Laserfiche WebLink
0 5 10 15 --• <br /> _ w <br /> GRAPHIC _ <br /> Af w UNDERGROUND PIPING GENERAL NOTE.L_ <br /> p - <br /> 1. SHELL SERVICE STATION SPECIFICATIONS ARE TO BE FOI_I OWED <br /> FOR ALL WORK PERFORMED AT THIS SITE <br /> 2. ALL WORK, INCLUDING PLUMBING AND ELECTRICAL, SHALT_ BF <br /> PERFORMED IN ACCORDANCE Willi LOCAL ADOPTED DUILUING <br /> P"OPERTY LINE --__ CODES AND SUPPLEMENTARY ORDINANCES, AU_ AS DIRECTED BY <br /> COMPANY REPRESENTATIVE. <br /> 9 f C 20� 48, SSI° - -- CONTRACTOR IS TO VERIFY ALL DIMENSIONS AND CONDITIONS AT <br /> THE SITE. NOTIFY COMPANY REPRESENTATIVE OF ANY DISCREPANCIES <br /> BETWEEN SITENDAND INFORMATION SHOWN ON DRAWINGS, <br /> - PRIOR1PRIORTO COMMEENCINGNG WORK <br /> - - _ 4, ALL BACKFILL OF UTILITY 1RENfIHES TO BL CLEAN WASHED SAND. <br /> "pfd <br /> S. "PIPING. A.O. SMITH RED THREAD 11 DOUBLE-WALL (PRODUCT). <br /> SINGLE-WALT_ (VENT/VAPOR), <br /> G. CONTRACTOR SHALL PROVIDE A COMPLETE FUNCTIONING FUEL. <br /> DISPENSING SYSTEM MEETING THE LETTER AND INTENT OF THESE <br /> PLANS AND SPECIFICATIONS. <br /> 1. TANKS: 2-15,000 GALLON XERXES UNDERGROUND DOUBLE- <br /> ' / \ WALL FIBERGLASS TANKS (TANKS 10' DIAMETER) <br /> / \ 8. INSTALL 8" REINFORCED CONCRETE SLAB OVER. TANKS. SET MANHOLE <br /> COVERS 1 1/2" ABOVE SLAB. GRADE TO DRAIN. <br /> 9. ALL FIFIINGJ AND OFENINGS SHALL UE SLCONUARII'f CONIAINTh <br /> \ PER TANK MANUFACTURER , SPECIFICATIONS. <br /> m <br /> ' NEW 6" RE-INFORCED \ 10. ALL FILL BOXES TO BE 15 GALLONS MINIMUM & WATERTI,F <br /> 7e9 n ' NEW MULTI-PRODUCT GASOLINE CONCRETE DRIVE-SLAB \ \ — EXISTING VENT RISERS TO 1' ABOVE SURFACF. (TYPICAL FOR PHASE 1 VAPOR RF.CnVERY) <br /> CCH DISPENSER w/ CARD READERS, REMAIN, REMOVE ANY RISERS <br /> BLENDERS, SINGLE HOSE EACH EXISTING CANOPY NO LONGER IN USE. t1, nU. MANHOLE COVERS 70 HE WATERTIGHT <br /> SIDE, & VAPOR VAC NOZZLES. LEGEND !2. INSTALL 2-3/4 H.P. SUB-PUMPS WITH A.P.I. DETECTORS. <br /> (TYPICAL OF 4 DISPENSERS) TO REMAIN \ <br /> EXISTING LUBE BAY \ NEW UNDERGROUND 2"m 13. INSTALL 2-2"0 DOUBLEWALL FIBERGLASS UNDERGROUND PRODUCT <br /> BUILDING TO REMAIN <br /> DOUBLE WALL (SLOPE 5 UNITS <br /> EQUIPMENWITH <br /> T PRESSURE <br /> LIST & SPECIFICATIONS FORFOR ICK COMPLETE (EQUIPMENT <br /> rt d <br /> PRODUCT LINE SLOPE 1/4" LISTING ATTACH LIQUID PROBE LEAK MONITOR, WITI4 