MATERIAL AND WORKMANSHIP 11, SAFETY PLAN. CONTRACTOR SHALL DEVELOP AND MAINTAIN, FOR THE B; VENT/VAPOR PIPING: RED THREAD IIA AND RED THREAD II WITH UNDERGROUND TANK CLOSURE PLAN - I� <br /> DURATION OF THE CONTRACT, A SITE HEALTH 4 SAFETY PLAN THAT WILL FITTINGS AND 1000 AND 8000 SERIES ADHESIVE; OR AMERON DUALOY <br /> 1. UNLESS OTHERWISE SPECIFICALLY PROVIDED IN THESE DOCUMENTS,ALL EFFECTIVELY INCORPORATE AND IMPLEMENT REQUIRED SAFETY PROVISIONS, 3000L WITH ALCOHOL FITTINGS AND RP48 ADHESIVE. DO NOT MIX IID GENERAL INFORMATION - <br /> EQUIPMENT, MATERIAL, AND ARTICLES INCORPORATED IN THE WORK I - AND: - MANUFACTURER'S MATERIALS. M r' <br /> COVERED BY THESE DOCUMENTS ARE TO BE NEW AND OF THE MOST SUITABLE 1.1 LOCATION OF TANKS: JIMCO TRUCK STOP M <br /> GRADE FOR THE PROCESS INTENDED. - - A: APPOINT AN EMPLOYEE AS THE SAFETY OFFICER WHO 1$ QUALIFIED C: PERSONS INSTALLING PIPING MUST BE CERTIFIED A8 HAVING BEEN 1021 FRONTAGE RD. DD IN <br /> AND AUTHORIZED TO SUPERVISE AND ENFORCE COMPLIANCE WITH THE TRAINED BY MANUFACTURER RIPON, CA 95366 <br /> 2. THE CONTRACTOR SHALL FURNISH TO THE OWNER'S AGENT FOR W13 HEALTH AND. SAFETY PLAN. SUBMIT T14E NAME AND QUALIFICATIONS OF - (209) 599'-2111 ,1 k C <br /> APPROVAL THE! NAME OF THE MANUFACTURER, THE MODEL NUMBER, AND THE SAFETY OFFICER O THE OWNER'S AGENT PRIOR TO COMMENCING WORK D: STEEL PIPE: ALL METAL PIPING SHALL 15E BLACK IRON SCHEDULE (CCS�� <br /> OTHER IDENTIFYING DATA AND INFORMATION RESPECTING THE ON THE SITE. - 40, OR EXTRA STRONG. GALVANIZED PIPE IS NOT ALLOWED. FITTINGS 12 CWNER: OLYMPIAN MBP W a <br /> PERFORMANCE, CAPABILITY, NATURE, AND RATING OF THE MACHINERY AND SHALL BE 300 P81 MALLEABLE IRON.. 2191 NAVY DRIVE > 0 r LL 0 00 <br /> MECHANICAL AND OTHER EQUIPMENT WHICH THE CONTRACTOR CONTEMPLATES B: THE PLAN SHALL CONTAIN THE NAMES, ADDRESSES AND TELEPHONE - STOCKTON, CA 95206 N r 0 <br /> INCORPORATING IN THE WORK WHEN REQUIRED BY THE OWNER'S AGENT. NUMBERS OF THE SUPERVISORY PERSONNEL, THE HOSPITAL FACILITIES E: ALL STEEL PIPE BELOW GRADE IS TO BE DOUBLE WRAPPED WITH 20 209-943-2011 N 0 (O 4 <br /> NEAREST THE SITE, AND A MAP TO THE HOSPITAL. PROCEDURES SHALL BE MIL. PVC PIPE WRAP, OVER A PIPE WRAP PRIMER FOR USEWITH VINYL 0 0) IN0 <br /> 3, WHEN REQUIRED BY THESE DOCUMENTS OR WHEN CALLED FOR BY THE WRITTEN IN THE PLAN FOR ACTIONS TO BE SHOULD STRANGE ODORS TAPE$,-AND SHALL BE BY THE SAME MANUFACTURER AS THE WRAP. 13 PROJECTED PROJECT START: 20 APR 98 I W <br /> APPROV FULL IERS AGENT, NE CONTRACTOR SHALL FORMATION MATION CONCERNING TTHHE MATERISH THE IANT FOR L OR ARTICLES OR HAZARDOUS 8U88tANGE6 BE UNCOVERED. � F: ALL THREADED.CONNECTIONS SHALL BE THREADED WITH SEALANT � 1.4 TANKS: 3 $NGL. WALL STEEL �'' 111 > a. � N .J.) <br /> WHICH HE CONTEMPLATES INCORPORATING IN THE WORK WHEN 60 C: IF, DURING THE COURSE OF THE WORK, UNSAFE CONDITIONS DEVELOP WHICH SHALL BE CURRENTLY WARRANTED BY MANUFACTURER