My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2900
>
2300 - Underground Storage Tank Program
>
PR0522112
>
REMOVAL_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2021 9:27:28 AM
Creation date
11/5/2018 10:04:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2003
RECORD_ID
PR0522112
PE
2381
FACILITY_ID
FA0015073
FACILITY_NAME
DIESEL PERFORMANCE INC
STREET_NUMBER
2900
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2900 E FREMONT ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FREMONT\2900\PR0522112\REMOVAL 2003.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC HEALTH SERVICES <br />SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DIVISION <br />Karen Furst, M.D., M.P.H., Health Officer <br />304 East Weber Avenue, Third Floor • Stockton, CA 95202 <br />209/468-3420 <br />I. GENERAL INSTRUCTIONS: <br />[ ] 1. Submit all information in triplicate. Answer all questions, leaving no blanks. One copy will be returned <br />to the applicant with comments. <br />[ ] 2. Include a detailed site map on a separate sheet of paper, showing the location of the tanks(s), piping, <br />streets, adjacent properties (north toward the top of the page), nearby septic tanks, leachfrelds, water <br />wells, buildings, underground public utility lines (including water, sanitary sewer and storm sewer), and <br />distance of piping from tank to dispensers. If underground utilities are not included on the site map, you <br />must state in writing that USA Dig will be contacted prior to excavation activities. <br />[ ] 3. Complete page 3, "Application for Underground Storage Tank Closure Permit". of : Samplin£ <br />firm shall be an independent third party from the contractor. <br />[ ] 4. Complete page 9, "Authorization to Release". This form must be signed and dated by the <br />OWNERIOPERATOR of the facility. <br />[ ] 5. Submit the appropriate fees and complete page 11, the "Underground Storage Tank Program Fee <br />Worksheet". <br />[ ] 6. Complete all questions on page 10, the Public Health Services -Environmental Health Division (PHS- <br />EHD) "Underground Storage Tank Disposition Tracking Record", except those requiring a signature <br />and date of tank removal. The holder of the permit shall be responsible for ensuring that this form is <br />completed and returned to PHS-EHD within 30 days of the tank removal. <br />(] 7. Submit a "Site Health & Safety Plan" as an addendum to this application, to address all potential hazards <br />for this specific job site. Refer to the Site Safety Plan Guidance Document for specifics. <br />[ ] 8. If facility is located outside of the city limits, submit a 'Backfill Excavation Certificate" as required by <br />the County of San Joaquin Building Department and the incorporated City Building Departments, pursuant <br />to the Uniform Building Code STD 70-11. <br />[ I 9. Obtain a "Grading and Excavation Permit" from the City of Tracy Building Division prior to PHS-EHD <br />approval of the closure plan. <br />10. The maximum review time for Closure Plans is 15 working days from receipt of the adequately completed <br />plan. If gross deficiencies are identified, an addendum will be required with a $87.00/hour fee and the <br />review will begin on the date of resubmittal. <br />11. Submit verification of the fire permit from the appropriate fire district at the removal inspection. <br />Advance inspection notice of at least 48 hours is required by PHS-EHD. <br />Submit Contingency Plan for over -excavation at time of UST removal (if planning to over -excavate). <br />See "III. SITE MITIGATION" on Page 2. <br />09/21/00) Page 1 <br />A Division of San Joaquin County Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.