<br /> MATERIAL AND WORKMANSHIP OWNER SUPPLIED EQUIPMENT W N �u
<br /> I. UNLESS OTHERWISE SPECIFICALLY PROVIDED IN THESE DOCUMENTS, ALL 16. GOVERNING CODES AND STANDARDS INCLUDE, BUT SHALL NOT BE LIMITED B: VENT/VAPOR PIPING: RED THREAD IIA AND RED THREAD 11 WITH PLEASE REFER To SEPARATE EQUIPMENT LIST. W O
<br /> EQUIPMENT, MATERIAL, AND ARTICLES INCORPORATED IN THE WORK TO, THE STANDARDS OF THE FOLLOWING: FITTINGS AND DS--1000 AND DS-8000 SERIES ADHESIVE, OR AMERON 0r
<br /> COVERED BY THESE DOCUMENTS ARE TO BE NEW AND OF THE MOST SUITABLE DUALOY 3000/LCX WITH ALCOHOL FITTINGS AND P5X34 ADHESIVE. Z Z mF-
<br /> GRADE FOR THE PROCESS INTENDED. UNIFORM FIRE CODE (UFC) DO NOT MIX DIFFERENT MANUFACTURER'S MATERIALS. O
<br /> AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
<br /> 2. THE CONTRACTOR SHALL FURNISH TO THE OWNER'S AGENT FOR HIS AMERICAN PETROLEUM INSTITUTE CAPI) C: PERSONS INSTALLING PIPING MUST BE CERTIFIED AS HAVING BEEN by
<br /> APPROVAL THE NAME OF THE MANUFACTURER, THE MODEL NUMBER, AND AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) TRAINED BY MANUFACTURER. N �
<br /> OTHER IDENTIFYING DATA AND INFORMATION RESPECTING THE UNIFORM BUILDING CODE (UBC)
<br /> PERFORMANCE, CAPABILITY, NATURE, AND RATING OF THE MACHINERY AND NATIONAL ELECTRIC CODE (NEC) D: STEEL PIPE: ALL METAL PIPING SHALL BE BLACK IRON SCHEDULE
<br /> MECHANICAL AND OTHER EQUIPMENT WHICH THE CONTRACTOR CONTEMPLATES NATIONAL FIRE PROTECTION AGENCY (NFPA) 40, OR EXTRA STRONG. GALVANIZED PIPE IS NOT ALLOWED. FITTINGS
<br /> INCORPORATING IN THE WORK WHEN REQUIRED 15Y THE OWNERS AGENT. UNDERLURITER'S LABORATORIES, INC. (UL) SHALL BE 300 PSI MALLEABLE IRON. tu3
<br /> CALIFORNIA (REGULATIONS
<br /> 3. WHEN REQUIRED BY THESE DOCUMENTS OR WHEN CALLED FOR BY THE LOCAL ORDINANCES E: ALL STEEL PIPE BELOW GRADE 15 TO BE DOUBLE WRAPPED WITH 20
<br /> OWNER'S AGENT, THE CONTRACTOR SHALL FURNISH THE AGENT FOR MIL. PVC PIPE WRAP, OVER A PIPE WRAP PRIMER FOR USE WITH VINYL
<br /> APPROVAL FULL INFORMATION CONCERNING THE MATERIAL OR ARTICLES 1l. SAFETY PLAN: CONTRACTOR SPALL DEVELOP AND MAINTAIN FOR THE TAPES, AND SHALL BE 15Y THE SAME MANUFACTURER AS THE WRAP.