FOR FULL ^ V W V <br /> DIRECTED, SAMPLE$ MAY BE SUBMITTED FOR APPROVAL AT THE OR ARE ENCOUNTERED, TAKE IMMEDIATE MEASURE$ TO CORRECT THE COMPATIBILITY WITH THE PIPING MATERIAL USED, AND FOR USE WITH NUMBER GALLONS MATERIAL PRODUCT l f , Z �� M <br /> CONTRACTOR'S EXPENSE, WITH ALL SHIPPING CHARGES PREPAID. - CONDITION. IF THE CORRECTIVE ACTION 15 INSUFFICIENT IN THE PETROLEUM SOLVENTS, FUELS, OILS, DIESEL, AND 1069; METHANOL, WHICH 1 1,500 8TL' UNLEADED GASOLINE PL�1 Z � d' 0 <br /> 4. MACHINERY, EQUIPMENT, MATERIAL, AND ARTICLES INSTALLED OR USED CORRECTIVE VE AtiCT OF THE ONERS AGENT,CAN BE IMPLEMENTED.I� SHALL CEASE UNTIL SHALL BE VERIFIED BY CURRENT MANUFACTURER'S PRODUCT DATA SHEET. 3 110000 8TL DIESEL ED GASOLINE V- 00 <br /> ! IL <br /> WITHOUT REQUIRED APPROVAL SHALL BE AT THE RISK OF SUBSEQUENT G: G.C. SHALL DEMONSTRATE. TO OLUNER'$ REPRESENTATIVE THAT ALL 0 E" a Qj m m <br /> REJECTION. D: PROVIDE A MINIMUM OF TWO FIRE EXTINGUISHER'S WITH A MINIMUM MATERIALS ARE NEW AND CONFORM TO ABOVE SPECIFICATIONS, IS HISTORY: UNKNOWN I� r 0 <br /> CLASS RATING OF 2-.A,20-B:C WITHIN 50 FEET OF THE OPERATION. ,!�)'�1 N 007 <br /> 5. ALL WORK TO BE DONE IN ACCORDANCE WITH APPLICABLE CODES'AND 20, DO NOT PLACE PRODUCT PIPING UNDER BUILDINGS. PIPING RUNS OVER Ib CONTRACTORS: V N 0 <br /> ' REGULATIONS. 18. UNDERGROUND- SERVICE ALERT (U.BA.) - THE CONTRACTOR SHALL NOTIFY TANKS SHALL BE MINIMIZED. MAINTAIN MINIMUM CLEARANCE AS SHOWN ON 0 N = <br /> MEMBERS OF USA. 2 FULL WORKING DAYS IN ADVANCE OF PERFORMING DRAWINGS. MINIMIZE GROSSING OTHER LINES AND CONDUIT. IF PIPING GENERAL: WALTON ENGINEERING, INC. <br /> 6. ALL MATERIALS SHALL BE INSTALLED PER MANUFACTURERS INSTRUCTIONS ANY EXCAVATIION WORK BY CALLING THE TOLL-FREE ONE-CALL PROGRAM IS NOT SHOWN ON SITE PLAN, G.C. $HALL RUN LINES THE MOST DIRECT 0 <br /> AND THESE DOCUMENTS. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION NUMBER (800) 221-2600. ROUTE SUBJECT TO APPROVAL BY OWNER'S REPRESENTATIVE. PRODUCT REMOVAL: OWNER _ N 0 <br /> OF THE OWNERS ENGINEER - 21. INSTALL NEW VENT RISERS A8 SHOWN ON SITE PLAN. INSTALL NEW $WING BOTTOMS REMOVAL: RAMOS ENVIRONMENTAL <br /> 1. IF ANY OF THESE DOCUMENT$ INDICATE A CONFLICT WITH THE STATE OR PETROLEUM WORK SCOPE JOINTS AT BOTTOM OF VENT RISER$. ' <br /> LOCAL REQUIREMENTS, AS ARE CURRENTLY IN EPFECT AT THE TIME OF THIS TANK HAULER WEST COAST EQUIPMENT <br /> PROJECT, IT 18 EXPECTED THAT THE MOST RESTRICTIVE CONDITION(S) 1. PRIOR TO THE START OF WORK PROVIDE OU.NER WITH U10RK PLAN AND 22. PIPING SYSTEMS SHALL BE TESTED PER CURRENT MANUFACTURER'S <br /> WOULD APPLY. - SCHEDULE THAT ALLOW5 THE SITE'S STORE TO REMAIN OPEN TO THE INSTRUCTIONS SHALL BE FOLLOWED AT ALL TIMES; AND SHALL HAVE GEOLOGIST GRAYLAND ENVIRONMENTAL - <br /> FULLEST EXTENT POSSIBLE. PRECEDENCE OVER OTHER INSTRUCTIONS. <br /> TANK DISPOSAL FACILITY: WEST COAST EQUIPMENT /'� <br /> GENERAL CONDITIONS 