Laserfiche WebLink
13 August 1999 <br /> A(3E-NC Project No. 99-0606 <br /> Page 3 of 7 <br /> T-2M WN <br /> Exclusion Zone UST removal area A B C D Other <br /> Reduction Zone Document procedures A B C D Other <br /> Support Zone Support functions <br /> A B C P Other <br /> Specific Protective equipment for each level of protection used is follows: <br /> hard bat <br /> Mel-toed boots <br /> Level D: half-faced respirator(if necessary) <br /> gloves <br /> LI ­Ct'glasses <br /> If air purifying respitatats are authorized,organic vapor and dust is the appropriate canister for use <br /> with the involved substances and concentrations,No down-grading changes of the specified levels <br /> ofprotection shall be made-without the approval ofthe site safety officer and tbo project team leader. <br /> 6.0. ON-SITE WORK P1.4m <br /> Work party(ics)consisting of two persons will perform the following tasks: <br /> PROJECT TEAM LEADER: TASK; <br /> Tony Mikscich Direct UST removal procedures;_ <br /> EQUH'bUNT OPERATOR: TASK: <br /> Backhoe operator <br /> Field Technician (if nee.) Clean site <br /> The works party(ies)shall be briefed on the content of this plan prior to initiating onsite work, <br />