<br /> WHICH HE CONTEMPLATES INCORPORATING IN THE WORK. WHEN SO DURATION OF THE CONTRACT A SITE HEALTH 4 SAFETY PLAN THAT WILL
<br /> DIRECTED, SAMPLES MAY BE SUBMITTED FOR APPROVAL AT THE EFFECTIVELY' INCORPORATE AND IMPLEMENT REQUIRED SAFETY PROVISIONS, F: ,ALL THREADED CONNECTIONS SHALL BE THREADED WITH SEALANT
<br /> CONTRACTOR'S EXPENSE, WITH ALL SHIPPING CHARGES PREPAID. AND: WHICH SHALL BE CURRENTLY WARRANTED BY MANUFACTURER FOR FULL
<br /> COMPATIBILITY WITH THE PIPING MATERIAL USED, AND FOR USE WITH
<br /> 4. MACHINERY, EQUIPMENT, MATERIAL, AND ARTICLES INSTALLED OR USED A. APPOINT" AND EMPLOYEE AS THE SAFETY OFFICER WHO IS QUALIFIED PETROLEUM SOLVENTS, FUELS, OILS, DIESEL, AND i00% METHANOL, WHICH Z �i
<br /> WITHOUT REQUIRED APPROVAL SHALL BE AT THE RISK OF SUBSEQUENT AND AUTHORIZED TO SUPERVISE AND ENFORCE COMPLIANCE WITH THE SHALL BE VERIFIED BY CURRENT MANUFACTURER'S PRODUCT DATA SHEET. W � } � U � �
<br /> REJECTION. HEALTH AND SAFETY PLAN. SUBMIT THE NAME AND QUALIFICATIONS OF
<br /> THE SAFETY OFFICER t0 THE OWNER'S AGENT PRIOR TO COMMENCING WORK G: G.C. SHALL DEMONSTRATE TO OWNER'S REPRESENTATIVE THAT ALL
<br /> 5. ALL WORK TO BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND ON THE SITE. MATERIALS ARE NEW AND CONFORM TO ABOVE SPECIFICATIONS. W W = U U
<br /> REGULATIONS. J �. X () 51
<br /> B: THE PLAN SHALL CONTAIN THE NAMES, ADDRESSES AND TELEPHONE 11. DO NOT PLACE PRODUCT PIPING UNDER BUILDINGS. PIPING RUNS OVER � O m Cq LU U
<br /> 6. ALL MATERIALS SHALL BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS NUMBERS OF THE SUPERVISORY PERSONNEL, THE HOSPITAL FACILITIES TANKS SHALL BE MINIMIZED. MAINTAIN MINIMUM CLEARANCE AS REQ'D. BY W or ca 0
<br /> AND THESE DOCUMENTS. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION NEAREST THE SITE, AND A MAP TO THE HOSPITAL. PROCEDURES SHALL BE MNFR. MINIMIZE CROSSING OTHER LINES AND CONDUIT. IF PIPING Le O
<br /> OF THE OWNER'S AGENT/ENG NEER. WRITTEN IN THE PLAN FOR ACTIONS TO BE TAKEN SHOULD STRANGE ODORS IS NOT SHOWN ON SITE PLAN, G.C. SHALL RUN LINES THE MOST DIRECT V LU Q r m 4l
<br /> OR HAZARDOUS SUBSTANCES BE UNCOVERED. ROUTE SUBJECT TO APPROVAL BY OWNER'S REPRESENTATIVE.
<br /> -1. IF ANY OF THESE DOCUMENTS INDICATE A CONFLICT WITH THE STATE OR
<br /> LOCAL REQUIREMENTS AS ARE CURRENTLY IN EFFECT AT THE TIME OF THIS C: IF, DURING THE COURSE OF THE WORK, UNSAFE CONDITIONS DEVELOP 12. CONSTRUCT NEW FUEL ISLANDS AS SHOWN ON DRAWINGS. Q 0 (P
<br /> PROJECT, IT is EXPECTED THAT THE MOST RESTRICTIVE CONDITION(S) OR ARE ENCOUNTERED, TAKE IMMEDIATE MEASURES TO CORRECT THE
<br /> WOULD APPLY_ NOTIFY THE ARCHITECT OF ALL CONFLICTS. CONDITION. IF THE CORRECTIVE ACTION IS INSUFFICIENT IN THE 13. PROVIDE AND INSTALL CONDUIT 4 WIRING FOR PETROLEUM SYSTEM(S) _ A
<br /> OPINION OF THE OWNER'S AGENT, CONSTRUCTION WORK SHALL CEASE UNTIL AS INDICATED ON THE DRAWINGS. Q Q
<br /> CORRECTIVE ACTION CAN BE IMPLEMENTED. Ql Hi
<br /> GENERAL CONDITIONS 14. ALL CONDUIT 16 TO BE 3/411, MINIMUM. -++* E
<br /> D: PROVIDE" A MINIMUM OF TWO FIRE EXTINGUISHER'S WITH A MINIMUM z
<br /> I_ CONTRACTOR EMPLOYEES TO HAVE COMPLETED 40 HOURS OSHA TRAINING CLASS RATING OF 2-A,20-5:C WITHIN 50 FEET OF THE OPERATION. 15. INSTALL MONITORING SYSTEM WITH ANNULAR SPACE PROBES, TURBINE AND , (�
<br /> COURSE PRIOR TO THE START OF WORK CERTIFICATION OF THIS MUST BE DISPENSER SUMP PROBES, TANK GAUGES, ALARMS, AND MONITOR CONTROL
<br /> PROVIDED t0 THE OWNER'S ENGINEER PRIOR TO THE START OF WORK. 18. UNDERGROUND SERVICE ALERT (U.S.A.) - THE CONTRACTOR SHALL NOTIFY PANEL IN 1.3UILDfNG PER DRAWINGS.