2 OUT"SIG S ON FENOFF WORK CE EVERY 30 FEET.A WITH &' HlaTl HAIN LINK AT THE ENDNCE. POST "KEEP AG.C. TO OF EACH WORK DAY TO LINE TESTING 0WNER Sf REPRESENTATIVE SHTIVE UALLL WITNEI58 ALLNG DAYS <br /> LINE PRIOR 2.0 CLOSURE PROCEDURE-REMOVAL OF TANKS J 1 M c O <br /> 1. CONTRACTOR EMPLOYEES TO HAVE COMPLETED 40 HOURS OSHA TRAINING SECURE FENCING PANELS TOGETHER TESTING. MARK TEST PRESSURES ON GAUGE WITH ELECTRICAL TAPE AT TRUCK S T O P <br /> COURSE PRIOR TO THE START OF WORK CERTIFICATION OF THI8 MUST BE BEGINNING OF TESTS. PRESSURE SHALL HOLD FOR AT LEAST ONE (1) SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DIVISION TANK <br /> PROVIDED TO THE OWNER'S ENGINEER PRIOR TO THE START OF WORK 3. FLUSH, CUT, AND REMOVE PRODUCT LINES FROM EXISTING TANKS TO HOUR AND BE WITNESSED BY OWNER'S REPRESENTATIVE. 00 NOT BACKFILL CLOSURE GUIDELINES AND SOIL AND GROUNDWATER SAMPLING <br /> DISPENSER ISLANDS. TRENCHES UNTIL AUTHORIZED BY OWNER'S REPRESENTATIVE. - GUIDELINES SHALL BE FOLLOWED, EXCEPT WHERE THE FOLLOWING <br /> 2. CONTRACTOR EMPLOYEES TO HAVE COMPLETED THE PIPING MANUFACTURER'S 6PECIFICATIONS.ARE MORE RESTRICTIVE, ,f 1022 FRONTAGE RD <br /> TRAINING REQUIREMENTS IN ACCORDANCE WITH 1994 CALIFORNIA UST 4. REMOVE ALL EXISTING FUEL DISPENSERS, ISLANDS, BARRICADES, FUEL B: TEST PRESSURES SHALL BE: - RIPON, CA 953C�C <br /> REGULATIONS. CERTIFICATES SHALL BE PROVIDED TO OWNER LINES, CANOPY, ASPHALT AND CONCRETE SURFACES A$ REQUIRED, IN 2" - 50 PSI AND APPLY SOAP SOLUTION. REMOVE ALL PRODUCT FROM TANKS. <br /> CONTRACTOR SHALL COMPLETE THE PIPING INSTALLATION CHECKLIST PREPARATION FOR INSTALLATION OF NEW AS SHOWN ON DRAWINGS, ANY 3" - 40 PSI AND APPLY SOAP SOLUTION, (20'W 599-211 <br /> SUPPLIED PIPING MANUFACTURER AND SHALL FURNISH THE CHECKLIST TO SALVAGEABLE EQUIPMENT TO BE REMOVED FROM SITE AS DIRECTED BY 3" - SECONDARY - 5 PSI AND APPLY SOAP SOLUTION. REMOVE ALL RESIDUAL LIQUID, SOLIDS, OR SLUDGES. <br /> OWNER OWNER REPRESENTATIVE. C. CAUTION: DISCONNECT FLEX CONNECTOR FROM STP AND CAP PRIOR PURGE ALL VAPORS FROM TANKS WITH A MINIMUM OF THIRTY (30) SAN JOAQUIN COUNTY <br /> 3. CONTRACTOR TO HAVE BEEN TRAINED AND CERTIFIED BY THE TANK 5. PREPARE FOR REMOVAL AND REMOVE EXISTING UNDERGROUND FUEL TO TESTING. APPLY t RELEASE PRESSURE SLOWLY, VENT/VAPOR SYSTEM POUNDS OF SOLID CARBON DIOXIDE (DRY ICE) FOR EACH 1,000 GALLONS APN 2io l -020-04, 12 <br /> MANUFACTURER IN CORRECT TANK INSTALLATION IN ACCORDANCE WITH 1994 (GASOLINE < DIESEL) STORAGE TANKS (UST6) IN ACCORDANCE WITH THE SHALL BE TESTED FROM TOP OF VENT, THROUGH MANIFOLD(5), EXTRACTOR OF TANK CAPACITY AND PRESENT SALES $LIPS TO INSPECTOR <br /> CALIFORNIA UST REGULATIONS, CERTIFICATES SHALL BE PROVIDED TO UNDERGROUND TANK CLOSURE PLAN. OWNER WILL EMPTY TANK& OF BASE AND RISER STAGE I CONTAINMENT MANHOLES, STAGE II VAPOR PELLETIZED DRY ICE 16 RECOMMENDED, CAP ALL OPENINGS EXCEPT <br /> OLLNER CONTRACTOR