My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
4500
>
2300 - Underground Storage Tank Program
>
PR0231571
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2021 2:42:20 PM
Creation date
11/5/2018 10:08:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231571
PE
2381
FACILITY_ID
FA0004031
FACILITY_NAME
MASONRY GROUP, THE
STREET_NUMBER
4500
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
14332001
CURRENT_STATUS
02
SITE_LOCATION
4500 E FREMONT ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FREMONT\4500\PR0231571\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
5/6/2013 8:00:00 AM
QuestysRecordID
146962
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ,..,: <br /> STATE OFCAUFORNIA i <br /> STATE WATER RESOURCES CONTROL BOARD <br /> / UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM, <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION �PERMANENTLY CLOSED ON SITE <br /> ONE REM r72 INTERIM PERMIT 1-:14 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ..� - TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: LlSoe-) <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D.• Op B. MANUFACTURED BY: 1- <br /> - <br /> C. DATE INSTALLED(MDAY/YEAR) SO D. TANK CAPACITY IN GALLONS: I <br /> O' <br /> II.TANK CO IF A4 IS MARKED,COMPLETE ITEM C. <br /> A 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C. ❑ 1aUNLEADED u 3 DIESEL ❑ 6 AVIATIONGAS <br /> ❑ 2 PETROLEUM ❑ 80 EMPTY 1 PRODUCT ❑ 1b PR IUM H 4 GASAHOL ❑ 7 METHANOL <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE2 W[EADD LEADED 5 JETFUEL <br /> ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.# <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B,AND C.AND ALL THAT APPLIES IN BOX D AND <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEMSINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTEDTANK) ❑ 99 OTHER <br /> B. TANK i BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (PnmuyTAOk) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING ❑ 6 UNLINED -9S"ORRROWN ❑ 99 OTHER <br /> IS LINING MATERIAL COMPATIBLE WITH 100%METHANOL? YES_ NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONENKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATla CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND,BOTH IFAPPLICA8LE <br /> A. SYSTEM TYPE A SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS T TING ❑ 399 OTHER <br /> MONRORING ❑ <br /> V.TANK LEAK DETECTION <br /> F�E�] 1VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION E] 3 VADOZE MONITORING E] 4 AUTOMATIC TANK GAUGING F-] 5 GROUND WATER MONITORING <br /> 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE ST USE /DAY/YR) 2.ESTIMATED QUANTITY OF _ 3.WAS TANK FILLED WITH YES ❑ N <br /> SUBSTANCE REMAINING GALLONS <br /> IN <br /> MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> IIAPPLICANTS NAME DATE <br /> (PRINTED b SIGNATIIREI <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D.# m s 7T-1-11:ISS I <br /> L/u� <br /> PERMIT NUMBER ER <br /> PMIT APPROVED BYIDATE PERMIT E%PIRA-TIIOON-�DATE <br /> 1�?_�)_ <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. 11 <br /> FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE UNDERGROUND STORAGE TANK REGULATIONS\ � /1 <br /> FORMS (1291) ^\' `( / FOR69MBR6 <br /> `� ` ` rk <br />
The URL can be used to link to this page
Your browser does not support the video tag.