<br /> MEMBERS OF U.S.A. 2 FULL WORKING DAYS IN ADVANCE OF PERFORMING
<br /> 2. CONTRACTOR EMPLOYEES TO HAVE COMPLETED THE PIPING MANUFACTURER's ANY EXCAVATION WORK BY CALLING THE TOLL-FREE ONE-CALL PROGRAM 16. INSTALL NEW DISPENSERS, AND MISC. PETROLEUM SYSTEMS, AS INDICATED
<br /> TRAINING REQUIREMENTS IN ACCORDANCE WITH CALIFORNIA UST NUMBER (800) 227-2600. ON PLANS AND DESCRIBED IN THE OWNER'S EQUIPMENT LIST.
<br /> REGULATIONS. CERTIFICATES SHALL BE PROVIDED TO OWNER.
<br /> CONTRACTOR SHALL COMPLETE THE PIPING INSTALLATION CHECKLIST IT INSTALL NEW CONCRETE TANK AND DRIVE SLA55 AND OTHER CONCRETE A$
<br /> SUPPLIED PIPING MANUFACTURER AND SHALL FURNISH THE CHECKLIST TO PETROLEUM WORK SCOPE INDICATED ON SITE PLAN. CONCRETE SHALL HAVE A MINIMUM 0
<br /> OWNER. COMPRESSIVE STRENGTH AT 28 DAYS OF 2500 PSI. CONCRETE SHALL !U Q
<br /> 1. PRIOR TO THE START OF WORK, PROVIDE OWNER WITH WORK PLAN AND OTHERWISE COMPLY W/ CONCRETE DESIGN AS SPECIFIED IN CIVIL/ARCH DOGS_ w
<br /> 3. CONTRACTOR TO HAVE BEEN TRAINED AND CERTIFIED BY THE TANK SCHEDULE THIAT COORDINATES SCHEDULING WITH OTHER PORTIONS OF G.C. SHALL COORDINATE CONCRETE SLAB WORK W/ PETROLEUM CONTRACTOR
<br /> MANUFACTURER IN CORRECT TANK INSTALLATION IN ACCORDANCE WITH THE PROJECT TO THE FULLEST EXTENT POSSIGLE. OR PETROLEUM SUBCONTRACTOR N tu
<br /> CALIFORNIA UST REGULATIONS. CERTIFICATES SHALL BE PROVIDED TO
<br /> OWNER. CONTRACTOR SHALL COMPLETE THE TANK INSTALLATION CHECKLIST 2. G.C. SHALL FENCE OFF WORK AREA WITH (o' HIGH CHAIN LINK FENCE_ POST "KEEP
<br /> SUPPLIED TANK MANUFACTURER AND SHALL FURNISH THE CHECKLIST t0 OUT" SIGNS ON FENCE EVERY 30 FEET. AT THE END OF EACH WORK DAY TESTING '
<br /> OWNER. SECURE FENCING PANELS TOGETHER. I. ALL TESTING SHALL COMPLY WITH MANUFACTURER'S INSTRUCTIONS, TRADE � � � Ica JU O
<br /> 4. CONTRACTOR TO DEVELOP A SPECIFIC SITE SAFETY PLAN FOR TANK STANDARDS AND GOVERNING RULES AND CODES, INCLUDING THE USE OF a U Q O -A _t
<br /> INSTALLATION PRIOR TO THE START 01= WORK 3. EXCAVATE AS NECESSARY FOR THE INSTALLATION OF NEW TANKS- CERTIFIED AND APPROVED INDEPENDENT THIRD PARTY TESTERS, WHEN
<br /> CONTRACTOR WILL CONDUCT WEEKLY JOB SITE SAFETY MEETINGS WITH IT'S RE0UI=D.