SHALL COMPLETE THE TANK INSTALLATION CHECKLIST REUSABLE PRODUCT. GENERAL CONTRACTOR TO PROVIDE FOR DRY ICE TO LINE$ TO 1ELANDS ANp STAGE II FLEX CONNECTOR$ At DISPENBER(S). VENT PIPE AND ALLOW TWO HOUR MINIMUM AND 61X HOUR MAXIMUM FOR <br /> SUPPLIED TANK MANUFACTURER AND SHALL FURNISH THE CHECKLIST TO PURGE TANKS, BUT NO LE58 THAN 30 LBS. PER 1,000 GALLONS CAPACITY. O>KYGEN DISPLACEMENT AFTER PUTTING CARBON DIOXIDE INTO THE <br /> OWNER D. SLOWLY PRESSURIZE PRODUCT LINES AND VENT/VAPOR SYSTEM TO 50 TANKS. VENT PIPE OPENING TO BE CHECKED WITH A COMBUSTIBLE GAS <br /> 6. CONTRACTOR SHALL PROVIDE FOR CLEANING A$ NECESSARY, PSI. SOAP ENTIRE PIPE SURFACES INCLUDING JOINTS, AND FITTINGS. DETECTOR TO DETERMINE IF TANK IS VAPOR FREE ORP ADDITIONAL ALTON <br /> 4. CONTRACTOR TO DEVELOP A SPECIFIC SITE SAFETY PLAN FOR TANK TRANSPORTATION, DISPOSAL OF TANKS, AND RIN$ATE IN ACCORDANCE PER CORRECT ANY LEAKS AND RETEST. - DRY ICE AND/OR TIME MAY BE REQUIRED. NGINEERING, INC.' <br /> REMOVAL AND TANK INSTALLATION PRIOR TO THE START OF WORK, COUNTY REGULATIONS, BY APPROVED HAULER CUTTING TANKS ON SITE 18 <br /> CONTRACTOR WILL CONDUCT WEEKLY JOB SITE SAFETY MEETINGS WITH IT'S, NOT.ALLOWED. - - E. SLOWLY RELIEVE PRESSURE FROM VAPOR/VENT SYSTEM AND REMOVE PLUG OR CAP ALL TANK OPENING$ LEAVING AN I/W - 1/4" PRESSURE <br /> EMPLOYEES AND THE MEETING MINUTES WILL BE SUPPLIED TO OWNER PLUG FROM EACH EXTRACTOR AFTER TEST. REDUCE PRODUCT LINE RELIEF HOLE IN ONE CAP AT THE TOP OF THE TANK <br /> 1. GENERAL CONTRACTOR SHALL FURNISH CONSULTANTS TO PERFORM SOIL .., , PRESSURE TO 5 PSI. MONITOR DAILY UNTIL ALL YARD PAVING IS <br /> 5. CONTRACTOR SHALL HAVE THE FOLLOWING LICENSES: AND/OR WATER TESTING UPON TANK 4 PIPING REMOVAL IN ACCORDANCE • '--. COMPLETE. VISUALLY INSPECT THE. TANKS UPON REMOVAL. ALL EXTERNAL TANK P.O. BOX 1025 <br /> WITH TANK CLOSURE PLAN AND LOCAL REGULATIONS. (ALLOW TWENTY-FOUR SU FACES AND FITTINGS SHALL BE INSPECTED FOR EVIDENCE OF HOLES E143 RISKE LANE <br /> A. GENERAL ENGINEERING "A" HOURS FOR RE:6ULTS OF SOIL SAMPLES.) F; SE " NDARY PIPE MUST BE PROPERLY GUT. INSPECT ALL PRIMARY OR LEAKAGE. THE RESULTS OF SUCH INSPECTION SHALL BE <br /> BNG WEST 3AGRAMENTO, GA 35691 <br /> . HAZARDOUS MATERIAL SUBSTANCE HANDLI ("HAZ") PIP@., RFACEB, PRESSURIZE SECONDARY PIPE TO 5 PSI AND SOAP ALL DOCUMENTED IN WRITING, WITH PHOTOGRAPHS WHERE APPROPRIATE. <br /> 8. CONTRACTOR SHALL PLACE EXCAVATED SOIL ON AND SHALL COVER WITH 4 PIPE �j RFACE. AND FITTINGS. PRESSURE ON THE PIPING SECONDARY PATCH ANY HOLES WITH AIrPROVED MATERIAL BEFORE TRANSPORTING (91(o) 372-fta <br /> 6, CONTRACTOR SHALL HAVE THE FOLLOWING INSURANCE. CONTRACTOR 8HALL MIL. PLASTIC UNTIL 601L 1$ REMOVED, SOIL TO BE STOCKPILED ON SPACE ALL BE MAINTAINED UNTIL AFTER THE PAVING 18. IN PLACE OVER - TANKS TO DISPOSAL SITE. - PAX 3-13.