALL OTHER EQUIPMENT AS REQUIRED TO PROVIDE A COMPLETE CONTROL BOARD, SAN FRANCISCO BAY REGION - SEPTEMBER 1985." <br /> 15. CONTRACTOR SHALL COORDINATE ALL INSPECTIONS AND APPROVALS AND PETROLEUM SYSTEM. 34. REPAIR AND/OR REPLACE A.G. PAVING AND BABE TO MATCH ORIGINAL IN GEN . <br /> E rry .. NOTES , <br /> OBTAIN, AT THE COMPLETION OF THE PROJECT, ALL CERTIFICATES AREAS DISTURBED BY WORK N LOAD TANKS HIGHWAY CARRIER WITH PRESSURE RELIEF HOLE UP ON <br /> REQUIRED TO RUN THE FACILITY. 18. PROVIDE AND INSTALL NEW PRODUCT, VENT, VAPOR AND SECONDARY SAME DAY A$ REMOVAL. UNLESS THE TANK$ HAVE BEEN TRIPLE RINSED, SCOPE , <br /> � � ' <br /> CONTAINMENT LINES PER DRAWINGS. CURRENT MANUPACTURER'S 35. ANY ENVIRONMENTAL WORK REQUIRED OUTSIDE THE ABOVE $COPE. OF WORK THE CARRIER MUST BE A LICENSED WASTE HAULER ANDMANIFESTS <br /> 16. GOVERNING CODES AND STANDARDS INCLUDE, BUT SHALL NOT BE LIMITED NW RUCTIONS SHALL BE FOLLOWED AT ALL TIMES, AND SHALL HAVE $HALL BE DONE ON A TIME AND MATERIAL$ BASIS. RENTAL RECEIPTS, MUST ACCOMPANY THE TANKS. CLOSURE� <br /> TO, THE STANDARDS OF THE FOLLOWING: PRECEDENCE OVER OTHER INSTRUCTIONS. MANUFACTURER'S CHECKLISTS SUBCONTRACTOR INVOICES, MATERIAL RECEIPTS, AND DAILY LABOR TIME <br /> SHALL BE COMPLETED BY THE CONTRACTOR, AS EACH STEP 18 COMPLETED. SHEETS SHALL BE REQUIRED TO SUPPORT GENERAL CONTRACTOR TIME AND 3.0 REMOVAL OF PIPING <br /> AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) MATERIAL INVOICES. SUCH WORK SHALL BE BILLED SEPARATELY. <br /> AMERICAN PETROLEUM INSTITUTE (API) A, PRODUCT PIPING: 2" PRIMARY PIPING WITH 3" CONTAINMENT PIPING TO BE REMOVED SHALL BE EMPTIED OF ALL CONTENTS PRIOR TO <br /> AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) SYSTEM AS APPROVED BY OWNER ALL PIPING AND CONTAINMENT SYSTEMS REMOVAL. PIPING SHALL BE STOCKPILED ON-SITE PRIOR TO DISPOSAL. <br /> UNIFORM BUILDING CODE (UBC) SHALL BE UL APPROVED FOR 100% METHANOL. CONTAINMENT SYSTEM SHALL <br /> NATIONAL ELECTRIC CODE (NEC) BE BY THE SAME MANUFACTURER WITH THE SAME SERIES ADHESIVES VISUALLY INSPECT PIPE TRENCH FOR INDICATION OF LEAKAGE. A SOIL <br /> NATIONAL FIRE PROTECTION AGENCY (NFPA) AND/OR FITTINGS. SAMPLE SHALL BE TAKEN AND ANALYZED FOR EACH TWENTY LINEAL p� <br /> UNDERW'RITER'S LABORATORIES, INC. (UL) FEET OF TRENCH IF INSPECTION OF TRENCH REVEALS EVIDENC£ OP C <br /> CALIFORNIA CODE OF REGULATIONS (CCR) LEAKAGE. FOLLOW PROCEDURE LISTED IN SECTION 2.1 FOR SAMPLING <br /> LOCAL ORDINANCES AND ANALYSIS. <br /> OF 7 SHEETS <br />