<br /> EMPLOYEES AND THE MEETING MINUTES WILL BE SUPPLIED t0 OWNER. 4- WHEN SOIL IS TO 13E STOCKPILED ON SITE FOR SAMPLING PRIOR TO OFF-HAUL, IR
<br /> CONTRACTOR SHALL PLACE EXCAVATED SOIL ON AND SHALL COVER WITH 4 2. FULLY T.7ST ALL SYSTEMS, AND REPAIR AS NECESSARY. SECURE ALL
<br /> 5. CONTRACTOR SHALL HAVE THE FOLLOWING LICENSES: MIL. PLASTIC (UNTIL SOIL IS REMOVED, IN AREA APPROVED GY OWNER / G.C. REQUIRED TESTS, INSPECTIONS, AND APPROVALS OF THE COMPLETED
<br /> SYSTEM. MAKE ALL REQUIRED ADJUSTMENTS AND CORRECTIONS. z
<br /> A. GENERAL ENGINEERING
<br /> 5. GENERAL CONTRACTOR SHALL PROVIDE FOR DISTRIBUTION OF ALL 0 ' o �
<br /> EXCAVATED SOIL, PER GENERAL PROJECT REQUIREMENTS.
<br /> B. HAZARDOUS MATERIAL SUBSTANCE HANDLINCx 3. THE PIPING SYSTEM SHALL. BE TESTED PER CURRENT MANUFACTURER'S J ui It
<br /> INSTRUCTIONS_ 0W � w n Z co
<br /> 6. CONTRACTOR SHALL HAVE THE FOLLOWING INSURANCE. CONTRACTOR SHALL 6 ,A
<br /> - INSTALL "TYPR" FILTER FABRIC LINER IN TANK HOLE AND TRENCHES, d) C-4
<br /> O e
<br /> HAVE PROOF OF SUCH INSURANCE ON FILE WITH OWNER BY NAMING OWNER WHERE REQUIRED BY WET-HOLE CONDITIONS. PROVIDE_ TANK HOLD-DOWNS 4. CONTRACTOR SHALL PROVIDE ENHANCED LEAK DETECTION (E.L.D.) TEST ON Uj = 0 d) C U 0
<br /> AS REQUIRED BY MANUFACTURER IN WET-HOLE CONDITIONS. SYSTEM AFTER PAVING 1S COMPLETE AND PRIOR TO FINAL PROJECT
<br /> AS "ADDITIONAL INSURED". O Z0
<br /> ACCEPTANCE. TEST SHALL BE CONDUCTED BY A CERTIFIED TESTER. O Z c�
<br /> -1. INSTALL TANKS PER DRAWINGS AND CURRENT MANUFACTURER'S INSTRUCTIONS, CONTRACTOR SHALL PROVIDE WRITTEN REPORT OF E.L.D. TEST TO OWNER'S LL � �
<br /> A. STATUTORY WORKMAN'S COMPREHENSIVE LIABILITY
<br /> WHICH SHALL a. r= FOLLOWED AT ALL TIMES, AND SHALL HAVE PRECEDENCE REPRESENTATIVE PRIOR To OWNER'S ACCEPTANCE OF PROJECT. d
<br /> Bs COMPREHENSIVE GENERAL LIABILI'T'Y, WITH A COMBINED SINGLE OVER OTHER INSTRUCTIONS. MANUFACTURER'S CHECKLISTS SHALL 5rz u- Z O
<br /> LIMIT OF NOT LESS THAN s1,000,000 PER OCCURRENCE FOR BODILY COMPLETED BY THE CONTRACTOR, AS EACH STEP 16 COMPLETED, 5. PROVIDE A STATIC PRESSURE (LEAK DECAY) TEST, ACCORDING TO THE BAY W 0 �
<br /> INJURY AND PROPERTY DAMAGE. TANK BEDDING AND BACKFILL TO BE PEA GRAVEL. TANK BEDDING IS TO BE AREA AIR QUALITY MANAGEMENT DISTRICT (5AAQMD) MANUAL OF "t Z
<br /> A MINIMUM 12". TANK INTEGRITY TESTING SHALL CONFORM TO MNFR'S. REQS. PROCEDURES, SOURCE TEST PROCEDURE ST-30 OR GARB PROCEDURE cp V <[