-1172 <br /> HAVE PROOF OF SUCH INSURANCE ON FILE WITH OWNER BY NAMING OWNER SITE FOR SAMPLING PRIOR TO OPF-HAUL BY OTHERS AS DIRECTED BY TANK RELD AND PIPING RUN8; AND SNAL1- BE WITNESSED BY THE 0104ER'8 <br /> AS "ADDITIONAL INSURED". OWNER REPRESENTATIVE. TUkO SOIL SAMPLES SHALL,3E ANALYZED FROM BENEATH THE TANK ONE <br /> FROM DIRECTLY BENEATH ',aE FILL PIPE. THE OTHER FROM A SIMILAR THEREUIENT Yas 6E VICE,REMA5PECFICATIN TH,ae <br /> e F d R PROPERTY <br /> OF OF SER D`r REMAIN THE <br /> A. STATUTORY UJORKMAN'8 COMPREHENSIVE LIABILITY I 9. OWNER $HALL PROVIDE FOR TRANSPORTATION AND DISPOSAL OF ALL G. AFTER BEING WITNESSED BY OWNERS REPRESENTATIVE, REMOVE POSITION AT THE OPP081jE1END OF THE TANK IF-OBVIOUSLY STAINED r-rxor�RTr cF u;al.lcN �NEEw^ws, Mc, <br /> EXCAVATED &OIL AFTER COMPLETION OF ANY NECESSARY REMEDIATION, PRESSURE FROM PRODUCT LINES AND AIR FROM SECONDARY LINES AFTER OR CONTAMINATED APE!Ag EXIST IN LOCATIONS OTHER THAN THE ABOVE AND 8HALL NOT BE U6ED FOR ANY FUR VA <br /> B. COMPREHENSIVE GENERAL LIABILITY, WITH A COMBINED SINGLE INCLUDING AERATION. PAVING IS IN PLACE LOCATIONS, THEN ADDITIONAL SOIL SAMPLE$ SHALL BE ANALYZED FROM OTHER THAN MDSE FCR U 41CH THEY PAVE <br /> LIMIT OF NOT LESS THAN $1,000,000 PER OCCURRENCE POR BODILY - THESE OBVIOUSLY 6TANEpOR CONTAMINATED AREAS. BEEN SUPPLIED OR F'REPE,C TIED R TRACED ES <br /> 8HALL NOT BE REPRODUCED,O,COPIED OR TRAFED <br /> INJURY AND PROPERTY DAMAGE. 10. IF REQUIRED, BACKFILL THE ABANDONED TANK HOLE ONCE ALL SAMPLING 23. G.G. SHALL PERFORM PRECISION TEST ON PRODUCT LINES AFTER PAYING '' wruaT rI+E EXPF+E88 uwttEN ccNeEriT OF <br /> AND/Oft OVER-EXCAVATION 16 COMPLETED. BACKFILL MUST BE ENGINEERED 1$ COMPLETE AND PRIOR TO FINAL PROJECT ACCEPTANCE. PRECISION SOIL SAMPLE& SHALL BE COLLECTED FROM THE NATIVE SOIL AT OR LLL .TON EW41NEERPG, NO. <br /> C. AUTOMOBILE LIABILITY COVERING USE OF ALL OWNED HIRED FILL COMPACTIED UNDER ENGINEER'S SUPERVISION. THE CONTRACTOR 16 LINE TEST SHALL BE IN ACCORDANCE WITH NFPA 329, LOCAL JUST BELOW THE INTERFACE OF THE BACKFILL WITH THE NATIVE SOIL. <br /> VEHICLES WITH A COMBINED SINGLE LIMIT OF SINGLE UNIT OF LIABILITY RESPONSIBLE IFOR CERTIFYING THE COMPACTION, A THIRD PARTY ENGINEER REQUIREMENTS, OR APPROVED EQUAL. TEST SHALL BE CONDUCTED BY A SAMPLE$ SHALL BE TAKEN USING A DRIVEN-TUBE TYPE SAMPLER, COPYRIGHT © 199A <br /> OF NOT LESS THAN 11,000,000 PER OCCURRENCE FOR BODILY INJURY AND SHALL WITNESS$ THE PROCESS AND CERTIFY THAT THE HOLE WA6 COMPACTED CERTIFIED TESTER G.C. SHALL PROVIDE WRITTEN REPORT OF PRECISION CAPPED AND SEALED WITH INERT MATERIALS. FORMAL, SIGNED CHAIN- <br /> PROPERTY DAMAGE. PROPERLY, PROVIDE COMPACTION REPORT TO OWNER ! ENVR. HLTH. TEST TO OWNER'S REPRESENTATIVE PRIOR TO OWNER'S ACCEPTANCE OF OF-CUSTODY RECORDS SHALL BE MAINTAINED FCR EACH SAMPLE AND <br /> PROJECT. SUBMITTED WITH THE RESULTS TO THE REGULATING AGENCY. <br /> 1. GENERAL CONTRACTOR TO FURNISH ALL LABOR MATERIAL, EQUIPMENT, AND II. CONTRACTOR 70 INSTALL