My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000150
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ASHLEY
>
7644
>
3500 - Local Oversight Program
>
PR0543394
>
ARCHIVED REPORTS XR0000150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2018 3:57:17 PM
Creation date
11/5/2018 10:23:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000150
RECORD_ID
PR0543394
PE
3528
FACILITY_ID
FA0003967
FACILITY_NAME
AT&T California - UE132
STREET_NUMBER
7644
Direction
N
STREET_NAME
ASHLEY
STREET_TYPE
Ln
City
Stockton
Zip
95212
CURRENT_STATUS
02
SITE_LOCATION
7644 N Ashley Ln
P_LOCATION
99
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o Bata Ualidation and Report Approval Process <br /> 1 After the production of data, both the analyst and the Laboratory <br /> Manager review the data for accuracy and completeness'. The <br /> individual Laboratory Manager is responsible for assuring that all <br /> quality control parameters are within the quality acceptance <br /> specifications, than all customer required QC requirements are net, <br /> and that all calculations are correct as reported . This validation <br /> In augmented by the Project Manager, the Quality Assurance Officer, <br /> and the Uice President of Technical Services. <br /> The final report is prepared by the Project Manager with the <br /> assistance of the Document Control Department, and is subject to <br /> approual by the xndivzdual Laboratory Managers and the Uice President <br /> of Technical Services, who sign the report _ <br /> The Document Control Department staff prepares final QA/QC reports, <br /> as per the appropriate SBP, with the assistance of the duality <br /> Assurance Officer . They are approved by the Uice President of <br /> 1 Technical Services . Quality Assurance/Quality Control records are <br /> maintained in the Document Control Department under the direction of <br /> the Quality Assurance Officer and the Uice President of Technical <br /> Services . <br /> o Certifications and Performance Evaluations <br /> It is the responsibility of the Quality Rssurance Officer and the <br /> Uice President of Technical Services to assure that all license and <br /> certification requirements are net. <br /> N <br /> Performance evaluations are conducted under the direction of the Uice <br /> President of Technical Services, the Quality Assurance Officer, and <br /> the assigned Project Manager. In addition to both State and Federal <br /> performance evaluation samples. CHEMUCST analyzes EPA check samples. <br /> outside vendor check samples, in house blind check samples. and <br /> 1 periodic performance evaluation samples submitted by our sister <br /> organization, CompuChen, as part of the corporate Quality Assurance <br /> Plan . <br /> 1 <br /> 1� <br /> 3 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.