<br /> C. AUTOMOBILE LIABILITY COVERING USE OF ALL OWNED HIRED CONTRACTOR SHALL NOTIFY OWNER'S REPRESENTATIVE: TWO WORKING DAYS TP-201. () d)
<br /> VEHICLES WITH A COMBINED SINGLE LIMIT OF SINGLE UNIT OF LIABILITY PRIOR TO TANK ARRIVAL. OWNER'S REP. SHALL WITNESS ALL TANK TESTING Ir-
<br /> OF NOT LESS THAN $1,000,000 PER OCCURRENCE FOR BODILY INJURY AND AT HIS/HER DISCRETION. 6. PROVIDE DOCUMENTATION OF A DYNAMIC BACKPRESSURE TEST OF ALL
<br /> PROPERTY DAMAGE. VAPOR RETURN LINES ACCORDING TO BAAQMD PROCEDURE ST-21 OR CARE
<br /> S. PETROL CONTRACTOR TO INSTALL NEW PETROL ELECTRICAL SYSTEMS PER PROCEDURE TP-201, OR AS REQUIRED 15Y LOCAL REGULATIONS.
<br /> 71. CONTRACTOR TO FURNISH ALL LABOR, MATERIAL, EQUIPMENT, AND PLANS AND MANUFACTURER'S REQUIREMENTS. ARRANGE FOR ALL
<br /> SERVICES NECESSARY FOR OR REASONABLY INCIDENTAL TO THE INSPECTIONS. PROVIDE CONDUITS/W[RING, J-BOXES, ETC. REQUIRED FOR 1. PROVIDE LIQUID REMOVAL TEST FOR BALANCE SYSTEMS (GASOLINE) WITH A
<br /> SATISFACTORY COMPLETION OF ALL WORK SHOWN ON, CALLED FOR, OR COMPLETE ELECTRICAL SYSTEMS. LIQUID REMOVAL DEVICE REQUIRED BY A CARE EXECUTIVE ORDER„ IF MORE
<br /> REQUIRED BY THE DRAWINGS, EXCEPT AS NOTED BY OTHERS. THAN 300,,ML OF LIQUID IS FOUND IN THE VAPOR PATH. THIS SHALL BE
<br /> 9. INSTALL EQUIPMENT AS LISTED IN OWNER'S EQUIPMENT LIST AND PROVIDE DETERMINED BY LOWERING THE GASOLINE DISPENSING NOZZLE INTO A
<br /> 8. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE UNIFORM AND INSTALL ALL OTHER EQUIPMENT AS REQUIRED TO PROVIDE A CONTAINER AND DRAINING ALL LIQUID, THEN MEASURING THE AMOUNT OF
<br /> BUILDING CODE, UNIFORM FIRE CODE, NATIONAL ELECTRICAL CODE, COMPLETE PETROLEUM SYSTEM. LIQUID USING A GRADUATED CYLINDER OR BEAKER. IF REQUIRED, THE
<br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS, OSHA LIQUID REMOVAL TEST SHALL BE CONDUCTED AND PASSED ACCORDING TO
<br /> CONSTRUCTION SAFETY ORDERS, G.A.R.33. EXECUTIVE ORDERS GUIDANCE LETTERS,
<br /> 10. PROVIDE AND INSTALL NEW PRODUCT, VENT, VAPOR, AND SECONDARY GARB TEST PROCEDURE TP-201. >AND ANY OTHER APPLICABLE CONTAINMENT LINES PER DRAWINGS. CURRENT MANUFAC:TURAPPLICABLE STATE, CITY, OR COUNTY ORDINANCES. INSTRUCTIONS SHALL BE FOLLOWED AT ALL TIMES, AND SHALL HAVE 8. PROVIDE STATIC TORQUE TEST OF ROTATABLE PHASE I VAPOR ADAPTERS
<br /> S. ALL PERMITS TO BE SECURED BY OWNER OR OWNER'S AGENT AND SUPPLIED TO PRECEDENCE OVER OTHER INSTRUCTIONS. MANUFACTURERS CHECKLISTS ACCORDING TO GARB PROCEDURE TP-201,