NEW LIGHT POLE PER PLANS, SPECIFICATIONS � �. DRAW^! BY MEL - <br /> SERVICE$ NECESSARY FOR OR REASONABLY INCIDENTAL TO THE AND SHOP DRAWING$ AND ARRANGE FOR ALL INSPECTIONS. PROVIDE 24. CONTRACTOR SHALL PROVIDE DOCUMENTATION OF A DYNAMIC BACKPRES6URE TO EXPEDITE THE PROCESS or TANK REMOVAL, THE FOLLOWING --- <br /> SATI6FACTORY COMPLETION OF ALL WORK SHOWN ON, CALLED FOR OR CONDUITS FOR LIGHTING. TEST OF ALL VAPOR RETURN LINES A$ REQUIRED BY LOCAL REGULATIONS. ALTERNATIVE SAMPLING METHOD'MAY BE USED, CHKD' BY RJH/JU) <br /> REQUIRED BY THE DRAWINGS. <br /> 25. CONTRACTOR SHALL DO ANY OTHER TESTING A8 REQUIRED BY LOCAL A. IMMEDIATELY UPON REMOVAL OF THE TANK A BACKHOE BUCKET OF DATE I1 MAR 98 . <br /> 8, ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE UNIFORM 12. CONTRACTOR SHALL PLACE SOIL FROM FOOTING EXCAVATION ON, AND SHALL REGULATIONS. NATIVE 601E SHALL BE TAKEN FROM THE NATIVE SOIL TWO (2) FEET <br /> BUILDING CODE, UNIFORM FIRE CODE, NATIONAL ELECTRICAL CODE, COVER WITH, 4 MIL. PLASTIC UNTIL 801L 16 REMOVED. SOIL TO BE BELOW THE SOIL/BACKFILL INTERFACE. THIS 6011- SHALL BE RAPIDLY SCALE pL07 FULL <br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS, 08HA STOCKPILED AND SEGREGATED ON SITE FOR SAMPLING PRIOR TO OPP-HAUL 26. CONSTRUCT NEW FUEL ISLANDS AS SHOWN ON DRAWINGS. BROUGHT TO THE SURFACE.. <br /> CONSTRUCTION SAFETY ORDERS, AND ANY OTHER APPLICABLE STATE, CITY, " BY OTHERS AS DIRECTED BY OWNER <br /> OR COUNTY ORDINANCES. - 21, DISPENSER BOXES, TURBINE SUMPS, AND OVERFILL BOXES ARE 70 BE B, APPROXIMATELY THREE INCHES $HALL BE RAPIDLY SCRAPED AWAY JRB NO. 26940 <br /> 13. NOT USED, COMPLETELY SEALED AND WATER TESTED, AS EVIDENCED BY OWNER'S FROM THE SURFACE OF THIS SOIL, THEN A CLEAN BRASS TUBE (AT <br /> S. PETROL PERMITS TO BE SECURED BY OWNER AND SUPPLIED TO CONTRACTOR REPRESENTATIVE AS FOLLOWS: LEAST THREE INCHES LONG) SHALL BE DRIVEN INTO THE SOIL WITH A <br /> CONTRACTOR 16 RESPONSIBLE FOR COMPLYING WITH ALL PERMIT 14. - EXCAVATE AS NECESSARY FOR THE INSTALLATION OF REPLACEMENT TANKS.. SUITABLE INSTRUMENT (WOODEN MALLET, ETC.). REVISIONS <br /> GONPiTiONS, I. FILL WITH WATER TO.HIGHEST PENETRATION. <br /> 15. CONTRACTOR SHALL COVER EXCAVATED SOIL WITH 4 MIL. PLASTIC UNTIL 2. SPRAY PAINT TOP OF WATER C. THE ENDS OF BRASS TUBE SHALL BE COVERED WITH ALUMINUM FOIL, <br /> 10. GENERAL CONTRACTOR SHALL VISIT SITE AND FAMILIARIZE HIMSELF OP SOILI$ REMOVED. SOIL TO BE STOCKPILED AND SEGREGATED ON SITE - THEN PLASTIC END CAPS, AND FINALLY WRAPPED WITH A SUITABLE DATE REV DESCRIPTION B <br /> ALL EXISTING CONDITIONS PRIOR TO SUBMITTING HIS BID. FOR SAMPLING PRIOR TO OFF-HAUL A6 DIRECTED BY OWNER. 