My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1789
>
2300 - Underground Storage Tank Program
>
PR0506708
>
INSTALL_1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2021 1:28:49 PM
Creation date
11/5/2018 10:20:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1997
RECORD_ID
PR0506708
PE
2361
FACILITY_ID
FA0007590
FACILITY_NAME
OLYMPIAN FUELING NETWORK
STREET_NUMBER
1789
STREET_NAME
FRESNO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
1789 FRESNO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FRESNO\1789\PR0506708\INSTALL 1997.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM DRAWING INFORMATION <br /> 1. Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br /> 2. �/Plans drawn to scale in non-erasable print. . <br /> 3. �/ Plot plan to show location of tanks and all associated piping. <br /> 4. /� Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. _✓/ Tank cross-sectional diagram. <br /> 6. V Detail of tank, associated piping, excavation and cover. <br /> 7. Tank(s) and piping approved by a nationally recognized independent testing organization. (Title 23, Chapter 16, <br /> Article 3, Section 2631 (b) & 26351 <br /> 8. V-� Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. <br /> 9. _� Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br /> 10. ✓` At the installation site, prior to installation, a tightness test shall be performed on both primary (10) and <br /> secondary (2') containment systems before covering. [Section 2635 (a) (3) & (4)) <br /> 11. �� Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br /> submitted directly to PHS-END from the testing company or owner of facility. (Health & Safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (h)) <br /> 12. TANK COMPOSITION <br /> TANK # # / # ^ # # # <br /> CAPACITY ���OO,�^C <br /> MANUFACTURER �/'USLtl J /'GIS GO <br /> COMPOSITION <br /> MNEL <br /> PRODUCT `S `',G,/r <br /> CORROSION PROTECTION �f lr• / f <br /> U.L. LISTED <br /> COMPATIBILITY WITH 100% !5 c S <br /> METHANOL <br /> 13. TANK(s) TO BE INSTALLED <br /> A. Steel-cLad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br /> coatings or coverings- <br /> _ (1) Tested at the instaLLation site using an electric resistance holiday detector. <br /> �� (2) Vacuum applied to interstitial space. <br /> B. Fiberglass <br /> (1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular (primary tank pressure test). <br /> C. Non-clad steel tank (Section 2635 (a) (2) (A)) <br /> (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br /> etc.). <br /> (2) Field installed cathodic protection systems designed and certified as adequate by a <br /> corrosion specialist. <br /> (3) Impressed current systems to be inspected no Less than every 60 days. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.