PIPING SUMP <br /> n a PER 12" MIN. UPWARD FROM <br /> > !m� ;o ° l ° ° n h ° 8 ° °� EXISTING CANOPY COLUMN TANTO 10 TANKS. <br /> a TO REMAIN (TYP, OF 2) -. NEW UNDERGROUND FIBERGLASS I4, INSTALL 1-3"0 UNDERGROUND SINGLE-WALL F'IBERGIASS VAPC`R <br /> d 4 VENT/VAPOR LINES 2 0 OR 3"m RECOVERY LINE, MANIFOLD FROM MULTI PRODUCT DISPENSERS <br /> (SLOPE 1/4' PER 19 MIN. TO REGULAR UNLEADED TANK <br /> W d ° S e i d \ UPWARD FROM TANK PIPING <br /> w ° ��q _ 15. INSTALL 2-2"0 UNDERGROUND SINGLEWALL FIBERGLASS VENT <br /> rr } <° ti\Y ,a ° :� TO BE 3' AFTER MANIFOLD OF LINES ONE FROM EACH TANK 70 VENT RISERS.) <br /> d e I d ° \ THE VAPOR RECOVERY LINES. <br /> o n : e - ° - NEW 5 x 13' CONCRETE SLOPE 1/4" PER EACH <br /> MINIMUM BACK TO TANKS, <br /> °' a ° "DOGBONE" PUMP ISLAND EXISTING VENT RISER <br /> d I _ ° + ° + (TYPICAL OF 2) TO REMAIN 16. SLOPE ALL NEW PRODUCT/VAPOR RECOVERY PIPING i/A" <br /> PER FOOT MINIMUM BACK TO TANKS. <br /> gs9 .o a Z e a °a° l a I.' VR VAPOR RETURN <br /> l 3 o J °° 17. EXCAVATION FOR TANKS SHALL BE PER OSHA REOUIRMFHTS. <br /> ss� ° R REGULAR UNLEADED <br /> 18 . PROVIDE DEADMEN & STRAPS PER DRAWING (I TP-8 ! <br /> Of A tl <br /> LU 19 PROVIDE TANK SHORING. (NNOTF, 1QLDIANIETFR TANKS) <br /> CL P p_._ 01 P PREMIUM UNLEADED <br /> R`� _� __ QTR_ .- 20. GENERAL CONTRACTOR SHALL FURNISH & INSTALL DEAF!MAN <br /> ° 0- --VR HOLD DOWNS FOR ALL TANKS IN ACCORDANCE WAIL DETAILS <br /> ,v a ° I ON TANK DRAWINGS. IT IS CRITICAL THAT YOU MEET THE CROSS <br /> J NEW CONCRETE <br /> ' lSECTIONAL DESIGN & REINFORCEMENT REQUIREMENTS. IF YOU <br /> NEW 3°0 VAPOR RECOVERY ELECT TO USE PRE-FABRIC CONCRETE DEADMAN HOLD DOWN <br /> PIPING (SLOPE 1/4" PER FOOT M UNITS, SHELL REQUIRES ENGINEERING CALCOI..AIIONS TO CONFIRM <br /> MIN. UPWARD FROM TANK) M THAT SYSTEM IS EQUAL. TO SHELL'S DESIGN. <br /> NEW 26'-0" CONCRETE <br /> TANK SLAB l TO RING CANOPY LU 21, ALL TESTING REQUIREMENTS (TANKS, LINES, BLOCKAGE THE TEST, <br /> EXISTPRESSURE DECAL, CALIBRATION, ETC.) SHALL BE THE RESPONSIBILITY <br /> OF THE GENERAL CONTRACTOR & INCLUDED IN BASE BID, NO <br /> l 7. EXCEPTIONS. <br /> l a a EXISTING CANOPY COLUMN J l 7 22 JlH-LINE PRESSURE MONITOR NOT REQUIREQ <br /> TO REMAIN (TYP. OF 2) o <br /> d <br /> 11 (� � 11 <br /> ((( I <br /> NEW 2"m DOUBLE-WALL II ° NEW 6 RL INFORCED a SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> FIBERGLASS PRODUCT PIPING 0 0 y I I ° ° ° ' CONCRETE DRIVE SLAB <br /> SLOPE 1/4" PER FOOT MIN. z REQUIRED INSPECTION[. <br /> UPWAFO FROM TANK) l II o ll ll ll ra- ( 1 ° R + P o <br /> rc !,i l < �.J 1n - 2" FIBERGLASS <br /> Q a o w MIEW 3 x 2 REDUCER ° VAPOR PIPING <br /> I,! ? a 4 ALL APPOINTMENTS FOR INSPECTIONS MUST BE MADE AT LEAST 48 HOURS IN ADVANCE <br /> sw u FITTING (TYPICAL) SEE ° ° m FROM DISPENSERS-- <br /> °J �yXy� I[��X'1 z [DETAIL THIS PAGE <br /> < FOR THE FOLLOWING: 3" FIBERGLASS TEE <br /> l ll Il Ila = it oo d P ° ' �' NEW 5 'X 13' CONCRETE'S A. PRIMARY AND SECONDARY TANK(S) SHALL DE TESTED PNEUMATICALLY AT 3-5 P.S.I. -3" x 2" <br /> e y� <br /> o d ° I DOGBONE' PUMP ISLAND - FOR ONE HOUR ONE-HALF HOUR FOR PRIMARY TANK AND ONE-HALF HOUR FOR FIBERGLASS <br /> p (TYPICAL OF 2) * o SECONDARY TANK DOUBLE WALLED TANKS ARE EXEMPT IF ANNULAR SPACE IS BUSHINGS <br /> 9 R n S ° UU MONITORED USING EITHER PRESSURE OR VACUUM TESTING. (ALL EXTERNAL CONNECTIONS <br /> II g o N SHALL BE SOAP TESTED WHILE UNDER PRESSURE). <br /> E--Vfa— 11 z INEW 2"m VAPOR RECOVERY I ° d ° I NEW 6" REINF. CONE. DRIVE SLAB N -� <br /> 3.0 VAPOR RECOVERY-� � - � // (PIPING (SLOPE 1/4" PER FT� a I° °,� -° d° z B. PRESSURE PIPING SHALL BE HYDROSTAIICALLY TESTED TO 1507 OR PNEUMATICALLY TESTED <br /> MANIFOLD �.,,� / IMIN. UPWARD FROM TANK) ° ° d ' I NEW MULTI- PRODUCT GASOLINE. TO 710% OF MAXIMUM ANTICIPATED SYSTEM PRESSURE BUT NOT LESS THAN 5 LBS <br /> ¢ DISPENSER w] CARO READERS, + PER SQUARE INCH AT THE HIGHEST POINT OF THE SYSTEM FOR A MINIMUM OF 20 MINUTES, <br /> �(2) NEW 72 SINGLE-WALL - j ° ° ° BLENDERS, S'NGLE HOSE EACH < 3" FIBERGLASS <br /> GALVANIZED VENT RISERS I SIDE & VAPOR VAC NOZZLES. I C. ALL LINES OTHER THAN PRESSURE PIPING SHALL BE PRESSURE TESTED AT NOT LESS THAN VAPOR <br /> �(GQNNEG7 TO NEW RESP. VENT // z (2) INEW 15,000 GALLON; _4 ° (TYPICAL CF 4 DISPENSERS) n 3 P.S.I. AND NOT MORE THAN 5 P.S.I. FOR A MINIMUM OF 20 MINUTES AND SOAP TESTED PIPING TO <br /> LINES, SECURE TO NEW VENT UNDIERGROUND "XERXES" W111LE UNDER PRESSURE, <br /> TANKS <br /> STAND & EXTF_ND 12'-0" MIN. o <br /> DOUBLE-WALL FIBERGLASS I° (j--� of i D. CONTAINMENT SUMPS SHALL PASS A 24 HOUR LEAK TEST. <br /> ABOVE FINISHED YARD GRADE. ^,/ STORAGE TANKS (10' DIA.) I ° �✓ ® R + p <br /> CONSTRUCT REDWOOD VENT "1^ w/ IK SLAB ENFORCED CONCRETE ° �. N 0 E, OVERFILL PROTECTION SHALL BE CAPABLE OF DRAINING LIQUID BACK INTO FUEL TAMS. 2"/3VAPOR PIPING <br /> (ENCLOSURE PER DETAILS) v 2) NEW 2°0 SINGLE-WALL VTi <br /> F. MONITORING SYSTEM SHALL PASS A FUNCTIONAL TEST, THE FUNCTIONAL TEST SHALL CONSIST CONNECTION DETAIL <br /> '1 FIBERGLASS VENT LINES (CONNECT R °d <br /> TO NEW U.G. TANKS & EXTEND - F '. ° 0 OF THE ACTIVATION OF THE ALARM VIA THE MONITORING PROBES/SENSORS, NO SCALE <br /> �O TO VENT RISERS (SLOPE 1/4- PER ° ° e d' C. FINAL INSPECTION AND APPROVAL TO OPERATE WILL BE GRANTED AFTER THE ABOVE ---- <br /> I FOOT MIN. UPWARD FROM TANK) a - <br /> •O / O L ^_ e8- ° ____ REQUIREMENTS ARE SATISFIED AND A HARD COPY OF THE PRECISION TEST IS SUBMITTED <br /> aa--° TO INSPECTOR AT SITE. REVISIONS ^s- <br /> ° <br /> °:' _ THE CONTRACTOR'S APPROVED PRINTSET OF THE UST INSTALLATION SHALL BE KEPT AT THE JOB SITE AND N0. DATE BY UPDATED PLAN PER REVIEWCOMMENTS <br /> MUST BE SHOWN TO THE INSPECTOR UPON REQUEST, IN ADDITION, THE LOCAL FIRE DEPARTMENT SHALL SR - --- - <br /> 12 ' PROPERTY LINE 155.80' N61° 56' 50" E APPROVE UST INSTALLATION PRIOR TO COMMENCEMENT OF WORK. <br /> IF YOU NEED FURTHER ASSISTANCE, OR WISH TO SCHEDULE AN APPOINTMENT TO DISCUSS THE PLAN REVIEW <br /> p OR FIELD INSPECTION, PLEASE CONTACT OUR UNDERGROUND STORAGE TANK STAFF AT (209) 463-3422 <br /> _ - APPROVALS <br /> SHELL OIL COMPANY <br /> i OISP. AREA ENGINEERING MANAGER DATE I HOUSTON, lj1,XAS-•--�_ <br /> 9 0151'RV;T MANAGER DATE <br /> � 3'-D'' s-D° 5•-D•' PIPING PLAN <br /> DISTRIBUIION MANAGER DATE <br /> NEW 13, 0" 2'-6" — <br /> ISLAND CONSTRUCTION/DISTRICT ENGINEER DATE 2494 E FRESTOC STREET LI FILBERT STREET <br /> NOTE! ALL EXISTING ITEMS ARE 10 REMAIN STOCK TON, CALIFORNIA <br /> NEW 25'-0" CONCRETE DRIVE SLAB. PLANS PREPARED BY: <br /> i UNLESS NOTED OTHERWISE. <br /> ENGINEERING SCALE: 1" _= 10'-0" DRAWING # TP- 1 <br /> REMA N T S' T R EE T PLANNING ENGINEERING CONSTRUCTION MANAGEMENT DATE: 11/231/95 <br /> Gm lA i/ �Y WIC #t 204-7524-- 18080 <br /> 45 QUAIL COURT, SUITE 303 DWN. BY: S. LEE '-- <br /> m w...o,... n WALNUT CREEK, CALIFORNIA 94596 CHKD. BY: VP <br /> +./ PHONE: 510-933-057II FAX: 510-933-0588 u <br /> r_� <br /> �;JSHELL_ OIL COMPANY, ALL RIGHTS RESERVED 199`x: <br />