28. PROVIDE AND INSTALL CONDUIT 4 WIRING FOR PETROLEUM 6YSTEM(8) AND - TAPE. -AREA LIGHTING. PROVIDE CONDUIT FOR CARDREADERS AND OTHER SITE - <br /> 11. . GENERAL CONTRACTOR SHALL PROTECT ALL EXISTING FACILITIES TO 16. INSTALL "TYPAR" FILTER FABRIC LINER IN TANK HOLE AND TRENCHES PER ELECTRICAL AS INDICATED ON THE DRAWINGS. D. THE SAMPLE SHALL BE IMMEDIATELY PLACED ON ICE, OR DRY ICE, <br /> REMAIN UNLESS NOTED OTHERWISE. CONTRACTOR SHALL REPAIR OR DRAWINGS, WHERE REQUIRED BY WET-HOLE CONDITIONS. PROVIDE TANK FOR TRANSPORT TO A LABORATORY. AGAIN, FORMAL CHAIN-CF-CUSTODY <br /> REPLACE TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE ANY HOLD-DOWNS AS REQUIRED BY MANUFACTURER IN WET-HOLE CONDITIONS. 29. ALL CONDUIT IS TO BE 3/4" (MINIMUM) CONDUIT. _ RECORDS SHALL BE MAINTAINED AND SUBMITTED FOR EACH SAMPLE. <br /> EXISTING FACILITIES THAT ARE DAMAGED BY THE CONTRACTOR'S IF THE BOTTOM OF THE TANK IS BELOW THE GROUNDWATER TABLE, THEN <br /> OPERATIONS. 11. INSTALL NEW UNDERGROUND STORAGE TANK PER DRAWINGS AND CURRENT 30. INSTALL MONITORING SYSTEM WITH TANK PROBES, SUMP PROBES, TANK BOIL SAMPLES ARE NOT REQUIRED. IN THIS CASE, A WATER SAMPLE <br /> MANUFACTURER'S INSTRUCTIONS, WHICH SHALL BE FOLLOWED AT ALL GAUGES, AND MONITOR CONTROL PANEL IN BUILDING PER DRAWINGS. SHALL BE COLLECTED AS SOON AS POSSIBLE FROM THE SURFACE OF <br /> 12. ALL EXCAVATIONS SHALL BE PERFORMED IN COMPLIANCE WITH OSHA AND TIMES, AND SHALL HAVE PRECEDENCE OVER OTHER INSTRUCTIONS. THE GROUNDWATER IN THE EXCAVATION, A CHECK SHALL INITIALLY BE <br /> STATE REGULATIONS. THE CONTRACTOR 15 REFERRED t0 THE OSHA MANUFACTURER'S CHECKL18T8 SHALL BE COMPLETED BY THE CONTRACTOR, 31. INSTALL NEW DISPENSERS, AND CONSOLE AS INDICATED ON THE SITE PLAN MADE FOR ANY FREE FLOATING PRODUCT.. IF NO FLOATING PRODUCT 18 - <br /> BOOKLET, "EXCAVATING AND TRENCHING OPERATIONS", FOR A SAFE WORK AS EACH STEP IS COMPLETED. TANK BEDDING AND BACKFILL TO BE PEA AND DESCRIBED IN THE EQUIPMENT LIST, DETECTED, THEN A WATER $AMPLE SHALL' BE TAKEN WITH A DEVICE <br /> PRACTICES GUIDE FOR PERFORMING EXCAVATION WORK GRAVEL. TANK BURY 16 TO BE MINIMUM 5 FEET, TANK BEDDING IS TO BE - DESIGNED TO REDUCE THE LOBS OF VOLATILE COMPONENTS. A BAILER _.. <br /> A MINIMUM 1211, SPACING BETWEEN TANKS IS TO BE A MINIMUM CF 18". 32, INSTALL SITE LIGHTING, IF APPICABLE, AND/OR ANY OTHER ITEMS AN SHOWN 18 A SUITABLE SAMPLING DEVICE. THE WATER SAMPLE SHALL BE <br /> 13. UPON COMPLETION OF PROJECT, CONTRACTOR SHALL PROVIDE OWNER WITH TANK INTEGRITY TESTING SHALL CONFORM TO MNFR'S. REQUIREMENTS. ON THE DRAWINGS. � _ IMMEDIATELY POURED INTO A VOLATILE ORGANIC ANALY8IS-(VOA) VIAL _ <br /> "A8 BUILT" DRAWINGS OF ALL ITEMS INSTALLED BY SAME. "AS BUILT$" - WITH AS LITTLE AGITATION AS POSSIBLE, A TEFLON SEPTUM SHALL. BE - - -- <br /> SHALL BE COMPLETED ON-SITE WITH INFORMATION NOTED DIRECTLY ON - IS. INSTALL EQUIPMENT A8 LISTED IN EQUIPMENT LIST INCLUDING 33. INSTALL NEW CONCRETE TANK AND DRIVE SLAMS, ANDOTHER CONCRETE As . USED TO SEAL THIS VIAL, <br /> APPROVED JOB COPY. SALVAGEABLE EQUIPMENT TO BE REINSTALLED, IF ANY, AND PROVIDE AND INDICATED ON SITE PLAN. CONCRETE SHALL HAVE A MINIMUM - <br /> INSTALL ALL OTHER EQUIPMENT AS REQUIRED TO.PROVIDE A COMPLETE COMPRESSIVE STRENGTH AT 28 DAYS OF 2500 P81. SOIL AND WATER SAMPLE6 SHALL BE ANALYZED FOR TOTAL 2 <br /> 14. CONTRACTOR SHALL PROVIDE A LIST OF SUB-CONTRACTORS, IF ANY, WHO PETROLEUM SYSTEM. ' HYDROCARBON$ BY THE METHODS OUTLINED IN "GUIDELINES FOR SHEET <br /> TITLE <br /> WILL BE USED ON THE PROJECT. 