<br /> CONTRACTOR, WHO IS RESPONSIBLE FOR COMPLYING WITH ALL PERMIT SHALL BE COMPLETED BY THE CONTRACTOR, AS EACH STEP IS COMPLETED_
<br /> CONDITIONS. S. PROVIDE LEAK RATE LEST OF OVERFILL PREVENTION DEVICE ACCORDING TO ui
<br /> A: PRODUCT PIPING: PRIMARY PIPING WITH CONTAINMENT SYSTEM CARE PROCEDURE TP-201,
<br /> 10. CONTRACTOR S9-TALL VISIT SITE AND FAMILIARIZE HIMSELF OF RED THREAD IIA AND RED THREAD 11 WITH FITTINGS AND A
<br /> ALL EXISTING CONDITIONS PRIOR D SUBMITTING HIS BID. DS-'1000 AND DS-8000 SERIES ADHESIVE, OR AMERON DUALOY 10. PROVIDE LEAK RATE TEST OF PRESSURE/VACUUM VENT VALVES ACCORDING
<br /> 3000/LCX WITH ALCOHOL FITTINGS AND PSX34 ADHESIVE. DO NOT MIX TO GARB PROCEDURE TP-203.
<br /> 11. CONTRACTOR SHALL PROTECT ALL EXISTING FACILITIES TO DIFFERENT MANUFACTURER'S MATERIALS. ALL PIPING AND CONTAINMENT
<br /> SYSTEMS SHALL BE UL APPROVED FOR 100% METHANOL. CONTAINMENT I1. PROVIDE ALL OTHER TESTING AS REQUIRED BY STATE AND LOCAL
<br /> REMAIN UNLESS NOTED OTHERWISE. CONTRACTOR SHALL REPAIR OR � �
<br /> SYSTEM SHALL BE BY THE SAME MANUFACTURER, WITH THE SAME SERIES REGULATIONS, MANUFACTURER REQUIREMENTS, AUTHORITIES TO CONSTRUCT, d z > o
<br /> REPLACE TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE ANY ADHESIVES AND/OR FITTINGS. EXECUTIVt ORDERS AND APPROVAL LETTERS, INCLUDING REQUIREMENTS OF 5 _L
<br /> EXISTING FACILITIES THAT ARE DAMAGED BY THE CONTRACTOR'S I �-
<br /> OPERAtIONS. VERA KATION AND REVERIFICATION TESTING AFTER SYSTEM OPERATION ul
<br /> w uE o o
<br /> � ckEE
<br /> 12. ALL EXCAVATIONS SHALL BE PERFORMED IN COMPLIANCE WITH OSHA AND , � J Z ® z w
<br /> Y_ Lu
<br /> STATE REGULATIONS. Q O ' W o w Q
<br /> 13. UPON COMPLETION OF PROJECT, CONTRACTOR SHALL PROVIDE OWNER WITH o u q�`d
<br /> "AS GUILT" DRAWINGS OF ALL ITEMS INSTALLED BY SAME. "AS GUILTS" W z w�z w aua
<br /> SHALL BE COMPLETED ON-SITE WITH INFORMATION NOTED DIRECTLY ON 1.0 Z 0 D �,4 41 o I f D
<br /> APPROVED JOB COPY. lu
<br /> W Z to_ o o 6 o�
<br /> 14. CONTRACTOR SHALL PROVIDE A LIST OF SUB-CONTRACTORS, IF ANY, WHO (3O Q F -4 a-4 p w O
<br /> -3 V 0 ►u�
<br /> WILL BE USED ON THE PROJECT. V
<br /> Q-1-
<br /> Q z U
<br /> 15. CONTRACTOR SHALL COORDINATE ALL INSPECTIONS AND APPROVALS AND ��$�� zc�j�
<br /> OBTAIN, AT THE COMPLETION OF THE PROJECT, ALL CERTIFICATES
<br /> REQUIRED TO RUN THE FACILITY.