My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2900
>
2300 - Underground Storage Tank Program
>
PR0522112
>
REMOVAL_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2021 9:27:28 AM
Creation date
11/5/2018 10:04:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2003
RECORD_ID
PR0522112
PE
2381
FACILITY_ID
FA0015073
FACILITY_NAME
DIESEL PERFORMANCE INC
STREET_NUMBER
2900
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2900 E FREMONT ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FREMONT\2900\PR0522112\REMOVAL 2003.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. <br />a Describe the method that will be utilized to purge and/or Inert the tank(sy <br />Dry Ice will be added to the tank(s) at the rate of 20# <br />capacity for waste oil ana ai.esel tanks and 3U# per 100 <br />b. Tank0phtg Hauler. <br />Name Jim Thorpe 011, Inc. <br />r 1000 gal <br />7.. Gas. <br />Address P.O. Box 357 Cl ty Lodi, CA Zip 95241-0357 <br />Phone No{ 209 } 368-6175 <br />Hanler Hegiitrati m o p hauled as hazardous)___2 667 <br />o. TankM%ng Disposal Site: Erickson Environmental or Schnitzer Steel products. <br />Name An appropriate decision will be made at the time of diposal. <br />In Hictimonct, UA, bennitzer is in anc o ordova, CA <br />Address 12000 Folsom Blvd., Rancho 6jordova, CA yip 95742 <br />PboneNo.( 916 ) 985-4810 <br />BPA HM (if transported to a permitted TSD facility) <br />9. Is the sampling firm an Independent third party from the contractor? YES [ rL NO [ ] <br />9a Describe, in detail, how the soil and/or water sample(s) beneath the tank and piping will be obtained: <br />Samples will be taken at least two to three feet under the former tank <br />location with e backhoe. 3oil samples will be taken from the bucket. <br />Water samples, it necessary, will e taken with a. bailer. <br />10. Describe how the excavation will be backfilled with suitable material upon removal - <br />Backfill of the excavation will be done at the appriate time during this <br />project. Backfill material will consist of the excavated material and <br />other clean compactable material. <br />11. Handling of excavated sail: <br />a) What material will be used to line the tank pit and cover the stockpile? <br />3 mil plastic sheeting. <br />b) What will be the final destination of the excavated stockpile? <br />If the stock pile is contaminated, a decision based upon the contaminate, <br />levels of said contamination and quantities of soil as to the final dispos <br />c) Contaminated Soil Hazardous Waste Hauler. <br />NameJIm Thorpe Oil, Inc. Hauler Registration# 2667 <br />P.O. Box 357 City Lodi, CA <br />PhoneNo.( 209 ) 368-6175 <br />BH 23 046 (Revised 08113199) Page 5 <br />zip 95241-0357 <br />
The URL can be used to link to this page
Your browser does not support the video tag.