34. REPAIR AND/OR REPLACE A.C. PAVING_AND BASE TO MATCH ORIGINAL IN - ADDRESSING FUEL LEAKS. CALIFORNIA REGIONAL WATER QUALITY <br /> 19. PROVIDE AND INSTALL NEW PRODUCT, VENT, VAPOR, AND SECONDARY AREAS DISTURBED BY WORK - CONTROL BOARD, SAN FRANCISCO MAY REGION - SEPTEMBER 1985." sr <br /> 15. OBTAIN, T T SHALL COORDINATE ALL PROJECT, <br /> AND APPROVALS AND CONTAINMENT LINES PER DRAWINGS CURRENT MANUFACTURER'S 35. ANY ENVIRONMENTAL WORK REQUIRED OUTSIDE THE ABOVE SCOPE OF WORK LOAD TANK$ ON HIGHWAY CARRIER WITH PRESSURE RELIEF HOLE UP ON GEN. {VOTES , <br /> OBTAIN, D THE COMPLETION OF THE PROJECT, ALL CERTIFICATES INSTRUCTIONS SHALL BE ER INSTRUCTIONS. <br /> TI ALL. TIMES, AND SHALL HAVE SHALL BE DONE ON A TIME AND MATERIALS BASIS. RENTAL RECEIPTS, SAME DAY A8 REMOVAL. UNLESS THE TANK$ HAVE BEEN TRIPLE RINSED. �'+� <br /> REQUIRED 70 RUN THE FACILITY. - PRECEDENCE OVER OCHER INSTRUCTIONS. MANUFACTURER'S 15 COM CHECKLISTS SCOPE, <br /> SHALL BE COMPLETED BY THE CONTRACTOR, A6 EACH STEP IS COMPLETED. SUBCONTRACTOR INVOICES; MATERIAL RECEIPT$, AND DAILY LABOR TIME THE CARRIER MUST BE A:LICENSED WASTE HAULER AND MANIFESTS <br /> 16. GOVERNING CODES AND STANDARD$ INCLUDE, BUT SHALL NOT BE LIMITED SHEETS SHALL BE REQUIRED TO SUPPORT GENERAL CONTRACTOR TIME AND MUST ACCOMPANY THE TANKS. <br /> TO, THE STANDARDS OF THE FOLLOWING: A: PRODUCT PIPING: 2" PRIMARY PIPING WITH 3" CONTAINMENT, MATERIAL INVOICES. SUCH WORK SHALL BE BILLED SEPARATELY. CLOSURE <br /> SYSTEM AS APPROVED BY OWNER ALL PIPING AND CONTAINMENT SYSTEMS 3.0 REMOVAL OF PIPING <br /> AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) SHALL BE UL APPROVED FOR 100% METHANOL. CONTAINMENT SYSTEM SHALL <br /> AMERICAN PETROLEUM INSTITUTE (API) BE BY.THE SAME MANUFACTURER, WITH THE SAME SERIES ADHESIVE$ PIPING TO BE REMOVED SHALL BE EMPTIED OF ALL CONTENT$ PRIOR TO <br /> AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) AND/CR FITTINGS. REMOVAL. PIPING SHALL BE STOCKPILED ON-SITE PRIOR TO DISPOSAL. <br /> UNIFORM BUILDING CODE (UBC) <br /> NATIONAL ELECTRIC CODE (NEC) VISUALLY INSPECT PIPE TRENCH FOR INDICATION OF LEAKAGE. A SOIL <br /> NATIONAL FIRE PROTECTION AGENCY (NFPA) - SAMPLE SHALL BE TAKEN. AND ANALYZED FOR EACH TWENTY LINEAL //11 <br /> UNDERWRITER'S LABORATORIES, INC. (UL) - FEET OF TRENCH IF INSPECTION OF TRENCH REVEALS EVIDENCE OF PET <br /> s �1 <br /> CALIFORNIA CODE OF REGULATIONS (CCR) LEAKAGE. FOLLOW PROCEDURE LISTED IN SECTION 2,1 FOR SAMPLING V <br /> LOCAL ORDINANCES AND ANALYSIS. _ <br /> OF MEETS <br />